Claims
- 1. A method for manufacturing a plastic worked article by plastic working an article for plastic working, comprising the steps of:
shaping an article for plastic working by a semisolid molding in which molten metal including both a solid phase and a liquid phase is introduced into a die; performing a pre-plastic working heat treatment on the article for plastic working for causing blisters by expanding gas cavities included in the article for plastic working; and forming a plastic worked article by plastic working the article for plastic working after the pre-plastic working heat treatment, wherein the plastic working of the article for plastic working is performed in such a manner that a tensile stress applied direction at a tensile stress applied portion to which tensile stress is principally applied in actual use of the plastic worked article substantially accords with a plastic flow direction at a portion of the article for plastic working corresponding to the tensile stress applied portion.
- 2. The method for manufacturing a plastic worked article of claim 1,
wherein the pre-plastic working heat treatment is performed with a processing temperature in a range of 300° C. to 550° C.
- 3. The method for manufacturing a plastic worked article of claim 2,
wherein the pre-plastic working heat treatment is performed with a processing time of 1 hour or more.
- 4. The method for manufacturing a plastic worked article of claim 3,
wherein the pre-plastic working heat treatment is performed with a processing temperature in a range of 350° C. to 450° C. and a processing time of 20 hours or less.
- 5. The method for manufacturing a plastic worked article of claim 4,
wherein the pre-plastic working heat treatment is performed with a processing time in a range of 10 hours to 20 hours.
- 6. The method for manufacturing a plastic worked article of claim 1, further comprising a step of performing a post-plastic working heat treatment on the plastic worked article obtained by the plastic working with a processing temperature in a range of 250° C. to 400° C. and a processing time in a range of 20 minutes to 10 hours.
- 7. The method for manufacturing a plastic worked article of claim 1,
wherein the article for plastic working is shaped by the semisolid molding using an injection molding apparatus equipped with a cylinder and a screw.
- 8. The method for manufacturing a plastic worked article of claim 1,
wherein a thick part is provided on the portion of the article for plastic working corresponding to the tensile stress applied portion, and the article for plastic working is shaped into a desired shape by the plastic working by allowing the thick part to flow in a direction substantially according with the tensile stress applied direction.
- 9. The method for manufacturing a plastic worked article of claim 1,
wherein the plastic worked article is a road wheel, and the plastic working of the article for plastic working is performed in such a manner that a direction substantially along an extending direction of a spoke of a wheel disk of the road wheel substantially accords with a plastic flow direction at a portion of the article for plastic working corresponding to the wheel disk.
- 10. The method for manufacturing a plastic worked article of claim 1,
wherein the plastic worked article is a road wheel, and the plastic working of the article for plastic working is performed in such a manner that a direction substantially along a width of a wheel rim of the road wheel substantially accords with a plastic flow direction at a portion of the article for plastic working corresponding to the wheel rim.
Priority Claims (1)
Number |
Date |
Country |
Kind |
2001-092234 |
Mar 2001 |
JP |
|
Parent Case Info
[0001] This is a continuation of Application PCT/JP02/02532, filed Mar. 18, 2002, now abandoned.
Continuations (1)
|
Number |
Date |
Country |
Parent |
PCT/JP02/02532 |
Mar 2002 |
US |
Child |
10353050 |
Jan 2003 |
US |