The present invention relates to a method for manufacturing a resin container and a device for manufacturing a resin container.
In PTL 1, a hot parison type blow molding device and a method of manufacturing a resin container using the same are described. In PTL 2, a large-sized container is described, which is obtained by injection-molding a polyester resin into a bottomed cylindrical preform, adjusting a temperature of the preform and then blow-molding the preform.
PTL 1: JP H08-132517 A
PTL 2: JP H11-034152 A
In manufacturing a resin container, there are market needs for improvement in hot parison type (1 step type to 1.5 step type) blow molding using heat retained during injection molding of a preform. Examples of the market needs include enhancing an amount of production of containers per unit time, maintaining or improving a quality of the containers even under a short cycle time, being capable of coping with molding of special containers and the like.
An object of the present invention is to provide a method for manufacturing a resin container and a device for manufacturing a resin container, in which it is possible to maintain or improve a quality of resin containers even under a short cycle time while enhancing an amount of production of the containers per unit time.
In order to solve the above object, a method for manufacturing a resin container according to one aspect of the present includes:
an injection molding step of injection-molding a plurality of preforms along a predetermined arrangement direction;
a temperature adjustment step of adjusting a temperature of the preforms;
a blow molding step of molding resin containers from the preforms;
after the injection molding step, conveying the preforms and the containers through the temperature adjustment step and the blow molding step along a conveying direction intersecting the arrangement direction; and
between the injection molding step and the temperature adjustment step, a changing step of changing an orientation of the preforms aligned in the arrangement direction to an orientation aligned along the conveying direction.
Preferably, in the manufacturing method for the resin container as described above,
the changing step includes:
Preferably, in the manufacturing method for the resin container as described above,
a preform positioned at one end of the preforms along the arrangement direction in the injection molding step is defined as a first preform and a preform positioned at the other end of the preforms along the arrangement direction in the injection molding step is defined as a N1th preform, N1 being an integer of 2 or more, and
the changing step includes changing the orientation of the preforms aligned in the arrangement direction to the orientation aligned along the conveying direction in such a way that the first preform is at a forefront.
Preferably, in the manufacturing method for the resin container as described above,
the injection molding step includes an injection step of injecting a molten resin into cavities to mold the preforms, and a post-cooling step of cooling the preforms released from the cavities after molded in the injection step.
Preferably, in the manufacturing method for the resin container as described above,
the changing step includes allowing the preforms to be cooled in an air.
Preferably, in the manufacturing method for the resin container as described above,
the temperature adjustment step includes: a normal temperature adjustment step of adjusting a temperature of the preforms; and a local temperature adjustment step of locally adjusting the temperature of the preforms.
In order to solve the above object, a device for manufacturing a resin container according to one aspect of the present includes:
an injection molding station configured to injection-mold a plurality of preforms along a predetermined arrangement direction;
a temperature adjustment station configured to adjust a temperature of the preforms;
a blow molding station configured to mold resin containers from the preforms;
a conveying mechanism configured to convey the preforms and the containers through the temperature adjustment station and the blow molding station along a conveying direction intersecting the arrangement direction; and
a changing mechanism provided between the injection molding station and the temperature adjustment station, the changing mechanism being configured to change an orientation of the preforms aligned in the arrangement direction to an orientation aligned along the conveying direction.
Preferably, in the device for manufacturing the resin container as described above,
the changing mechanism includes:
Preferably, in the device for manufacturing the resin container as described above,
a preform positioned at one end of the preforms along the arrangement direction in the injection molding station is defined as a first preform and a preform positioned at the other end of the preforms along the arrangement direction in the injection molding station is defined as a N1th preform, N1 being an integer of 2 or more, and
the changing mechanism is configured to change the orientation of the preforms aligned in the arrangement direction to the orientation aligned along the conveying direction in such a way that the first preform is at a forefront.
Preferably, in the device for manufacturing the resin container as described above,
the injection molding station includes: an injection unit configured to inject a molten resin into cavities to mold the preforms; and a post-cooling unit configured to cool the preforms released from the cavities after molded in the injection unit.
Preferably, in the device for manufacturing the resin container as described above,
the device includes a cooling unit provided between the injection molding station and the temperature adjustment station and configured to allow the preforms to be cooled in an air,
the changing mechanism is provided in the cooling unit.
Preferably, in the device for manufacturing the resin container as described above,
the temperature adjustment station includes: a normal temperature adjustment unit configured to adjust a temperature of the preforms; and a local temperature adjustment unit configured to locally adjust the temperature of the preforms.
In order to solve the above object, a method for manufacturing a resin container according to another aspect of the present invention includes:
an injection molding step of injection-molding a plurality of preforms along a predetermined arrangement direction;
a temperature adjustment step of adjusting a temperature of the preforms;
a blow molding step of molding resin containers from the preforms; and
after the injection molding step, conveying the preforms and the containers through the temperature adjustment step and the blow molding step along a conveying direction intersecting the arrangement direction, and
the injection molding step includes: an injection step of injecting a molten resin into cavities to mold the preforms; and a post-cooling step of cooling the preforms released from the cavities after molded in the injection step.
In order to solve the above object, a device for manufacturing a resin container according to another aspect of the present invention includes:
an injection molding station configured to injection-mold a plurality of preforms along a predetermined arrangement direction;
a temperature adjustment station configured to adjust a temperature of the preforms;
a blow molding station configured to mold resin containers from the preforms; and
a conveying mechanism configured to convey the preforms and the containers through the temperature adjustment station and the blow molding station along a conveying direction intersecting the arrangement direction, and
the injection molding station includes: an injection unit configured to inject a molten resin into cavities to mold the preforms; and a post-cooling unit configured to cool the preforms released from the cavities after molded in the injection unit.
According to the present invention, a method for manufacturing a resin container and a device for manufacturing a resin container, in which it is possible to maintain or improve a quality of resin containers even under a short cycle time while enhancing an amount of production of the containers per unit time, can be provided.
Hereinafter, embodiments of the present invention will be described with reference to the accompanying drawings. Meanwhile, it should be noted that dimensions of members shown in the figures may be differ from actual dimensions of the members for convenience of explanation.
A plurality of conveying members 600 (600a, 600b, 600c, 600d) each configured as a conveying mechanism (e.g., a parallel moving chuck (hand)) are provided through the changing unit 150, the temperature adjustment station 200, the blow molding station 300 and the take-out station 400. The plurality of conveying members 600 are configured to intermittently convey at least one of the preforms 10 and containers 20 per stroke along a conveying path A, which is a conveying direction extending linearly from the transfer member 500 to the take-out station 400.
The injection molding station 100 is configured to injection-mold a plurality of preforms 10 such that the plurality of preforms 10 are aligned along an arrangement direction C. The injection molding station 100 includes at least one first injection mold 110 and at least two second injection molds 120a, 120b. The first injection mold 110 includes an injection cavity mold 112 having a plurality of (e.g., four) concave portions 114 each configured to define an outer shape of a body portion of the preforms. The first injection mold 110 is connected to an injection device 102 that injects a resin material (e.g., polyester such as polyethylene terephthalate, polycarbonate and the like), which is a raw material for the preforms 10. The plurality of concave portions 114 of the injection cavity mold 112 are linearly aligned along the arrangement direction C orthogonal to an injection direction B of the injection device 102. Also, the arrangement direction C intersects (orthogonally) the conveying path A. Further, the injection device 102 is connected to the center portion of the first injection mold 110 as viewed in the arrangement direction C. A coolant is supplied to the first injection mold 110 and the second injection mold 120a (120b) of the injection molding station 100. A temperature of the coolant is set to 5 to 20° C., for example.
Here, the second injection molds 120a, 120b will be described with reference to
Returning to
In other words, the injection molding station 100 includes an injection unit disposed at the injection position P1 and a post-cooling unit disposed at the post-cooling position P2. The injection unit is configured to inject a molten resin into the cavities to mold preforms 10. The post-cooling unit is configured to cool the preforms 10 released from the cavities after molded in the injection unit.
Next, the transfer member 500 included in the changing unit 150 will be described with reference to
In
Further, each of the holding members 510a, 510b is configured to be intermittently rotated by 90° about a third central axis X3 (i.e., rotated about its own axis) by respective two second holding member switching mechanisms (e.g., electric motors 540a, 540b) included in the transfer member 500. The third central axis X3 extends through a connection portion on the respective end portions 520a, 520b of the second rotary member 520. When disposed at the receiving position P3, the holding members 510a, 510b are disposed in a direction allowing to receive the preforms 10 arranged along the arrangement direction C. When disposed at the conveying position P4, the holding members 510a, 510b are disposed in an orientation causing the preforms 10 to be aligned along a direction along which the conveying position A extends. In other words, while moving the holding members 510a, 510b, the respective second holding member switching mechanisms are configured to rotate the respective holding members 510a, 510b about their own axis to change an orientation of the plurality of preforms 10 aligned in the arrangement direction C to an orientation aligned along the conveying path A. That is, the holding members 510a, 510b are configured to rotate about their own axis when moving from the receiving position P3 to the conveying position P4 so as to change the orientation of the preforms 10 aligned in the arrangement direction C to the orientation aligned in the direction along which the conveying path A extends, and then configured to transfer the preforms 10 to the temperature adjustment station 200.
Herein, while the preforms 10 are changed in orientation by the transfer member 500 and thus moved from the injection molding station 100 to the temperature adjustment station 200, the preforms 10 is allowed to be cool in the air. That is, the manufacturing device 1 includes a cooling unit between the injection molding station 100 and the temperature adjustment station 200, and the changing unit 150 is provided in the cooling unit.
Next, the temperature adjustment station 200 will be described with reference to
Next, the blow molding station 300 will be described. In this example, the blow molding station 300 includes a primary blow unit 310 and a final blow unit 320, thereby allowing the container 20 to be blow-molded in two steps. The primary blow unit 310 includes a primary blow mold constituted by, for example, a stretching rod, a blow core mold and a blow cavity mold. For example, the primary blow unit 310 is configured to introduce air into the preform 10 while stretching the preform 10 with the stretching rod, thereby allowing an intermediate molded product 15 to be molded. The final blow unit 320 includes a final blow mold constituted by, for example, a blow core mold and a blow cavity mold, and also includes a stretching rod as necessary. For example, the final blow unit 320 is configured to stretch the intermediate molded product 15 with air, thereby allowing a container 20 to be molded. The final blow unit 320 is configured to blow-mold the container 20 by introducing and circulating cooled air therethrough. Also, the blow molding station 300 includes a handle introduction mechanism 330 for introducing a handle 18 to be attached to the container 20 during final blowing. On the other hand, in order to perform a heat treatment on the intermediate molded product, the blow cavity mold of the primary blow unit 310 may be set to a temperature (e.g., 110 to 140° C.) higher than a temperature (e.g., 60 to 90° C.) of the blow cavity mold of the final blow unit 320.
Next, the method for manufacturing a container 20 using the manufacturing device 1 will be described.
The injection molding step S1 includes an injection step S1-1 and a post-cooling step S1-2. In the injection step S1-1, the injection device 102 injects a molten resin into an injection cavity defined by clamping the injection cavity mold 112, the injection core mold 122a (122b) and the injection neck mold 124a (124b), thereby molding the preforms 10. After a predetermined period of time has elapsed after injection, the preforms 10 are separated (released) from the injection cavity mold 112, and then the preforms 10 held by the injection core mold 122a (122b) and the injection neck mold 124a (124b) are moved from the injection position P1 to the post-cooling position P2 by rotating the first rotary member 130 by 180°.
Subsequently, in the post-cooling step S1-2, the preforms 10 which have been moved to the post-cooling position P2 while held by the injection core mold 122a (122b) and the injection neck mold 124a (124b) are cooled for a predetermined period of time. Cooling of the preforms 10 is performed from the inside thereof by the injection core mold 122a (122b) and the injection neck mold 124a (124b), in which a coolant, such as water, flows. After the preforms 10 have been moved to the post-cooling position P2, the cooling pod 140 is moved up to allow the preforms to be received in the cooling pod 140. Cooling of the preform 10 is also performed from the outside thereof by the cooling pod 140. Even while the preforms 10 are moved from the injection position P1 to the post-cooling position P2, the preforms 10 are cooled from the inside through the injection core mold 122a (122b). Therefore, such a movement time can also be regarded as a part of an initial stage of the post-cooling step S1-2.
Further, while the post-cooling step S1-2 of cooling the preforms 10 held by the injection core mold 122a (122b) and the injection neck mold 124a (124b) is performed at the post-cooling position P2, next injection step S1-1 is performed by another injection core mold 122b (122a) and injection neck mold 124b (124a) that are disposed at the injection position P1. That is, the next injection step S1-1 and post-cooling step S1-2 are simultaneously performed. After a predetermined period of time, the preforms 10 are separated from the injection core mold 122a (122b) and the injection neck mold 124a (124b) and thus kept received in the cooling pod 140. Subsequently, the cooling pod 140 is moved down to a height at which the transfer member 500 can receive the preform 10. Then, the first rotary member 130 is rotated again to perform the next injection step S1-1 and post-cooling step S1-2. By repeating this process, the injection molding step S1 is continuously performed.
In the subsequent changing step S1.5, the preforms 10 received in the cooling pod 140 and thus aligned in the arrangement direction C are held by the holding member 510a (510b) that is included in the transfer member 500 and that is disposed at the receiving position P3. Then, the cooling pod 140 is further moved down to allow the preforms 10 to be rotated by the second rotary member 520. Then, the preforms 10 are moved from the receiving position P3 to the conveying position P4 by rotating the second rotary member 520. Also, during this time, the holding member 510a (510b) is rotated about its own axis, so that the preforms 10 are arranged along a direction along which the conveying path A extends. Then, the preforms 10 are held by the conveying members 600a, 600b, and thus the preforms 10 are released from the holding member 510a (510b). Subsequently, at least one preform 10 is intermittently delivered from the changing unit 150 to the conveying path A while held by the conveying members 600a, 600b. Moreover, during the changing step S1.5, the preforms 10 are allowed to be cool in the air. Therefore, a process for equalizing a temperature of the preforms 10 is performed until the preforms 10 are transferred to the temperature adjustment station 200.
Further, while the preforms 10 are being delivered by the conveying members 600a, 600b, preforms 10 molded by next injection molding step S1 are held by the holding member 510b (510a). After delivering the preforms 10 from the conveying position P4 to the conveying path A has been completed, the preforms 10 molded in the next injection molding step S1 are moved from the receiving position P3 to the conveying position P4 by rotating the second rotary member 520. By repeating this process, the changing step S1.5 is continuously performed.
After the preforms 10 are transferred to the conveying path A, the preforms 10 are conveyed to the temperature adjustment station 200 by the conveying members 600a, 600b, and then the temperature adjustment step S2 is performed there. In the temperature adjustment step S2, the preforms 10 are sequentially conveyed to the normal temperature adjustment unit 210 and then the local temperature adjustment unit 220, so that the temperature of the preforms 10 is adjusted to a temperature suitable for the subsequent blow molding step S3. That is, the temperature adjustment step S2 includes a normal temperature adjustment step and a local temperature adjustment step. The local temperature adjustment step is performed just before blow molding. Also, in the temperature adjustment step S2, the preforms 10 are conveyed from the normal temperature adjustment unit 210 to the local temperature adjustment unit 220 by the conveying member 600c. At this time, a pitch between the preforms is changed from a narrow pitch during injection molding to a wide pitch during blow molding.
After the temperature adjustment step S2, the preforms 10 are conveyed to the blow molding station 300 by the conveying member 600d, and then the blow molding step S3 is performed there. In the blow molding step S3, the preforms 10 are blow-molded into an intermediate molded product 15 by the primary blow unit 310 (primary blowing step), and the intermediate molded product 15 is blow-molded into a container 20 by the final blow unit 320 (final blowing step). In the final blow unit 320, cooled air is introduced into the container 20 after the container 20 is blow-molded. By using the cooled air in the final blow unit 320, the container 20 can be rapidly cooled and thus the blow molding step S3 can be shortened. In this way, shortening of the cycle time can be achieved. Further, in the final blow unit 320, a handle 18 is introduced into the final blow mold by the handle introduction mechanism 330, and the handle 18 is attached to the container 20.
After the blow molding step S3, the container 20 is conveyed to the take-out station 400 by the conveying member 600d, and then the container 20 is taken out (take-out step S4). On the other hand, the conveying member 600d simultaneously holds the temperature adjusted preform 10, the intermediate molded article 15 and the container 20, and conveys the same to the downstream step. Specifically, the conveying member 600d conveys the intermediate molded product 15 from the primary blow unit 310 to the final blow unit 320 while conveying the preform 10 from the temperature adjustment station 200 to the primary blow unit 310. Through this process, the container 20 can be obtained.
However, in a hot parison type blow molding, it takes time to cool an injection-molded preform. This is a factor that lengthens the entire molding cycle. In particular, in a hot parison type blow molding device that uses a rotary table, the number of articles to be injection-molded and the number of articles to be blow-molded are the same. As a result, since an injection molding station becomes a rate-determining step, it is impossible to shorten the cycle of molding. Also, a space required to dispose an injection neck mold can be ensured only within a size smaller than a radius of the rotary table. If only a size which can be received into a transport container is allowed, the size is also limited and thus an amount of production cannot be increased. Further, in order to perform stretch-blowing, it is necessary to optimize a temperature of the preform. Therefore, it is necessary not to simply cool the preform, but to optimize a temperature of the preform in a short time.
According to the manufacturing method for the container 20 as described above, while the injection step S1-1 for next preforms 10 is performed, the preforms 10 and the containers 20 can be conveyed through the temperature adjustment step S2 and the blow molding step S3 along the conveying direction (conveying path A) intersecting the arrangement direction C along which the preforms are arranged during an injection molding step S1. Therefore, it is possible to simplify a conveying mechanism, to shorten a time required for conveying, and to adjust a temperature of the preforms such an extent that no influence on the cycle of molding occurs. In addition, the changing step S1.5, in which the orientation of the preforms 10 aligned in the arrangement direction C are changed to an orientation aligned along the conveying direction (conveying path A), is performed between the injection molding step S1 and the temperature adjustment step S2. Therefore, it is possible to smoothly transfer the preforms 10 to the temperature adjustment step S2 and the blow molding step S3. In this way, it is possible to maintain or improve a quality of the containers 20 even under a short cycle time while enhancing an amount of production of the containers 20 per unit time. Further, during the changing step S1.5, moving of the preforms 10 and changing of orientation thereof can be simultaneously performed, thereby making it possible to deliver the preforms 10 efficiently while saving space.
Further, in the injection molding step S1 as described above, the preforms are injection-molded along the arrangement direction C intersecting the conveying direction (conveying path A) during the temperature adjustment step S2 and the blow molding step S3. In this way, an injection port of the injection device can be disposed at the center portion in a longitudinal direction of the cavity mold that is used in the injection molding step S1, so that the injection device itself can be disposed in a transverse direction of the cavity mold (i.e., an orientation along the conveying direction). Therefore, it is possible to reduce an occupied space required to manufacture the containers 20 relative to an amount of production thereof per unit time.
Also, according to the manufacturing method for the container 20 as described above, the injection molding step S1 includes the injection step S1-1 and the post-cooling step S1-2. Therefore, the preforms 10 can be released from the cavities in a relatively high temperature state in the injection step S1-1, and the preforms 10 can be continued to be cooled in the post-cooling step S1-2. Also, while the preforms 10 are continued to be cooled in the post-cooling step S1-2, an injection step S1-1 for next preforms 10 can be performed, thereby allowing the injection molding step S1 to be repeated in a short time. In this way, it is possible to maintain or improve a quality of the containers 20 even under a short cycle time while enhancing an amount of production of the containers 20 per unit time. Specifically, when a plurality of second injection molds 120a, 120b are in a stationary state, at least one of the plurality of second injection molds 120a, 120b is disposed at the injection position P1 at which the first injection mold 110 is disposed, and at least one of the plurality of second injection molds 120a, 120b is disposed at the post-cooling position P2 which is opposite to the injection position P1 with respect to the first central axis X1. Therefore, after the preforms 10 are molded at the injection position P1 of the injection molding station 100 (on the upstream side thereof), the preforms 10 are released from the injection cavity mold 112 of the first injection mold 110 in a state where cooling of the preforms 10 is not fully completed. Then, the preforms 10 held by the second injection molds 120a, 120b are revolved and moved to the post-cooling position P2 in the injection molding station 100 (to the downstream side thereof), and cooling of the preforms 10 is continued there. Also, while the preforms 10 are continued to be cooled at the post-cooling position P2, the next preforms 10 can be injection-molded, thereby allowing the injection molding to be repeated in a short time.
Also, in the changing step S1.5 as described above, the preforms 10 are allowed to be cooled in the air, thereby making it possible to further shorten a cooling time in the injection molding step S1. Therefore, the injection molding step S1 can be repeated in a short time, so that an amount of production of the containers 20 per unit time can be increased. In addition, unevenness in temperature of the preforms 10 can also be resolved in front of the temperature adjustment station 200 (i.e., the temperature thereof can be equalized), thereby allowing higher quality containers 20 to be manufactured.
Further, since the temperature adjustment step S2 includes the local temperature adjustment step, it is easy to blow-mold the containers 20 into a desired shape. Further, it is easy to blow-mold a special-shaped container, such as a large container including a handle. Further, by performing the local temperature adjustment step just before the blow molding step, the preforms can be blow-molded immediately after a temperature distribution optimized for blow molding is obtained therein.
Also, in the blow molding step S3, the preforms 20 are blow-molded in two steps through the primary blowing step and the secondary blowing step. That is, after intermediate molded products are first molded, containers are molded therefrom, thereby improving a thickness distribution in the containers finally obtained. In particular, when molding a special bottle (e.g., a large-sized bottle, such as a 5-gallon bottle made of PET material), a quality of the container can be maintained or improved. In addition, for the 5-gallon bottle, it is common to attach a handle to the container. By blowing the container in two stages, it is possible to select conditions suitable for attaching the handle, thereby improving the attaching strength. In addition, an improvement in heat resistance can also be expected.
As described above, according to the manufacturing device 1 and the manufacturing method of the present disclosure, it is possible to maintain or improve a quality of resin containers even under a short cycle time while enhancing an amount of production of the containers per unit time. Also, in a case of especially large-sized (e.g., 5-gallon) containers 20, it takes time to cool preforms 10. According to the manufacturing device 1 and the manufacturing method of the present disclosure, favorable effects can be obtained in manufacturing especially large-sized containers 20.
Also, the manufacturing device 1 of the foregoing embodiment includes temperature adjustment (heating or cooling) parts including the second injection mold 120a, 120b at the post-cooling position P2, the transfer member 500, the normal temperature adjustment unit 210 and the local temperature adjustment unit 420. Since a number of temperature adjustment parts is provided, the temperature distribution in the preforms 10 can be adjusted at a temperature suitable for blow molding even if the cycle time is short, thereby maintaining or improving the quality of the containers 20.
Further, in the manufacturing device 1 of the foregoing embodiment, the blow molding station 300 includes one or more final blow molds, and the number of preforms 10 and containers 20 corresponding to the number of final blow molds are intermittently conveyed through the conveying path A. According to the manufacturing device 1 having the above configuration, the preforms 10 and the containers 20 as many as the number which can be conveyed at a time are conveyed to the final blow molds 320, thereby taking a balance between a temperature adjustment time and a waiting time even while optimally setting the temperature distribution in the preforms 10. Therefore, it is possible to realize a further reduced cycle time and also to maintain or improve the quality of the containers 20.
On the other hand, in the present disclosure, conveying linearly does not mean only a case where the conveying path is strictly drawn by one straight line. Even a case where the conveyance is performed by a plurality of conveying paths inclined at slightly different angles, the effect of direction alignment by the transmission member can be obtained. In addition, according to the present disclosure, even if an orientation of a plurality of arranged preforms along a direction inclined by 30° to 150°, for example, with respect to the conveying path extending in a substantially straight line shape in the temperature adjustment station and the blow molding station is aligned by the transfer member, the effect of the present disclosure can be obtained. In addition, the term “orthogonal” does not mean only an angle of exactly 90° angle, but includes, for example, an angle of about 90°±5°.
Here, another aspect of the transfer member 500 described in the foregoing embodiment will be described with reference to
The transfer member 500Z includes holding members 510Za, 510Zb configured to hold preforms, a second rotary member 520Z (moving mechanism) having a generally circular disk shape and configured to be rotated about the second central axis X2 by, for example, an electric motor (not shown), and two holding member switching mechanisms (e.g., electric motors, not shown in
Each of the holding members 510Za, 510Zb includes a plurality of holding portions 512Z (e.g., claws and hands) configured to grip and hold a neck portion of the preforms. The holding members 510Za, 510Zb are supported by the second rotary member 520 at positions revolved by 180° from each other about the second central axis X2 on the second rotary member 520. The second rotary member 520 is configured to intermittently rotate by 180° per one cycle of transferring, thereby changing the positions of the holding members 510a, 510b with each other.
Here, the operation of the transfer member 500Z will be described. In the initial state shown in part (a) of
Then, the transfer member 500Z transitions to the primary state shown in part (b)
Subsequently, the holding member 510Za and the holding member 510Zb change in position with each other by operation reverse to the above operation proceeding from the tertiary state to the secondary state and then to the primary state. That is, the second rotary member 520Z rotates counterclockwise, the holding member 510Za rotates clockwise about its own axis, and the holding member 510Zb rotates counterclockwise about its own axis. In this way, the transfer member 500Z returns to the initial state. The operation as described above is repeated so that the holding member 510Za and the holding member 510Zb change in position with each other and preforms are transferred from the injection molding station to the temperature adjustment station. In addition, although an aspect, in which the second rotary member 520Z rotates by switching between clockwise and counterclockwise directions for each rotation of 180°, has been described above, an aspect, in which the rotation direction is fixed to the clockwise or counterclockwise direction and intermittent rotation of 180° is performed, may be conceived.
Here, one preform positioned at one end of a plurality of preforms along the arrangement direction C in the injection molding station is defined as a first preform 10a1, and one preform positioned at the other end is defined as a N1th preform 10aN1 (see
In the transfer member 500Z as described above, when the holding members 510Za, 510Zb are moved from the receiving position P3 to the conveying position P4, the holding members 510Za, 510Zb rotate counterclockwise about their own axis to change an arranged orientation of the respective holding portions 512Z from the arrangement direction C to the conveying direction. When the holding members 510a, 510b are moved from the receiving position P3 to the conveying position P4, directions in which they are revolved and moved are different, but directions in which they rotate about their own axis are the same. That is, the transfer member 500Z is configured to cause an orientation of a plurality of preforms 10 aligned in the arrangement direction C to an orientation aligned along the conveying direction, in such a way that the first preform 10a1 (or the Nth preform 10aN1) is always at the forefront. Since the transfer member 500Z is provided, the preforms 10 can be conveyed to the temperature adjustment station 200 and the blow molding station 300 without changing the order of the preforms 10 when molded in the injection molding station. In this way, the preforms can always be conveyed to the next step in order from the first preform 10a1 to the Nth preform 10aN1. Therefore, it is possible to maintain or improve the quality of the containers 20 without being influenced by a variation in temperature state between the first preform 10a1 and the Nth preform 10aN1. On the other hand, the rotation direction of the holding members 510Za, 510Zb when moved from the receiving position P3 to the conveying position P4 is not limited to the counterclockwise direction, but the holding members 510Za, 510Zb may rotate clockwise about their own axis in accordance with aspects of conveyance.
Also, although, in the foregoing embodiment, the blow molding station includes the final blow molding station configured to blow-mold one container, the present disclosure is not limited thereto. The blow molding station may include a final blow molding unit configured to blow-mold N2 (N2 is an integer of 1 or more) containers per one time. Further, although an aspect in which the conveying mechanism intermittently conveys one preform and container has been described, the present disclosure is not limited thereto. The conveying mechanism may be configured to convey a plurality of preforms and containers by one intermittent conveyance, or the number of articles to be conveyed by one intermittent conveyance may be changed in the temperature adjustment station or the blow molding station.
Further, if the blow molding station includes a final blow unit configured to blow-mold N2 (N2 is an integer of 1 or more, preferably 2 or more) containers per one time, the manufacturing device 1 may be configured such that N2 preforms and containers are intermittently conveyed in the blow molding station. At this time, if one preform positioned at one end of a plurality of preforms along the arrangement direction in the injection molding station is defined as the first preform and one preform positioned at the other end is defined as the N1th (N1 is an integer of 2 or more) preform, N1 and N2 have a relationship of N1>N2. That is, in the manufacturing method for a resin container according to the foregoing embodiment, the number of blow-molded containers (N2) per one time is smaller than the number (N1) of injection-molded preforms per one time. For example, the numbers of preforms and containers to be molded may be set such that a ratio of the number of containers to the number of preforms is 1 to 4, 2 to 4, or 2 to 6. N1 and N2 are changed by conveying the preforms and the containers through the temperature adjustment station and the blow molding station along the conveying direction intersecting the arrangement direction of the preforms in the injection molding station. Since the number of containers to be molded in the blow molding step is small, the number of blow molding molds is reduced and thus space saving of the manufacturing device can be realized. Further, if the container 20 is not required to have heat resistance (e.g., a container for a bag in box), it is not necessary to perform double blow molding. Therefore, the primary blow unit 310 may be eliminated, and also the final blow unit 320 may be provided instead of the primary blow unit 310. That is, the manufacturing device 1 can easily change the configuration of the blow molding station 300 and can perform double blow molding or one blow molding depending on specifications of the containers 20. Since the manufacturing device 1 can perform a multi-stage temperature adjustment process which includes post-cooling, air cooling, normal temperature adjustment and local temperature adjustment, the manufacturing device 1 can appropriately cope with the temperature adjustment of the preforms.
Meanwhile, the present invention is not limited to the foregoing embodiments, and thus appropriate changes, modifications and the like may be freely made thereto. In addition, the material, shape, dimension, numerical value, form, number, arrangement location and the like of each component of the foregoing embodiments are arbitrary and not limited, as long as the present invention can be achieved.
This application is based on Japanese Patent Application No. 2018-158912 filed on Aug. 28, 2018, the entire contents of which are incorporated herein by reference. Also, all references cited herein are incorporated in their entirety.
Number | Date | Country | Kind |
---|---|---|---|
2018-158912 | Aug 2018 | JP | national |
Filing Document | Filing Date | Country | Kind |
---|---|---|---|
PCT/JP2019/033558 | 8/27/2019 | WO | 00 |