Claims
- 1. A method for manufacturing a welded clad steel tube comprising the steps of:
- cladding by welding an alloy including at least one of a corrosion-resisting and heat-resisting alloy on a raw steel tube to manufacture a clad steel tube;
- subjecting said clad steel tube to at least one of cold and warm working to said clad steel tube; and
- recrystallizing said alloy of said clad steel tube by subjecting said alloy to recrystallization conditions for said alloy which includes heat treating at a temperature of 1,100.degree. C.-1,150.degree. C. whereby said temperature exceeds the recrystallization temperature of said alloy.
- 2. A method for manufacturing a welded clad steel tube according to claim 1, wherein said alloy is a Ni--Cr--Mo alloy.
- 3. A method for manufacturing a welded clad steel tube according to claim 2, wherein said alloy includes Ni, C.ltoreq.0.1 wt %, Si.ltoreq.3.0 wt %, Mn.ltoreq.3.0 wt %, Cr: 15.0 to 35.0 wt %, Mo: 1.0 to 20.0 wt % with both Cr and Mo amounting to 20.0 to 50.0 wt %.
- 4. A method for manufacturing a welded clad steel tube according to claim 3, wherein said alloy includes C.ltoreq.0.05 wt %.
- 5. A method for manufacturing a welded clad steel tube according to claim 3, wherein said alloy includes at least one element selected from the group consisting of W.ltoreq.4.0 wt %, Nb.ltoreq.4.0 wt %, Ta.ltoreq.4.0 wt %, V.ltoreq.4.0 wt %, Ti.ltoreq.2.0 wt %, Zr.ltoreq.1.0 wt %, Al.ltoreq.1.0 wt %, Co.ltoreq.3.0 wt %, Cu.ltoreq.2.0 wt %, B.ltoreq.0.005 wt %, Mg.ltoreq.0.1 wt %, Ca.ltoreq.0.1 wt %, Y or a rare earth element.ltoreq.0.1 wt %, and N.ltoreq.0.1 wt %.
- 6. A method for manufacturing a welded clad steel tube according to claim 5, wherein said alloy includes S.ltoreq.0.02 wt %, P.ltoreq.0.02 wt %, and O.ltoreq.0.05 wt %.
- 7. A method for manufacturing a welded clad steel tube according to claim 1, wherein said at least one of cold and warm working is performed at a temperature less than 400.degree. C.
- 8. A method for manufacturing a welded clad steel tube according to claim 1, which further comprises recrystallizing said raw steel of said clad steel tube by subjecting said raw steel to recrystallization conditions for said raw steel which includes heat treating at a temperature which exceeds the recrystallization temperature of said raw steel.
Priority Claims (1)
Number |
Date |
Country |
Kind |
6-260976 |
Oct 1994 |
JPX |
|
Parent Case Info
This application is a continuation of application Ser. No. 08/538,359, filed Oct. 3, 1995 now abandoned.
US Referenced Citations (3)
Number |
Name |
Date |
Kind |
3355265 |
Hudson et al. |
Nov 1967 |
|
3795971 |
Chivinsky |
Mar 1974 |
|
4464209 |
Taira et al. |
Aug 1984 |
|
Foreign Referenced Citations (1)
Number |
Date |
Country |
60-190526 |
Sep 1985 |
JPX |
Continuations (1)
|
Number |
Date |
Country |
Parent |
538359 |
Oct 1995 |
|