The invention relates to the field of nuclear engineering and can be used to organize the natural circulation of liquid metal coolant in the heat sink of a fast neutron nuclear reactor.
The closest to this invention is a method of organizing the natural circulation of liquid metal coolant in the heat sink of a fast neutron nuclear reactor, comprising the pre-heating of the lift and down flow pipes and equipment of the heat sink circuit with their subsequent filling with heated coolant, starting the circulation of the coolant in the circuit and switching to the natural circulation mode (G. B. Usynin, E. V. Kusmartsev Fast neutron reactors: Textbook for universities/Edited by F. M. Mitenkova—M: Energoatomizdat, 1985 p. 197).
The known method is as follows.
Pipelines and equipment for the lifting and downing sections of the heat sink circuit before the initial filling with liquid metal coolant (or after inspection and repair) have a temperature approximately equal to the ambient temperature. The liquid metal coolant located in the tank of the filling and drainage system is heated to a temperature of about 200-250° C. Therefore, before supplying the heated liquid metal coolant to the heat sink circuit, the pipelines and equipment must be heated to the same temperature to prevent overcooling (“hardening”) of the liquid metal coolant. For heating, electric heaters are used, which are installed on pipelines and equipment of the lifting and downing sections of the heat sink circuit. Then, the heated coolant is fed into the heat sink circuit until the required level in the tank for compensating thermal expansions is reached. After filling the lifting and downing sections of the circuit with the coolant, the forced circulation is started in the circuit using pumps. The transition to the natural circulation mode is made after the nuclear reactor reaches its rated operating parameters.
The disadvantage of this method is the presence of additional hydraulic resistance in the circuit due to the pumping equipment used when starting the circulation and in the forced circulation mode until the reactor reaches its rated power, as well as the inability to switch from the forced circulation mode to natural circulation without heat transfer from the nuclear reactor.
The objective of this invention is to provide a method for organizing the natural circulation of liquid metal coolant in the heat sink circuit of a fast neutron nuclear reactor, in which there is no forced circulation mode, and the heat sink circuit works, including when starting, only in the natural circulation mode and in the absence of heat transfer from the nuclear reactor, i.e. before power ascension, which ensures the passive safety of the nuclear reactor and the reactor unit as a whole.
The technical result of this invention is to initiate natural circulation by creating a driving pressure of circulation and providing the desired direction of natural circulation of the liquid metal coolant in the heat sink without transferring heat from the nuclear reactor. In addition, the technical result is a significant reduction in hydraulic resistance due to the lack of pumping equipment in the heat sink circuit.
The specified technical result is achieved by the fact that in the known method of organizing the natural circulation of a liquid metal coolant in the heat sink of the fast neutron nuclear reactor, which includes the preliminary electric heating of pipelines and equipment of the lifting and downing sections of the heat sink, followed by their filling with a heated coolant, starting the circulation of the coolant in the circuit and transition to the natural circulation mode, according to the claimed invention, pipelines and equipment of the lifting and downing sections of the heat sink circuit are pre-heated to temperatures T1 and T2, respectively, which are selected from the conditions of inequality:
ρ1(T1)·g·ΔH1>ρ2(T2)·g·ΔH2+ΔP,
where:
ρ1(T1) is the density of the liquid metal coolant at temperature T1 of pipelines and equipment in the lifting section;
ρ2(T2) is the density of the liquid metal coolant at temperature T2 of pipelines and equipment at the downing section;
ΔH1 is the height difference between the inlet and outlet of the lifting section;
ΔH2 is the height difference between the inlet and outlet of the downing section;
ΔP is the hydraulic resistance of the circuit
g is the acceleration of gravity,
and the circulation of the coolant in the circuit is launched simultaneously with the transition to the natural circulation mode and until the nuclear reactor reaches its nominal operating parameters due to the difference in densities ρ1(T1) and ρ2(T2) of the liquid metal coolant, respectively, in the lifting and downing sections of the circuit.
The claimed combination of essential features allows the natural circulation to start in the heat sink of the nuclear reactor without connecting to the main heat source, but only due to electric heating to the calculated temperature of the pipelines and equipment of the lifting and downing sections and, therefore, due to the temperature difference (density difference) of the coolant filling them. Therefore, at the time of the nuclear reactor starting, the heat sink circuit will already function in the natural circulation mode and thereby ensure the passive safety of the reactor unit as a whole. Compared to the prototype, there is no forced circulation mode in the claimed method, which also helps increase nuclear safety.
The essence of this invention is illustrated by drawings, where a diagram of a heat sink circuit of the fast neutron nuclear reactor is presented in the
The heat sink circuit contains heat source 1, which can be used as a heat exchanger that is connected to the first reactor circuit (not shown in the drawing) or a nuclear reactor (not shown in the drawing). The output of heat source 1 is connected by means of a lifting pipe 2 with the input of the device for removing heat 3, which is used as an air heat exchanger. Sectional electric heaters 4 are installed on the lifting pipe 2 along the entire length. The outlet of heat removal device 3 is connected by downing pipe 5 to heat source 1 through a tank to compensate thermal expansion of coolant 6. Sectional electric heaters 7, similar to electric heaters 4, are installed on downing pipe 5 along the entire length. The heat sink circuit is connected to the tank of filling and drainage system 8 by means of drainage pipe 9 with valve 10. Heat 100 source 1, heat removal device 3 and tank for compensating thermal expansion of the coolant 6 are equipped with sectioned electric heaters (not shown in the drawing). To minimize heat loss, the heat sink circuit (pipelines 2, 5, 9, heat source 1, heat removal device 3 and tank for compensating thermal expansion of the coolant 6) is provided with thermal insulation (not shown in the 105 drawing).
The method is as follows.
To organize the natural circulation of the liquid metal coolant, which is used as sodium, the following sequence of actions is performed in the heat sink circuit of the research fast neutron nuclear reactor. Sectionalized electric 110 heaters 4 and 7 are switched on for heating pipelines and equipment for the lifting and downing sections of the heat sink circuit to the calculated temperatures T1=230° C. and T2=210° C., respectively. At the same time, the settings of the current regulators provide heating and maintaining the temperature for heat source 1—230° C., for the lifting pipe 2—230° C., for the 115 heat removal device 3—210° C., for downing pipe 5 and the tank for compensating thermal expansion of coolant 6—210° C. Then, evacuation and argon filling of the heat sink circuit are successively performed, and after reaching the required composition of the heat sink circuit gaseous medium, sodium is supplied to the heat sink circuit through the drainage pipe 9 with a 120 flow rate of 2 m3/h and temperature of 225° C. from the tank of the filling and drainage system 8, by opening the valve 10. In start-up mode, the heat source 1 does not work as a heat exchanger, but is used only for the passage of the coolant through it. When sodium reaches the required level in the tank for compensating thermal expansion 6, valve 10 is closed. The pressure in the gas 125 cavity of tank for compensating thermal expansion 6 rises to 0.14 MPa. In the process of filling the heat sink circuit, the sodium coolant receives the temperature of the pipelines walls and the equipment of the circuit, as a result of which a driving pressure of natural circulation is created in the desired direction. As shown in
Number | Date | Country | Kind |
---|---|---|---|
2017126521 | Jul 2017 | RU | national |
Filing Document | Filing Date | Country | Kind |
---|---|---|---|
PCT/RU2018/000478 | 7/18/2018 | WO | 00 |