The invention is framed in the technical sector of renewable energies, more concretely in the field related so solar photovoltaic energy. Within this field, it is framed within its operation and maintenance segment.
Over 90% of the current solar photovoltaic market is based on the so-called “crystalline” technology. These solar modules are composed of crystalline silicon solar cells, both multicrystalline and monocrystalline. They are connected to one another through an electrical connection, usually in series. Furthermore, within a solar power plant the modules are series-connected to one another in strings of up to a certain number of modules, which depend on the wished voltage and current. Each one of these strings is series- or parallel-connected to others, until the final, complete solar photovoltaic power plant is formed.
According to international reports, such as the one issued by the International Energy Agency, in 2017 there were over 300 Gigawatts peak (GWp) of cumulated installed solar photovoltaic power worldwide. 60% corresponds to big, ground-mounted power plants over one megawatt peak (MWp) in power.
The profitability of these solar plants is especially sensitive to failures in solar modules, as it is increasingly based on price competitiveness, and therefore on ever smaller margins. The main failures occurring in solar modules are well known for many years, both at cell and at module level. One of the last reports updating the potential solar module and cell failures is the one carried out by the International Energy Agency PhotoVoltaic Systems Programme (IEA-PVPS), entitled “Review of Failures of Photovoltaic Modules” and issued in March 2014. This report stated that approximately 2% of the total existing modules will fail after year 10-12 of operation and before the end of its lifetime. The main consequence of any of these failures is that, as several cells and several modules are series-connected, the failure in only one cell or only one module can “turn down” the whole series and cause a higher or lower loss in performance. These failures are generally of electric nature, and are owed to different causes, many of which can be detected by the higher increase in temperature at the affected areas by means of thermography techniques based on infrared emission (IR), or by the lower electrical conductivity of the affected areas, measured by electroluminescence emission (EL).
The preventive maintenance mostly carried out so far, however, has been rather addressed to avoid soiling (dirt accumulation), or to revising the electrical connections at the AC/DC inverter, conservation of cabling, etc., than to detect failures inside the modules or solar cells. The introduction of IR and EL techniques that allow for an early detection, and therefore a smart predictive maintenance, has only very recently started being popular with the raise of unmanned aerial vehicles or drones, which allow for a profitable inspection velocity. Until the introduction of drones, inspections were carried out on the ground and was intensive in consumption of time and resources, and therefore unable to be introduced into a standard maintenance plan. The raise of such techniques is accompanied by a raise in patent applications dedicated to photovoltaic power plant inspection methods, preferably with drones, both using IR (as in, for instance, patents KR20150022121 y KR20150022119), EL (patents CN104883128, CN204392177 y CN103595351), and both (patent US20150229269). Furthermore, their use for maintenance purposes has been for instance also introduced in the last recommendations in the report “Best Practices in Photovoltaic System Operation and Maintenance” by the National Renewable Energy Laboratory of the U.S. (NREL). Its second and up to now last edition is from December 2016. Even a specific standard on IR measuring in solar plants was approved as recently as June 2017: the first edition of international standard IEC Technical Specification (TS) 64426-3, entitled “Photovoltaic Systems—Requirements for Testing, Documentation and Maintenance—Part 3: Photovoltaic Modules and Power Plants—Outdoor Infrared Thermography”, recommends (does not require as compulsory) a thermographic inspection every four years maximum, or more frequent inspections under circumstances suggesting potential failures of risk of fire, such as in big rooftop photovoltaic plants. All these documents are setting the base for a smart predictive maintenance for the early detection of failures in modules, and we will see further improvements in the coming years.
The ultimate goal of this predictive maintenance is to detect those modules with failures in time. However, as of today, there is no clear method regarding what to do exactly with these modules, how to manage their substitution, repair, or whether it is simply better to let them be.
On the other hand, this whole development is not being exploited to its full potential, which is repowering of solar power plants. Today, when, in order to obtain higher performance, repowering of solar plants is considered, it mainly refers to the substitution of the totality of the old solar modules, of less power, by new, more powerful modules, taking advantage of the already existing infrastructure. This consideration is only made in case of complete plant failure, or, more commonly, at the end of its lifetime. Until the authors know, a more optimized repowering method has been proposed, much less involving the data obtained in plant maintenance.
The present invention proposes a method to carry out an optimized repowering continuously along a solar power plant's lifetime, by using the new, profitable methods of smart predictive and preventive maintenance, such that the knowledge and optimum management of those modules which fail is used to constantly reorganize the solar power plant, with the ultimate goal to generate the highest production of electricity at all times. And thus, to guarantee the highest profitability of the investment.
The present invention is a method to optimize the repowering of a solar photovoltaic power plant by using smart preventive and predictive maintenance based on failure detection by aerial both thermography (IR) and electroluminescence (EL).
Said optimized repowering method differs from the current standard repowering in several aspects:
In order to carry out a correct repowering optimization, it must be taken into account that not all types of module failures lead to the same consequence. Depending on the type of failure, this can be:
It must also be considered that, for an optimum solar plant operation, series-connected strings must have modules of very similar power (with power variation among them having a standard deviation of ±5%), and these strings, on their turn, must be parallel-connected to others of different power, preferably, if possible, even to a separate inverter.
The method of the present invention consists on the following steps:
In one possible, but non-exclusive embodiment, a 10 MWp, ground-mounted solar photovoltaic power plant is formed by 40.000 modules of 250 Wp each, distributed in 1,000 strings of 40 series-connected modules each.
Through an aerial thermography inspection that took place as part of the smart annual predictive and preventive maintenance, the following failed modules were detected:
With the repowering method, in this embodiment, the 400 type A modules are substituted for new generation modules, of 300 Wp each, and are grouped in 10 strings of 40 series-connected modules each.
The 240 type B modules are repaired, gain their original power back and are placed at the same places they occupied before the inspection.
The 160 type C modules are re-grouped and distributed into four strings, two with 40 modules each with new power of 125 Wp per module, and another two of with 40 modules each with new power of 200 Wp per module.
This way, the solar power plant keeps working at its optimum, and a repowering from 10 MWp (nominal power, though it would be less, as 800 modules were not working properly) to 10.006 MWp is achieved.
In another possible, but non-exclusive configuration, with the same number and type distribution of failed modules, those modules with failures of type A and B follow the same procedure, whereas the 160 modules with failures of type C are sold, and substituted in the plant by new ones of 300 Wp each, distributed in four strings (1) of 40 series-connected modules each. The achieved repowering reaches now 10,028 MWp.
Number | Date | Country | Kind |
---|---|---|---|
P201730710 | May 2017 | ES | national |
Filing Document | Filing Date | Country | Kind |
---|---|---|---|
PCT/ES2018/070362 | 5/17/2018 | WO | 00 |