Sridhar & Rajendran, Scheduling in flowshop and cellular manufacturing systems with multiple objectives—a genetic algorithms approach, Jul. 1996, pp. 374-382 Journal of Production Planning and Control, vol. 7, No. 4.* |
R. Suri and B.-R. Fu, “On Using Continuous Flow Lines for Performance Estimation of Discrete Production Lines,” Proc. 1991 Winter Simulation Conf., pp. 968-977, Dec. 1991.* |
L.J. Eshelman, “The CHC Adaptive Search Algorithm: How to Have Safe Search When Engaging in Nontraditional Genetic Recombination,” North American Philips Corp., 345 Scarborough Road, Briarcliff Manor, NY 10510, pp. 265-283, Dec. 1991.* |
C. Liu and F.-s. Tu, “Buffer Allocation via the Genetic Algorithm,” Proc. 33rd Conf. on Decision and Control, pp. 609-610, Dec. 1994.* |
R. Kumar and H. Li, “Integer Programming Approach to Printed Circuit Board Assembly Time Optimization,” IEEE Trans. on Components, Packaging, and Manufacturing Technology-Part B, vol. 18(4), pp. 720-727, Nov. 1995.* |
B. Porter, et al., “Machine Requirements Planning and Workload Assignment using Genetic Algorithms,” Proc. 1995 IEEE Int'l. Conf. on Evolutionary Computation, vol. 2, pp. 711-715, Dec. 1995.* |
I. Or and E. Duman, “Optimization Issues in Automated Production of Printed Circuit Boards: Operations Sequencing, Feeder Configuration and Load Balancing Problems,” Proc. 1996 IEEE Conf. on Emerging Technologies and Factory Automation, vol. 1, pp. 227-23, Nov. 1996. |