Claims
- 1. In an open-end spinning machine having a plurality of spinning stations in which textile yarn bobbins are produced and wherein the winding status of the bobbins in current production can be determined, a method for optimizing efficiency in spinning a batch of bobbins, the method comprising:
- predetermining the spinning of the batch to terminate at a time at which full bobbins have been completed at no greater than approximately 75% of all operating spinning stations,
- predetermining a minimum winding condition to be attained by the bobbins,
- during the spinning of the batch, determining for the bobbins still being formed the time required for attaining the minimum winding condition, and
- stopping those spinning stations whose bobbins cannot attain the minimum winding condition by the time of the predetermined batch termination time.
- 2. The method in accordance with claim 1, wherein the predetermining step comprises predicting the subsequent times at which the respective spinning stations will progressively complete full spinning bobbins and selecting the termination time of the batch to enable substantially all bobbins to attain at least the minimum winding condition.
- 3. The method in accordance with claim 1, wherein the determining of the time required for attaining the minimum winding condition comprises determining the current winding condition of the bobbins and the predetermining of the termination time of the batch comprises determining a predetermined minimum number of full bobbins to be produced and determining an optimization the times required for completing the predetermined minimum number of full bobbins.
- 4. The method in accordance with claim 3, and further comprising, during the spinning running of the batch, determining the amount of yarn already spun, the amount of bobbins already wound and the number of bobbins which are currently in production, and determining the termination of the batch as a function thereof.
- 5. The method in accordance with claim 1, wherein the stopping step comprises, when a spinning station completes a full bobbin, restarting the spinning station if sufficient time remains to spin another bobbin to attain at least the minimum winding condition before the predetermined batch termination time or stopping the spinning station if insufficient time remains to spin another bobbin to attain at least the minimum winding condition before the predetermined batch termination time.
- 6. The method in accordance with claim 5, and further comprising preparing the spinning machine for spinning a second batch of bobbins after the predetermined batch termination time, including exchanging the bobbins of the first-mentioned batch with a supply of empty spinning tubes for the second batch.
- 7. The method in accordance with claim 6, wherein the exchanging of bobbins of the first-mentioned batch comprises equipping stopped spinning stations with tubes of the second batch.
- 8. The method in accordance with claim 7, the spinning of the first-mentioned batch comprises feeding slivers from sliver cans to the spinning stations, and the preparing the spinning machine for spinning a second batch comprises exchanging cans of sliver for the second batch for the cans of sliver from the first-mentioned batch at the stopped spinning stations.
Priority Claims (1)
Number |
Date |
Country |
Kind |
196 48 215 |
Nov 1996 |
DEX |
|
CROSS-REFERENCE TO RELATED APPLICATION
This is a continuation of co-pending U.S. patent application Ser. No. 08/970,954, filed Nov. 14, 1997, entitled METHOD FOR OPTIMIZING A BATCH CHANGE IN AN OPEN-END SPINNING MACHINE, now abandoned.
US Referenced Citations (5)
Continuations (1)
|
Number |
Date |
Country |
Parent |
970954 |
Nov 1997 |
|