This application claims priority under 35 U.S.C. ยง119 to European Patent Application No. 11180459.7 filed in Europe on Sep. 7, 2011, the entire content of which is hereby incorporated by reference in its entirety.
The present disclosure relates to a method for operating a power plant, for example, for operating combined power plants.
Power plants, such as combined power plants (for example, power plants including gas and steam turbines) can produce the base electric power that is supplied to an electric power grid.
With deregulation of the energy market, increased fuel prices and diffusion of renewable energies, combined power plants are more and more used to comply with peak power requests.
In order to comply with peak power requests, combined power plants can be asked to adapt their operation (in particular the power supplied to the grid) very fast, and should be able to operate with great flexibility. For example, when the energy required by the grid is low they should be able to reduce the power supplied to the grid up to zero and when the grid requires power again they should be able to provide it quickly. In some cases to provide tens of megawatt in seconds.
EP 2 056 421 discloses a method to connect a combined power plant with a gas turbine and a steam turbine to a grid. This method includes a first step where the gas turbine has full speed but does not supply any power to the grid. In addition the breaker is open. During this step the steam turbine loads up. In a second step the breaker is closed. During this step the steam turbine further loads up. In a third step the power plant energises the grid. Also during this step the steam turbine loads up. In a fourth step the power plant supplies power to the grid. During this step the steam turbine further loads up.
It is thus apparent that during the first through fourth steps the steam turbine does not supply any power to the grid. The steam turbine is in a transient, loading up operation. For this reason the method above could have some drawbacks.
When the steam turbine is in transient operation, it is not able to supply any power to the grid. The power plant cannot be able to satisfy a sudden power request from the grid. For example, in some cases sudden power requests from the grid can be as large as 50 MW/s or more.
A method is disclosed for operating a power plant, including a gas turbine and a steam power generation system that drive at least one electric generator, the method comprising: supplying flue gases produced by the gas turbine into a boiler of the steam power generation system; generating, by the gas turbine in a steady operation, a first output power greater or less than zero; and generating, by the steam power generation system, a second output power greater than zero, wherein a total generated power is a sum of the first and second output powers, and is substantially equal to a house load of the power plant.
A method is disclosed for starting up a power plant including a gas turbine and a steam power generation system that drive at least one electric generator, wherein the gas turbine produces flue gases that are supplied into a boiler of the steam power generation system, the method comprising: starting up and loading up the gas turbine to generate a first output power greater than zero and substantially equal to a house load; starting up and loading up the steam power generation system to generate a second output power greater than zero; while the steam power generation system is loaded up, decreasing the first output power, a total generated power being a sum of the first and second output powers, and being substantially equal to a house load of the power plant; and then maintaining the power plant in a steady state operation with the total generated power being substantially equal to a house load of the power plant.
A method is disclosed for reducing the power of power plant including a gas turbine and a steam power generation system that drive at least one electric generator, wherein the gas turbine produces flue gases that are supplied into a boiler of the steam power generation system, wherein steam is generated that is then expanded in a turbine of the steam power generation system, the turbine having a stator and a rotor, the method comprising: decreasing a first output power of the gas turbine; then decreasing a second output power of the steam power generation system; further decreasing the first output power of the gas turbine such that a total generated power as a sum of the first and second output powers is substantially equal to a house load of the power plant; and then maintaining the power plant in a steady state operation with the total generated power substantially equal to a house load of the power plant.
Further characteristics and advantages of the disclosure will be more apparent from the description of an exemplary embodiment of the disclosure, illustrated by way of non-limiting example in the accompanying drawings, in which:
Exemplary embodiments of the disclosure provide a method by which a combined power plant is able to comply with large, sudden power requests from the grid.
The method can be implemented in a power plant schematically described in
The power plant 1 includes a gas turbine 2 having a compressor 3, a combustion chamber 4 and a turbine 5. The combustion chamber 4 is fed with fuel 6 and oxidiser 7 (for example, air compressed in the compressor 3). Fuel 6 and oxidiser 7 are combusted to generate hot gases that are expanded in the turbine 5 to gather mechanical power.
The turbine 5 discharges exhaust flue gases 8 are then supplied to a steam power generation system 10. The steam power generation system 10 has a boiler 11 (also called Heat Recovery Steam Generator HRSG) that receives the flue gases 8 from the gas turbine 2 and produces steam that is expanded in a steam turbine 12. A condenser 13 and a pump 14 are also provided.
The gas turbine 2 and steam power generation system 10 activate, or drive, an electric generator 20 connected to an electric grid 21 via line 22.
In the power plant of
Other different power plant arrangements are possible.
An exemplary method for operating a power plant according to an exemplary embodiment disclosed herein is described with reference to
According to an exemplary method, in a steady (e.g., steady state) operation of the power plant 1, the gas turbine 2 generates a first output power 30 greater than zero, the steam power generation system 10 generates a second output power 31 greater than zero, and the total generated power 32 (the total generated power 32 being the sum of the first and second output power 30, 31) is substantially equal to a house load 33 of the power plant 1.
The house load 33 corresponds to that power that is to be provided to, or produced by, the power plant 1 to supply auxiliaries, and for internal use. Thus, when operating at the house load 33, the power plant produces power for its internal use but it is not able to substantially supply any power to the grid 21. In this respect, reference 32 indicates that the power supplied to the grid is zero.
During this operation at steady state the electric generator 20 is connected to the grid 21 (e.g., the breaker is closed). Therefore the generator 20 energises the grid 21 but does not provide any power to it. Alternatively, the electric generator 20 need not be connected to the grid 21 (e.g., the breaker is open).
In the exemplary embodiment of the disclosure shown in
In the exemplary embodiment of the disclosure according to
In this respect
When operating under these conditions, the power plant 1 can be ready to provide large power to the grid 21 in a very short time periods, because both the gas turbine 2 and the steam power generation system 10 are already in working conditions (either connected to the grid 21 or not). In addition these conditions can be maintained for long periods, such that the power plant 1 can be continuously connected to the grid without providing any power to the grid, to only provide power to the grid when requested. The power plant 1 can thus operate to comply with peak power requests for example together with renewable power plants.
The steady (e.g., steady state) operation described above can be reached from a switched off condition (thus the power plant is started up) or from a normal operation during which the power plant supplies electric power to the grid 21 (thus the power plant is unloaded).
The start-up is described with reference to
In order to start up the power plant 1, the gas turbine 2 is started up and loaded up in a step 45 up to the house load 33 and is then maintained at the house load 33 (step 46).
In addition, during step 46, the steam power generation system 10 is started up (e.g., it is accelerated up to the synchronism speed) and is then loaded up in a step 47. In these conditions the steam power generation system 10 generates a second output power 31 greater than zero.
While the steam power generation system 10 is loaded up (i.e. during step 47) the output power 30 of the gas turbine 2 is decreased.
The total generated power 32 (being the sum of the first and second output power 30, 31) is substantially equal to the house load 33 of the power plant 1.
The plant 1 is then maintained in a steady (e.g., steady state) operation with the total generated power 32 substantially equal to the house load 33 (i.e. no power is supplied to the grid 21).
Advantageously, the electric generator 20 is connected to the grid 21. In this condition, because the power plant 1 only produces a power equal to the house load 33, the power plant 1 does not provide any power to the grid 21.
Within the boiler 11, steam is generated that is then expanded in the steam turbine 12. In addition the turbine 12 has a stator 12a and a rotor 12b. While the output power 30 of the gas turbine 2 is decreased during step 47, the gas turbine 2 is regulated to get a steam minimum temperature compatible with the rotor 12b. In other words, because the steam exchanges heat with the rotor 12b the steam temperature cannot be too different from the temperature of the same rotor 12b, because it can cause high stress. For this reason the temperature of the steam should be close to the temperature of the rotor 12b.
The reduction of output power to bring a power plant 1 from a condition in which it supplies power to the grid 21 to a condition in which it is connected to the grid 21 but does not supply any power to it is described with reference to
Starting from a steady (e.g., steady state) operation 54 with the power plant 1 that supplies power to the grid 21, the method includes a step 55 of decreasing the first output power 30 of the gas turbine 2. In an exemplary embodiment of the disclosure, the first output power is decreased up to achieve a minimum steam temperature compatible with the rotor 12b.
During this phase, the second output power 31 of steam power generation system 10 is also reduced due to the less heat provided by the gas turbine exhaust gases to the boiler 11 that causes less steam generation in the boiler 11.
Then, in a step 56, the second output power 31 of the steam power generation system 10 is decreased to a stable operation (while the first output power 30 of the gas turbine 2 is maintained substantially constant) and in a subsequent step 57 the first output power 30 of the gas turbine 2 is further decreased, such that the total generated power 32 (i.e., the sum of the first and second output power 30, 31) produced by the gas turbine 2 and steam power generation system 10 is substantially equal to the house load 33 of the power plant 1.
Thus the power plant can be maintained in a steady (e.g., steady state) operation (step 58), with the total generated power 32 substantially equal to a house load 33 of the power plant 1.
The power plant 1 of
In this case the gas turbine 2 (or each gas turbine 2 if more than one gas turbine is provided) and the steam power generation system 10 (or each steam power generation system 10 if more of them are provided) are connected to generators 20a, 20b that are connected to the grid 21. The power transfer from the steam power generation system 10 to the gas turbine 2 (when this is desired) can occur via the grid 21. For example, the steam power generation system 10 can provide power to the grid 21 and the gas turbine 2 can adsorb power from the grid 21 (its generator 20b works as a motor) such that the total generated power (that is supplied to the grid 21 and being the difference between the power supplied by the steam power generation system 10 and the power adsorbed by the gas turbine 2) is zero.
In addition or alternatively the power can be transferred directly between the generators 20a, 20b via the line 23.
Additionally, it is also possible to disconnect the power plant 1 from the grid 21.
The features described can be independently provided from one another or in any desired combination.
In practice materials and dimensions can be chosen at will according to specifications and/or requirements.
Thus, it will be appreciated by those skilled in the art that the present invention can be embodied in other specific forms without departing from the spirit or essential characteristics thereof. The presently disclosed embodiments are therefore considered in all respects to be illustrative and not restricted. The scope of the invention is indicated by the appended claims rather than the foregoing description and all changes that come within the meaning and range and equivalence thereof are intended to be embraced therein.
Reference Numbers
Number | Date | Country | Kind |
---|---|---|---|
11180459 | Sep 2011 | EP | regional |
Number | Name | Date | Kind |
---|---|---|---|
3552872 | Giras et al. | Jan 1971 | A |
3561216 | Moore, Jr. | Feb 1971 | A |
3564273 | Cockrell | Feb 1971 | A |
3588265 | Berry | Jun 1971 | A |
3703807 | Rice | Nov 1972 | A |
3757517 | Rigollot | Sep 1973 | A |
3762162 | Miura et al. | Oct 1973 | A |
3849662 | Blaskowski et al. | Nov 1974 | A |
3959635 | Tanco | May 1976 | A |
4103178 | Yannone et al. | Jul 1978 | A |
4258424 | Giras et al. | Mar 1981 | A |
4329592 | Wagner et al. | May 1982 | A |
4340820 | Meyer-Pittroff et al. | Jul 1982 | A |
4362013 | Kuribayashi | Dec 1982 | A |
4455614 | Martz et al. | Jun 1984 | A |
4566267 | Muller et al. | Jan 1986 | A |
4631915 | Frewer et al. | Dec 1986 | A |
4663931 | Schiffers et al. | May 1987 | A |
4665688 | Schiffers et al. | May 1987 | A |
4702081 | Vinko | Oct 1987 | A |
5431016 | Simpkin | Jul 1995 | A |
5473898 | Briesch | Dec 1995 | A |
5565017 | Kang et al. | Oct 1996 | A |
5613356 | Frutschi | Mar 1997 | A |
5666800 | Sorensen et al. | Sep 1997 | A |
5865023 | Sorensen et al. | Feb 1999 | A |
6244033 | Wylie | Jun 2001 | B1 |
6588212 | Wallace et al. | Jul 2003 | B1 |
6608395 | Steinway | Aug 2003 | B1 |
6644011 | Cheng | Nov 2003 | B2 |
6751959 | McClanahan et al. | Jun 2004 | B1 |
6766646 | Ford et al. | Jul 2004 | B1 |
6877322 | Fan | Apr 2005 | B2 |
6952926 | Blatter et al. | Oct 2005 | B2 |
7188478 | Bourgeois | Mar 2007 | B2 |
7543438 | Wojak | Jun 2009 | B2 |
8133298 | Lanyi et al. | Mar 2012 | B2 |
8505299 | Mundra et al. | Aug 2013 | B2 |
8557173 | Lanyi et al. | Oct 2013 | B2 |
8776521 | Tong et al. | Jul 2014 | B2 |
8899909 | Pandey et al. | Dec 2014 | B2 |
8955302 | Van Straaten et al. | Feb 2015 | B2 |
8959884 | Hoffmann et al. | Feb 2015 | B2 |
8984894 | Droux et al. | Mar 2015 | B2 |
9019108 | Chillar et al. | Apr 2015 | B2 |
20020189262 | Noelscher et al. | Dec 2002 | A1 |
20040123601 | Fan | Jul 2004 | A1 |
20060053792 | Bourgeois | Mar 2006 | A1 |
20060232071 | Althaus | Oct 2006 | A1 |
20070130952 | Copen | Jun 2007 | A1 |
20090019853 | Nilsson | Jan 2009 | A1 |
20090044534 | Carapellucci et al. | Feb 2009 | A1 |
20090077944 | Wojak | Mar 2009 | A1 |
20090112374 | Kirchhof et al. | Apr 2009 | A1 |
20090320493 | Olia et al. | Dec 2009 | A1 |
20100064855 | Lanyi et al. | Mar 2010 | A1 |
20100146982 | Lanyi et al. | Jun 2010 | A1 |
20110016876 | Cataldi et al. | Jan 2011 | A1 |
20110289898 | Hellat et al. | Dec 2011 | A1 |
20110289899 | De La Cruz Garcia et al. | Dec 2011 | A1 |
20110304159 | Juretzek | Dec 2011 | A1 |
20120032378 | Lanyi et al. | Feb 2012 | A1 |
20130145772 | Schlesier et al. | Jun 2013 | A1 |
20140090356 | Nakamura et al. | Apr 2014 | A1 |
20140116063 | Deng et al. | May 2014 | A1 |
20140130476 | Nakamura et al. | May 2014 | A1 |
20140150447 | Ekanayake et al. | Jun 2014 | A1 |
20140208765 | Ekanayake et al. | Jul 2014 | A1 |
20140239638 | Schlesier et al. | Aug 2014 | A1 |
20140250901 | Olia et al. | Sep 2014 | A1 |
20140250911 | Huntington et al. | Sep 2014 | A1 |
20140250913 | Olia et al. | Sep 2014 | A1 |
20140290264 | Hovel | Oct 2014 | A1 |
20150000279 | Mohr et al. | Jan 2015 | A1 |
20150007575 | Drouvot et al. | Jan 2015 | A1 |
20150007577 | Li et al. | Jan 2015 | A1 |
20150047366 | Carroni et al. | Feb 2015 | A1 |
20150082803 | Droux et al. | Mar 2015 | A1 |
20150107257 | Van Straaten et al. | Apr 2015 | A1 |
Number | Date | Country |
---|---|---|
3016777 | May 1981 | DE |
102008062588 | Jun 2010 | DE |
1736638 | Dec 2006 | EP |
2056421 | May 2009 | EP |
54-001742 | Jan 1979 | JP |
55-64409 | May 1980 | JP |
60-249609 | Dec 1985 | JP |
61-65026 | Apr 1986 | JP |
03-284197 | Dec 1991 | JP |
2003-032898 | Jan 2003 | JP |
2004-080945 | Mar 2004 | JP |
2004-514817 | May 2004 | JP |
2005-036685 | Feb 2005 | JP |
2006-191748 | Jul 2006 | JP |
2395696 | Jul 2010 | RU |
378644 | Apr 1973 | SU |
454362 | Dec 1974 | SU |
787695 | Dec 1980 | SU |
1163681 | Dec 1985 | SU |
Entry |
---|
*European Search Report dated May 24, 2012 for European Application No. 11180459.7. |
Extended European Search Report dated May 31, 2013, issued by the European Patent Office in corresponding European Patent Application No. 12181719.1 (7 pgs.). |
Decision of Grant issued Jan. 13, 2015 by the Federal Service for Intellectual Property in corresponding Russian Patent Application No. 2012138139, and an English translation thereof. |
Notification of Reasons for Refusal issued Feb. 2, 2015 by the Japanese Patent Office in corresponding Japanese Patent Application No. 2012-196782, and an English translation thereof. |
Number | Date | Country | |
---|---|---|---|
20130082467 A1 | Apr 2013 | US |