The present invention relates to a method for manufacturing a bearing washer.
Conventionally, a thrust needle bearing has a bearing washer manufactured through the following process: Initially, a rolled thin plate shaped steel material is coiled to prepare a coiled material. Subsequently, the coiled material is uncoiled to present the thin plate shaped steel material which is in turn punched and formed sequentially. As a result, a ring shaped formed body generally having a shape of a bearing washer is obtained. Subsequently, a setup step before a heat treatment is performed. Then, the heat treatment such as a carburizing treatment or the like is applied to the ring-shaped formed body. Thereafter, blast is applied to cool the formed body to thus quench the formed body. Finally, the quenched formed body is press-tempered (i.e., undergoes a tempering treatment) and thus has its shape adjusted. Through the above process, a bearing washer of a thrust needle bearing is manufactured.
Furthermore, as a technique employed to form a steel material, for example, a die-quenching method as disclosed in Japanese Patent Laying-Open No. 2008-296262 (Patent Literature 1) is known. This die-quenching method is a technique used to perform a quenching treatment by press-forming a heated steel material and simultaneously rapidly cooling the material by a die.
PTL 1: Japanese Patent Laying-Open No. 2008-296262
However, the bearing washer formed by the die-quenching method may have a problem called edge loading. In edge loading, a rolling element and bearing washers sandwiching the rolling element form a linear contact surface and thus come in contact with each other, so that an end portion of the contact surface is particularly liable to be adversely affected by an external force load. There is also a possibility that edge loading may cause the rolling element to cause differential slip. Differential slip is mutually opposite slipping movements caused at portions of surfaces between a rolling rolling element and bearing washers sandwiching the rolling element, and differential slip may impair in operability a bearing including the bearing washers. Japanese Patent Laying-Open No. 2008-296262 does not disclose any approach against these problems.
The present invention has been made in view of the above problems, and it is an object of the present invention to provide a method for manufacturing a bearing washer capable of suppressing damage caused by edge loading, and reducing heat generated by differential slip.
According to the present invention a method for manufacturing a bearing washer comprises: preparing a steel material and a forming unit for obtaining the bearing washer from the steel material; setting the steel material in the forming unit; and heating the steel material in the forming unit to a temperature equal to or higher than an A1 transformation point and subsequently punching a portion of the steel material in a form of a ring in the forming unit, and thereafter subjecting the steel material in the form of the ring to a quenching treatment in the forming unit to obtain the bearing washer. The steel material is heated and punched while tension is applied to the steel material in at least one direction along a surface of the steel material between first and second portions of the steel material distant from each other with the forming unit posed therebetween. The tension is applied to increase a distance between the first and second portions of the steel material by a length corresponding to an amount by which the distance between the first and second portions of the steel material thermally expands as the steel material is heated to the temperature in the step of heating and punching. The forming unit includes a first die for punching the steel material and a second die facing the first die, the first die or the second die having a forming surface having a concave curved surface.
According to the above method, a single forming unit can be used to perform the steps of heating a steel material, punching the steel material and quenching the steel material all temporally continuously successively and thus allow each step to require a reduced period of time and hence be performed significantly efficiently. Furthermore, the tension applied to the steel material, as described above, can enhance precision in punching a bearing washer out of the steel material.
In the above bearing washer manufacturing method the first or second die of the forming unit has a forming surface having a concave curved surface. As a result, the bearing washer is in a manner such that a contact surface on a bearing washer raceway surface thereof which a rolling element contacts has a convex curved surface. This can suppress damage caused by edge loading caused at the bearing washer raceway surface formed, or can reduce heat generated by differential slip.
In the above bearing washer manufacturing method preferably a die of the forming unit facing a die having the concave curved surface has a flat surface. Thus, the formed bearing washer on a side thereof opposite to a bearing washer raceway surface which a rolling element contacts, and out of contact with the rolling element, is formed to have a flat surface. As a result, a thrust needle bearing including the bearing washer generally has the flat surface as an outermost surface, and thus has a flat outermost surface, which helps to place and store the thrust needle bearing.
In the above bearing washer manufacturing method preferably the steel material contains 0.4% by mass or more of carbon, has a thickness of 2 mm or less, and is punched in a form of a ring in a direction of the thickness. Thereby, a bearing washer having a large hardness after a quenching treatment can be manufactured.
In the above bearing washer manufacturing method preferably the steel material is heated in at least one method selected from the group consisting of ohmic heating, indirect resistor heating, induction heating, contact heat transfer, and far-infrared heating. In the above bearing washer manufacturing method preferably the bearing washer with a hardness of 700 HV or more is obtained. The steel material subjected to a sufficient quenching treatment allows a bearing washer having large hardness to be manufactured through the quenching treatment.
In the above bearing washer manufacturing method preferably before the quenching treatment the steel material in the form of the ring is subjected to a forming step in the forming unit, and in the forming step, the steel material in the form of the ring has an inward or outward peripheral portion bent to be directed in the direction of the thickness of the steel material in the form of the ring. In this way, the forming step is also performed in the same forming unit as used to perform the steps of heating, punching and quenching the steel material through a single process temporally continuously successively. When this is compared with performing the steps separately, the former allows production to be done through a shorter process.
The present invention can thus suppress damage caused by edge loading caused at a bearing washer raceway surface formed, or can reduce heat generated by differential slip.
Hereinafter reference will be made to the drawings to describe the present invention in embodiments. In the drawings, identical or corresponding components are identically denoted and will not be described redundantly.
Initially, a configuration of a thrust needle roller bearing 1 according to one embodiment of the present invention will be described.
Bearing washer 11 is made of steel having a carbon concentration of 0.4% by mass or more, for example, and is in the form of a disc. Bearing washer 11 has a major surface with a bearing washer raceway surface 11A which needle roller 12 contacts. The paired bearing washers 11 are disposed to have their respective bearing washer raceway surfaces 11A facing each other. Bearing washer 11 has a Vickers hardness of 700 HV or more. Bearing washer 11 has bearing washer raceway surface 11A with a flatness of about 10 μm.
Needle roller 12 is made of steel and circumferentially has a roller rolling contact surface 12A. As shown in
Cage 13 is made of resin, for example, and holds the plurality of needle rollers 12 at a predetermined pitch in a circumferential direction of bearing washer 11. More specifically, cage 13 has an annular shape and a plurality of pockets (not shown) formed equidistantly in the circumferential direction. Cage 13 accommodates needle rollers 13 in the pockets.
The plurality of needle rollers 12 are held by cage 13 rollably on a circumferentially extending annular raceway of bearing washer 11. By the above arrangement, thrust needle roller bearing 1 includes a pair of bearing washer 11 located in an upper region A shown in
Hereinafter, a method for manufacturing a bearing washer according to the present embodiment will be described.
Initially, a steel material serving as a material for obtaining bearing washer 11 is prepared (S0). Specifically, referring to
Coiled material 2 is made of steel containing, for example, 0.4% by mass or more of carbon. More specifically, coiled material 2 is made of, for example, SAE 1070, JIS S40C, S45C, S50C, S55C and S60C serving as carbon steel materials for mechanical structures, JIS SUJ 2 serving as high carbon chromium bearing steel, JIS SK85 and SK95 serving as carbon tool steel materials, JIS SCM 440 and SCM 445 serving as alloy steel materials for mechanical structures. JIS SKS5 and SKS11 serving as alloy tool steel materials, JIS SUP13 serving as a spring steel material, or JIS SUS440C serving as a stainless steel material. Coiled material 2 is a thin plate-shaped steel material having a thickness of 2 mm or less.
Furthermore, a machine parts manufacturing apparatus 10 for obtaining bearing washer 11 from coiled material 2 is prepared (S0). Referring to
Initially, a first example of a configuration of processing unit 3 will be described with reference to
Pressing die 30 as the first die has a cylindrical pressing portion 35 as a portion for punching coiled material 2. Pressing portion 35 is brought into contact with coiled material 2 to punch coiled material 2. Furthermore, a concave curved surface 35A is formed on a lowermost surface of pressing portion 35, as observed in
Referring to
The second die has a base 36 for example in the form a flat plate on a side of forming die 31, 32 facing away from pressing die 30 (i e, a lower side in
Heating unit 4 is for heating coiled material 2 to a target temperature equal to or higher than an A1 transformation point, as will be described later. Heating unit 4 is provided to be capable of heating coiled material 2 by ohmic heating, and mainly includes a conduction terminal 41 for supplying a direct current to coiled material 2 and a stabilized direct current (DC) power supply 42 connected to conduction terminal 41. Heating unit 4 can heat coiled material 2 by passing a current through coiled material 2 from stabilized DC power supply 42 via conduction terminal 41. Conduction terminal 41 is located for example inwardly of a first clamp 51 and a second clamp 52 described later and can be brought into contact with coiled material 2 at a portion tensioned by first clamp 51 and second clamp 52. Stabilized DC power supply 42 preferably has a load regulation of 0.2% or less and a line regulation of 0.2% or less. Stabilized DC power supply 42 preferably has a sampling period of 10 ms or less. Note that load regulation is variation in voltage when a current of a load is changed while input is held constant, and it can be measured by measuring voltage when there is no load. Load regulation is represented as (EO−EL)/EO×100%, where EO represents voltage when there is no load and EL represents a rated voltage for a rated load. Line regulation is variation of an output voltage when an input voltage is changed, and it can be measured by measuring of a voltage of a load. Line regulation is represented as (ER−EM)/EM×100%, where ER represents an output voltage for a rated power supply voltage and EM represents an output voltage for an upper or lower limit of the rated power supply voltage. The sampling period is a reciprocal f [Hz] of an interval T [s] by sampling by A/D conversion.
Tensioning unit 5 is for applying tension to coiled material 2 in at least one direction along a surface of coiled material 2. Tensioning unit 5 mainly includes first clamp 51 and second clamp 52. First clamp 51 and second clamp 52 fix coiled material 2 punched by processing unit 3, and are provided to be capable of applying tension to coiled material 2. First clamp 51 and second clamp 52 are provided so as to be capable of changing between a state in which they vertically clamp coiled material 2 and a state in which they do not. While first clamp 51 and second clamp 52 may have any configuration, they may be hydraulic clamps or air clamps, for example.
First clamp 51 and second clamp 52 are provided at positions opposite to each other in a direction in which coiled material 2 extends, with pressing die 30 and forming dies 31, 32 posed therebetween. First clamp 51 is disposed on a side of supplying coiled material 2 in the above direction, and second clamp 52 is disposed on a side of discharging coiled material 2 in the above direction. In other words, coiled material 2 between a first portion clamped by first clamp 51 and a second portion clamped by second clamp 52 is at least partially located between pressing die 30 and forming dies 31, 32.
First clamp 51 and second clamp 52 are provided so as to be relatively movable in a direction in which they face each other (or the direction in which coiled material 2 extends). For example, first clamp 51 and second clamp 52 are hydraulic clamps, respectively, and include hydraulic cylinders (denoted by reference numerals 53, 54 in
First clamp 51 and second clamp 52 apply tension to coiled material 2 so as to increase a distance between the first portion and the second portion by an amount equal to or less than that by which coiled material 2 between the first and second portions thermally expands, for example, when coiled material 2 is heated to a target temperature described later. Herein, tension refers to a stress in the direction in which coiled material 2 extends. The amount by which coiled material 2 between the first and second portions thermally expands can be considered as the coefficient of thermal expansion of coiled material 2 (e.g., 10×10−5/° C.) multiplied by a distance L mm between the first portion and the second portion multiplied by a variation in temperature ΔT° C. of coiled material 2 after it is clamped. First clamp 51 and second clamp 52 are preferably provided so as to be capable of applying a tension greater than 0 MPa and less than 50 MPa, more preferably a tension greater than 0 MPa and 30 MPa or less, to coiled material 2. For example, first clamp 51 and second clamp 52 are provided so as to be capable of applying a tension of 10 MPa to coiled material 2. The tension applied to coiled material 2 can be measured for example by using a load cell before the material is set. Alternatively, the tension applied to coiled material 2 can be measured by attaching a load cell to a movable part of a clamping device.
Controller 6 is for controlling heating unit 4. Controller 6 is provided to be capable of controlling an output of heating unit 4 (a value of a current that stabilized DC power supply 42 supplies to coiled material 2 via conduction terminal 41). Controller 6 can decrease the output of heating unit 4 before coiled material 2 heated by heating unit 4 reaches a target temperature described later. Controller 6 may include a temperature measuring unit (not shown) for measuring the temperature of coiled material 2. In that case, controller 6 can decrease the output of heating unit 4 when the temperature of coiled material 2 measured by the temperature measuring unit reaches a predetermined temperature lower than the target temperature. Controller 6 decreases the output of heating unit 4 when coiled material 2 reaches a temperature of 80% or more to 95% or less of the target temperature, for example Controller 6 may be provided to be capable of controlling processing unit 3. Controller 6 may be provided to be capable of controlling tensioning unit 5. Controller 6 may be provided so as to be capable of controlling the tension applied to coiled material 2 by tensioning unit 5 in accordance with the output of heating unit 4 or the temperature of coiled material 2 measured by the temperature measuring unit Machine parts manufacturing apparatus 10 having the above configuration is prepared.
Subsequently, coiled material 2 is set in processing unit (S1). Specifically, coiled material 2 is clamped by first clamp 51 and second clamp 52 of processing unit 3 (S2). First clamp 51 and second clamp 52 receive pressure for holding coiled material 2.
Subsequently, coiled material 2 is tensioned (S3). Specifically, at least one of first clamp 51 and second clamp 52 is relatively moved away from the other in the direction in which coiled material 2 extends. Accordingly, a region of coiled material 2 located between a portion clamped by first clamp 51 and a portion clamped by second clamp 52 receives a tension depending on an amount of relative movement of first clamp 51 and second clamp 52 (an amount by which a distance between first clamp 51 and second clamp 52 change). Tension applied to coiled material 2 is greater than 0 MPa and less than 50 MPa, preferably greater than 0 MPa and 30 MPa or less. First clamp 51 and second clamp 52 have their relative positional relationship held at least until press-forming the material ends (S9). That is, the tension applied to coiled material 2 is held at least while the material is heated and press-formed.
Subsequently, ohmic heating is started (S4). More specifically, referring to
After the ohmic heating is started, before coiled material 2 reaches the target temperature, the output of heating unit 4 is decreased (S5). Preferably, when coiled material 2 reaches a temperature of 80% or higher and 95% or lower of the target temperature, controller 6 decreases the value of the current supplied by stabilized DC power supply 42 to coiled material 2. The current is reduced to a value I2 (see
Coiled material 2 is heated to a temperature (a target temperature), which is equal to or higher than the temperature of the A1 transformation point of steel composing coiled material 2, and it is for example 1000° C. “A1 transformation point” refers to a point corresponding to a temperature at which heated steel has a structure starting transformation from ferrite to austenite. Accordingly, the above ohmic heating transforms the structure of the steel composing coiled material 2 into austenite. Furthermore, the output of heating unit 4 is decreased at a temperature T1, which is preferably a temperature of 80% to 95% of the target temperature of coiled material 2, and for example when the target temperature is 1000° C., temperature T1 is preferably 800° C. to 950° C. It is also preferable that an overshoot of the temperature heating coiled material 2 by heating unit 4 be suppressed within 1% of the target temperature.
The output of heating unit 4 since the ohmic heating was started until it ends may be controlled through feedback. For example, machine parts manufacturing apparatus 10 may comprise a temperature measuring unit capable of measuring the temperature of coiled material 2, and the output of heating unit 4 since the ohmic heating was started until it ends may be controlled through feedback based on the temperature of coiled material 2 measured by the temperature measuring unit. Preferably, the output of heating unit 4 since the ohmic heating was started until it ends is preferably controlled in an output pattern previously set depending on the workpiece, or coiled material 2. For example, it is preferable that value I1 of a current supplied to coiled material 2 since electrical conduction was started, a time at which coiled material 2 receiving the current having value I1 reaches 80% to 95% of the target temperature, value I2 of a current capable of suppressing a temperature overshoot to 1% or less of the target temperature, a time at which coiled material 2 receiving the current having value I2 reaches the target temperature, and a period of time for which coiled material 2 is held at the target temperature be previously obtained, and set as a pattern of an output of heating unit 4. When the method for manufacturing a bearing washer according to the present embodiment is compared with a case implemented through feedback control, the former can reduce a production time by a period of time involved in feedback control (for example several milliseconds to several tens of milliseconds) and can thus achieve high throughput.
Subsequently, press-forming coiled material 2 is started (S8). Specifically, with reference to
Subsequently, with reference to
Thus, formed body 2A is formed to have a desired shape. That is, referring to
Referring again to
Referring again to
Hereinafter, with reference to
Hereinafter, with reference to
In the method for manufacturing bearing washer 11 by using processing unit 3 of
Referring to
Subsequently, with reference to
Referring to
Furthermore, as well as
Note that although not shown, to the third example of processing unit 3 shown in
Note that when coiled material 2 undergoes the heat treatment in the air, the method for manufacturing a bearing washer according to the present embodiment preferably comprises after the step of heating, punching and quenching the steel material the step of removing an oxide film (oxide scale) formed on a surface of bearing washer (or formed body) 11. While the oxide film may be removed in any method, directing at bearing washer 11 hard particles made of steel or the like, or shot blasting, may be performed.
The method for manufacturing a bearing washer according to the present embodiment is not limited to the above configuration.
A method for applying tension to coiled material 2 is not limited to a method using first clamp 51 and second clamp 52 provided near pressing die 30 and forming dies 31, 32 of processing unit 3. For example, instead of first clamp 51 in
For example, causing supply unit 60 to perform a rewinding operation can apply tension to coiled material 2 held by supply unit 60 and second clamp 52 between two points in the direction in which coiled material 2 extends. Further, moving second clamp 52 away from correction unit 70 in the direction in which coiled material 2 extends can apply tension to coiled material 2 held by correction unit 70 and second clamp 52 between two points in the direction in which coiled material 2 extends.
The method for heating coiled material 2 is not limited to ohmic heating using a direct current, and it may be at least one selected from the group consisting of ohmic heating using an alternating current, indirect resistor heating, induction heating, contact heat transfer, and far-infrared heating. Each heating method will more specifically be described below.
Referring to
Referring to
Referring to
Referring to
Further, while the method for manufacturing a bearing washer according to the present embodiment bends an inward peripheral portion of formed body 2A in the direction of the thickness of formed body 2A, as shown in
Further, first clamp 51 and second clamp 52 may each have members vertically clamping and thus holding coiled material 2 with one member also serving as conduction terminal 41. In that case, first clamp 51 and second clamp 52 have the other member opposite to one member with coiled material 2 therebetween, and incapable of conduction with one member. This allows processing unit 3 to have a simplified configuration.
A function and effect of the method for manufacturing a bearing washer according to the present embodiment will be described with reference to a comparative example. Initially, a method for manufacturing a bearing washer according to the comparative example will be described with reference to
Subsequently, with reference to
In contrast, the method for manufacturing a bearing washer according to the present embodiment allows coiled material 2 to undergo a heating step, a punching step, a forming step, and a quenching step all performed in machine parts manufacturing apparatus 10 through a single process. When this is compared with a case in which the steps are separately performed, as done in the method for manufacturing a bearing washer according to the comparative example, the former allows a shorter manufacturing process. This allows a bearing washer to be manufactured at a further reduced cost and hence more inexpensively.
Furthermore, in the method for manufacturing a bearing washer according to the present embodiment at the step of heating and punching the steel material, coiled material 2 is heated and punched while coiled material 2 is tensioned in at least one direction along a surface of coiled material 2. When this is compared with heating and punching a steel material without applying tension thereto to obtain a bearing washer, the former allows a resultant bearing washer to have better quality through the process.
Specifically, when the steel material is heated in the forming unit to a temperature equal to or higher than the A1 transformation point without the above tension applied to the steel material, the steel material is deformed as it is heated. In particular, a thrust needle roller bearing has a bearing washer having a small thickness and hence deformable when it is heated. When the steel material is thus deformed, there is a possibility that the deformed portion comes into contact with a part of processing unit 3 (a press) (e.g., forming die 32). When the deformed portion thus comes into contact with a part of processing unit 3, the heat imparted to the steel material is dissipated from the portion in contact with processing unit 3 to the forming unit, so that the steel material (in particular, a portion to be processed, e.g., a portion between portions held by the two clamps) has a thermal distribution and may have a portion which is not heated to a temperature equal to or higher than the A1 transformation point. As a result, a bearing washer which is obtained by heating a steel material in the forming unit to a temperature equal to or higher than the A1 transformation point without the above tension applied to the steel material, and furthermore, punching and quenching the heated steel material, may not be processed to have sufficient quality as the steel is deformed, as described above, and thus insufficiently heated. Furthermore, when the steel material is punched in the forming unit without the above tension applied to the steel material, the steel material will be punched in a deformed state caused as the steel material is heated, and as a result, the steel material is punched less precisely.
In contrast, in the method for manufacturing a bearing washer according to the present embodiment at the step of heating and punching the steel material, coiled material 2 is heated while coiled material 2 is tensioned in at least one direction along a surface of coiled material 2, which can reduce or prevent deformation of coiled material 2 caused as it is heated. This can prevent coiled material 2 from coming into contact with processing unit 3 and hence suppress heat dissipation from coiled material 2 to processing unit 3 via a portion of coiled material 2, and coiled material 2 can thus have the portion to be processed, as described above, entirely heated to a temperature equal to or higher than the A1 transformation point. Further, coiled material 2 less deformed or free from deformation is punched. As a result, bearing washer 11 manufactured in the method for manufacturing a bearing washer according to the present embodiment is punched with less impaired precision and thus processed with high precision. Further, bearing washer 11 has less varying quality through processing.
Furthermore, the present inventors have found that a bearing washer manufactured has a surface roughness varying with a relationship between a tension applied to coiled material 2 and an amount by which a distance between the first and second portions of coiled material 2 thermally expands in the step of heating and punching the steel material. The tension applied to coiled material 2 between the first and second portions in the step of heating and punching the steel material is applied to increase a distance between the first and second portions of coiled material 2 by a length corresponding to an amount by which the distance between the first and second portions thermally expands as coiled material 2 is heated to the above temperature in the step of heating and punching the steel material. The present inventors have confirmed that a bearing washer manufactured with such a small tension applied to coiled material 2, as described above, has a smaller surface roughness than a bearing washer similarly manufactured although a large tension which increases the distance between the first and second portions to be larger than the above amount of thermal expansion is applied to coiled material 2 (details will be described later). That is, when the method for manufacturing a bearing washer according to the present embodiment is compared with heating and punching coiled material 2 while applying thereto a large tension allowing deformation larger than the amount of thermal expansion, the former allows a resultant bearing washer to have a surface with better quality.
Preferably, the tension is applied to increase the distance between the first and second portions of coiled material 2 by an amount by which the distance between the first and second portions of coiled material 2 thermally expands as coiled material 2 is heated to a temperature equal to or higher than the A1 transformation point. Such a method for manufacturing a bearing washer allows bearing washer 11 to be punched with maximally improved precision and simultaneously allows bearing washer 11 to have a surface with maximally improved quality, and can thus manufacture bearing washer 11 which is inexpensive and has high quality through processing.
The tension is preferably greater than 0 MPa and less than 50 MPa. As shown in
In the method for manufacturing a bearing washer at the step of heating and punching the steel material, tension is applied to coiled material 2 by using at least one of supply unit 60 provided to be capable of supplying coil material 2 to processing unit 3, correction unit 70 provided to be capable of correcting distortion of a steel material supplied from supply unit 60 to processing unit 3, and first clamp 51 provided to be capable of holding a portion of coil material 2; and second clamp 52 located on a side opposite to one of supply unit 60, correction unit 70 and first clamp 51 with respect to processing unit 3 and provided to be capable of holding another portion of coil material 2. At least one of supply unit 60, correction unit 70 and first clamp 51, and second clamp 52, each holding coiled material 2, can be moved relatively away from each other to apply tension to coiled material 2 heated and punched in processing unit 3. Bearing washer 11 which is inexpensive and has high quality though processing can thus be obtained.
Subsequently, in the method for manufacturing a bearing washer, processing unit 3 as a forming unit includes a first die, for example pressing die 30, for punching coiled material 2, and a second die opposite thereto or forming dies 31, 32. Then, as shown in
Convex surface 11B can be less probable to cause edge loading and differential slip with needle roller 12 in contact therewith. This can reduce damage caused by edge loading, and heat generated by differential slip. In particular, edge loading is a problem caused as bearing washer 11 and needle roller 12 contact along a very flat linear surface and an end portion of the surface thus becomes sensitive to sharing external force. Edge loading can be suppressed by forming convex surface 11B to make a surface thereof in contact with needle roller 12 a curved surface. Furthermore, suppressing edge loading can suppress mutually opposite slipping movements caused at portions of surfaces between a rolling rolling element and bearing washers sandwiching the rolling element, or differential slip. The thrust needle bearing can thus be operated more stably and have an increased lifetime.
Further, the other surface that is flat surface 11C allows the thrust needle bearing as a whole to have a flat outermost surface and hence be stably placed and stored.
In the method for manufacturing a bearing washer, coiled material 2 may contain 0.4% by mass or more of carbon. Coiled material 2 may have a thickness of 2 mm or less. Further, coiled material 2 may be punched in the form of a ring in the direction of its thickness. This allows bearing washer 11 having large hardness after a quenching treatment to be manufactured. Furthermore, such a relatively thin coiled material 2 is easily punched and can also sufficiently be quenched.
In the method for manufacturing a bearing washer as described above, coiled material 2 may be heated in at least any one method selected from the group consisting of ohmic heating, indirect resistor heating, induction heating, contact heat transfer, and far-infrared heating. Thus in the method for manufacturing a bearing washer as described above any heating method can be used to heat coiled material 2.
In ohmic heating, coiled material 2 may be heated by heat generated by supplying a direct current or an alternating current to coiled material 2. Thus, ohmic heating can be done using any of direct current and alternating current.
In the method for manufacturing a bearing washer as described above, bearing washer 11 having a hardness of 700 HV or more may be obtained. Thus, in the method for manufacturing a bearing washer, by shortening a manufacturing process and subjecting coiled material 2 to a sufficient quenching treatment, bearing washer 11 having large hardness after the quenching treatment can be manufactured.
In the method for manufacturing a bearing washer as described above, before the quenching treatment, a ring-shaped steel material (ring-shaped formed body 2A) may be subjected to a forming step in processing unit 3. In the forming step, ring-shaped steel material 2A may have an inward or outward peripheral portion bent to be directed in the direction of the thickness of ring-shaped steel material 2A. Thus coiled material 2 can undergo a heating step, a punching step, a forming step, and a quenching step all performed in machine parts manufacturing apparatus 10 through a single process. This allows bearing washer 11 to be manufactured through a further shortened process. Further, bearing washer 11 for a thrust bearing can be manufactured which has a ring shape with an inward or outward peripheral portion bent in the direction of its thickness.
In the method for manufacturing a bearing washer at the step of heating and punching the steel material, coiled material 2 may be heated in an oxygen-containing atmosphere, and after the step of heating, punching and quenching the steel material to obtain bearing washer 11, the step of removing an oxide film formed on a surface of bearing washer 11 may be included. After the step of removing the oxide film, bearing washer 11 has a surface roughness Ra of 0.15 μm or less. That is, according to the method for manufacturing a bearing washer according to the present embodiment, bearing washer 11 having a small surface roughness and high processing precision can be manufactured in an atmosphere of the air at low cost.
Furthermore, when the method for manufacturing a bearing washer according to the present embodiment that employs machine parts manufacturing apparatus 10 as described above allows bearing washer 11 to be manufactured in a shorter period of time than a conventional method for manufacturing a bearing washer by using such a conventional machine parts manufacturing apparatus as shown in
More specifically, machine parts manufacturing apparatus 10 comprises: heating unit 4 configured to heat coiled material 2 by ohmic heating to a target temperature equal to or higher than an A1 transformation point; tensioning unit 5 formed to be capable of applying tension to coiled material 2 in at least one direction along a surface of coiled material 2; processing unit 3 configured to punch a portion of coiled material 2 heated by heating unit 4 and tensioned by tensioning unit 5 and also rapidly cool and thus quench the punched portion of coiled material 2; and controller 6 configured to control a heating temperature applied by heating unit 4. Controller 6 reduces an output of heating unit 4 before coiled material 2 reaches the target temperature.
Machine parts manufacturing apparatus 10 as described above can increase the output of heating unit 4 (or a value of a current) to rapidly heat coiled material 2 to the target temperature. Furthermore, when heating unit 4 having an output reduced as controlled by controller 6 before coiled material 2 reaches the target temperature is compared with heating unit 4 having an output reduced after coiled material 2 reaches the target temperature, as in conventional die-quenching, the former can suppress more an overshoot of the temperature of coiled material 2 after the temperature of coiled material 2 reaches the target temperature than the latter. Thus when machine parts manufacturing apparatus 10 is compared with a machine parts manufacturing apparatus used in conventional die-quenching, the former allows a bearing washer manufacturing method to have a shorter period of time after ohmic heating is started before it is completed than the latter, and allows bearing washer 11 to be manufactured in a shorter period of time than latter. That is, machine parts manufacturing apparatus 10 allows the bearing washer manufacturing method to achieve high throughput. Further, tensioning unit 5 that can apply tension to coiled material 2 disposed between pressing die 30 and forming dies 31, 32 allows bearing washer 11 to have high processing quality, as described above.
In machine parts manufacturing apparatus 10, heating unit 4 preferably includes stabilized DC power supply 42. This allows controller 6 to control a value of a direct current supplied from heating unit 4 to coiled material 2 with high accuracy. Machine parts manufacturing apparatus 10 as described above can effectively suppress an overshoot of the temperature of coiled material 2 after the temperature of coiled material 2 reaches the target temperature.
Stabilized DC power supply 42 preferably has a load regulation of 0.2% or less and a line regulation of 0.2% or less. Such a stabilized DC power supply 42 has an output voltage with variation sufficiently suppressed relative to variation of an input voltage and a load current, and can sufficiently suppress variation of a value of a current supplied to coiled material 2. As a result, machine parts manufacturing apparatus 10 having such a stabilized DC power supply 42 can more effectively suppress an overshoot of the temperature of coiled material 2 after the temperature of coiled material 2 reaches the target temperature.
Stabilized DC power supply 42 preferably has a sampling period of 10 ms or less. As a result, stabilized DC power supply 42 can sample variation of output voltage with a period of 10 ms or less. Controller 6 can control a value of a direct current supplied from heating unit 4 to coiled material 2 with high accuracy based on data sampled by stabilized DC power supply 42.
Controller 6 is preferably provided to decrease the output of heating unit 4 when coiled material 2 reaches a temperature of 80% or more to 95% or less of the target temperature. As a result, controller 6 can more effectively suppress an overshoot of the temperature of coiled material 2 after the temperature of coiled material 2 reaches the target temperature. As a result, the overshoot of the temperature of coiled material 2 heated by heating unit 4 can be within 1% of the target temperature. Using such a machine parts manufacturing apparatus 10 allows bearing washer 11 to be manufactured in a shorter period of time than the conventional bearing washer manufacturing method as described above.
It has been confirmed that bearing washer 11 manufactured in the method for manufacturing a bearing washer according to the present embodiment has a high processing quality through the following evaluation. This will be described below with reference to
Specifically, the bearing washer manufacturing method according to the present embodiment was carried out using coiled material 2 made of steel material of SAE 1070 and machine parts manufacturing apparatus 10 shown in
Machine parts manufacturing apparatus 10 shown in
Referring to
Referring to
In this way a plurality of bearing washers 11 (steel: SAE 1070) were manufactured and subjected to Vickers hardness measurement, and found to have an average hardness of about 790 HV. In addition, when bearing washer 11 had a portion cut, a cut surface corroded with nital, and its microstructure observed with an optical microscope, a martensite structure as shown in the photograph of
Thus, it has been confirmed that the bearing washer manufacturing method according to the present embodiment allows bearing washer 11 to be manufactured through a shorter process, sufficiently quenched to have large hardness, and also have high processing quality. Moreover, it is believed that the bearing washer having a surface with convex surface 11B (see
While embodiments and examples of the present invention have been described as above, the embodiments can be variously modified. Further, the present invention is not limited in scope to the above-described embodiments. The scope of the present invention is defined by the terms of the claims, and is intended to include any modifications within the meaning and scope equivalent to the terms of the claims.
The bearing ring manufacturing method of the present invention is particularly advantageously applicable to a method for manufacturing a bearing ring required to be processed with high precision.
1 thrust needle roller bearing, 2, 200 coiled material, 3 processing unit, 4 heating unit, 5 tensioning unit, 6 controller, 10 machine parts manufacturing apparatus, 11 bearing washer, 11A bearing washer raceway surface, 11B convex surface, 11C flat surface, 11D bent portion, 12 needle roller, 12A roller rolling surface, 13 cage, 30 pressing die, 31, 32 forming die, 31A, 32A convex portion, 35 pressing portion, 35A, 36A curved surface, 35B cutout portion, 35C water cooling circuit, 36 base, 41 conduction terminal, 42 stabilized DC power supply, 51 first clamp, 52 second clamp, 53, 54 cylinder, 60 supply unit, 70 correction unit, 100 object to be heated, 102 heating element, 103 coil, 104 AC power supply, 105 internal heating roll, 106 external heating roll, 200 formed body, 300, 310, 320, 330 die, 400 carburizing furnace, 410 bar, 420 blast, 430 tempering furnace.
Number | Date | Country | Kind |
---|---|---|---|
2016-102344 | May 2016 | JP | national |
Filing Document | Filing Date | Country | Kind |
---|---|---|---|
PCT/JP2017/016168 | 4/24/2017 | WO | 00 |