Claims
- 1. Method for manufacturing a tubular foundation in the ground comprising the steps of:
- (1) providing a tool for making holes in the ground, said tool comprising a ram tip having a free end and coupling means for connecting the ram tip to a drive device;
- (2) providing a drive device for successively exciting the ram tip downwardly in the direction of the free end with at least one of vibration and percussion;
- (3) coupling the drive device immediately behind the ram tip;
- (4) selecting a location for making a hole in the ground;
- (5) placing the tool thereat;
- (6) setting the drive device into operation such that the tool is excited with at least one of vibration and percussion at a chosen frequency downwardly in the direction of the free end of the ram tip;
- (7) penetrating the ground with the ram tip to form a hole;
- (8) making the hole having a depth which is smaller than a depth of a tubular foundation to be manufactured;
- (9) pulling the ram tip out of the hole;
- (10) at least partially filling the hole with pourable concrete;
- (11) re-inserting the ram tip in the hole before the concrete has cured;
- (12) setting the drive device into operation such that the hole is extended to the desired depth, and the concrete present therein forms a concrete tube round the ram tip and is compacted; and
- (13) pulling the ram tip out of the tubular foundation.
- 2. The method as claimed in claim 1 wherein in step (8) the hole is made having a depth approximately equal to half the depth of the finished tubular foundation.
- 3. The method as claimed in claim 1 wherein in step (10) the hole is filled to approximately half its depth with pourable concrete.
- 4. Method as claimed in claim 1, wherein in step (12) the concrete tube is formed such that the concrete extends to a top edge of the hole.
- 5. The method as claimed in claim 1 further comprising anchoring in the tubular foundation supporting means having an active cross section smaller than a corresponding cross section of the tubular foundation.
- 6. The method as claimed in claim 5 further comprising placing particulate material around the supporting means in the tubular foundation such that the supporting means is removably anchored.
Priority Claims (2)
Number |
Date |
Country |
Kind |
2520/90 |
Dec 1990 |
ATX |
|
9101507 |
Sep 1991 |
NLX |
|
Parent Case Info
This application is a continuation of application Ser. No. 08/075,465, filed Sep. 17, 1993 now abandoned, which is a 371 of PCT/EP91/02394 filed Dec. 12, 1991, published as WO92/10637 Jun. 25, 1992.
US Referenced Citations (16)
Foreign Referenced Citations (17)
Number |
Date |
Country |
351970 |
Jun 1928 |
BEX |
0 227 576 A2 |
Jul 1987 |
EPX |
0 372 225 A2 |
Jun 1990 |
EPX |
1230326 |
Jan 1959 |
FRX |
1364218 |
May 1964 |
FRX |
2211869 |
Jul 1974 |
FRX |
2314309 |
Jul 1977 |
FRX |
216258 |
Oct 1907 |
DEX |
89 12 404.9 |
Jan 1990 |
DEX |
A-59-210124 |
Nov 1984 |
JPX |
1535940 |
Jan 1990 |
RUX |
1535941 |
Jan 1990 |
RUX |
2000389 |
Sep 1993 |
RUX |
141248 |
Oct 1930 |
CHX |
1448378 |
Sep 1976 |
GBX |
2064625 |
Jun 1981 |
GBX |
2195682 |
Apr 1988 |
GBX |
Non-Patent Literature Citations (1)
Entry |
59-210124 (A) from Patent Abstracts of Japan, vol. 9, No. 80 . |
Continuations (1)
|
Number |
Date |
Country |
Parent |
75465 |
Sep 1993 |
|