METHOD FOR PLANNING DISTRIBUTION NETWORK WITH RELIABILITY CONSTRAINTS BASED ON FEEDER CORRIDOR

Information

  • Patent Application
  • 20210334429
  • Publication Number
    20210334429
  • Date Filed
    July 02, 2021
    3 years ago
  • Date Published
    October 28, 2021
    3 years ago
Abstract
The present disclosure provides a method for planning a distribution network with reliability constraints based on a feeder corridor, including determining installation states of respective elements in the distribution network; determining an objective function, the objective function being an objective function of minimizing a total investment cost of the distribution network; obtaining fault-isolation-and-load-transfer time and fault recovery time in a case where the feeder segment of each feeder line that is contained in each feeder corridor fails; determining constraint conditions including reliability constraints; building a distribution network planning model according to the objective function and the constraints; and solving the distribution network planning model built to obtain optimal solutions as planning states and reliability indexes to plan the distribution network.
Description
TECHNICAL FIELD

The present disclosure relates to a technical field of power system, and more particularly to a method for planning a distribution network with reliability constraints based on a feeder corridor.


BACKGROUND

Distribution network planning plays an important role in planning a power system, for providing a reasonable and economical solution for constructing the distribution network so as to allow the distribution network to meet increasing demand of power load at present or in the future 10 to 30 years.


A feeder corridor refers to a path along which distribution feeder lines may be routed through overhead towers and cables. The feeder corridor is usually planned in advance in an urban planning.


In the field of power, reliability refers to a capability of the power system to continuously meet requirements of end users to the quantity and quality of electronic power. The reliability of the distribution network is generally indicated by several indexes including a customer interruption frequency (CIF), a customer interruption duration (CID), a system average interruption frequency index (SAIFI), a system average interruption duration index (SAIDI), and expected energy not supplied (EENS).


In the related art, most methods for planning the distribution network rely on a set of candidate routes (branches) that have been predetermined manually. That is, a subset of the set of candidate routes may be selected as an input of a planning model, to obtain a final planning solution. However, the candidate routes selected manually may not be considered completely. On the other hand, if it is intended to output a planning model by exhausting the whole set of the candidate routes, the model would not be solvable and could not generate any implementable planning results.


SUMMARY

The present disclosure aims to at least solve the technical problems in the related art to some extents.


For this purpose, method for planning a distribution network with reliability constraints based on a feeder corridor, the distribution network including at least one feeder line, a circuit breaker that is capable of interrupting a fault current being installed at the head of each feeder line, each feeder line being divided into a plurality of feeder segments through at least one interconnection switch that is not capable of interrupting the fault current, at least one of the plurality of feeder segments being contained in the feeder corridor, and 0 or 1 interconnection switch provided between each feeder line and other feeder line, the method comprising:


determining installation states of respective elements in the distribution network, the elements including at least one of the feeder line, the feeder segments, the feeder corridor, the interconnection switch, a transformer, a substation, the circuit breaker, and switching devices;


determining an objective function, the objective function being an objective function of minimizing a total investment cost CTotal of the distribution network, as expressed by the following formula (1):
















Minimize
:





C
Total


=




f



(



c
f



l
f


+



ij




c
ij
f



l
ij
f




)


+



ij




c
ij



l
ij



+



i





fg




c
i
fg



l
i
fg




+



tr




c
tr



u
tr



+



SS




c
SS



u
SS



+

ω





SAIDI



,





(
1
)







where

    • Cf indicates a construction cost of the circuit breaker and a recloser in a feeder line f,
    • lf is a 0-1 variable indicating whether to build the feeder line f, with lf=1 indicating to build and lf=0 indicating not to build,
    • Cijf indicates a construction cost of the feeder segment of the feeder line f that is contained in the feeder corridor ij,
    • lijf is a 0-1 variable indicating whether to build the feeder segment of the feeder line f that is contained in the feeder corridor ij, with lijf=1 indicating to build and lijf=0 indicating not to build,
    • Cij indicates an occupation cost the feeder corridor ij,
    • lij is a 0-1 variable indicating whether to occupy the feeder corridor ij, with lij=1 indicating to occupy and lij=0 indicating not to occupy,
    • cifg indicates a construction cost of the interconnection switch between the feeder line f and a feeder line g at a node i,
    • lifg is a 0-1 variable indicating whether to build the interconnection switch between the feeder line f and the feeder line g at the node i, with lifg=1 indicating to build and lifg=0 indicating not to build,
    • Ctr indicates a construction cost of a transformer tr,
    • utr is a 0-1 variable indicating whether to build the transformer tr, with utr=1 indicating to build and utr=0 indicating not to build,
    • Css indicates a construction cost of a substation SS,
    • uss is a 0-1 variable indicating whether to build the substation SS, with uss=1 indicating to build and uss=0 indicating not to build, and
    • ωSAIDI indicates a reliability cost, in which ω is a weighting factor ranging from 1 to 100, and SAIDI indicates a system average interruption duration index;


obtaining fault-isolation-and-load-transfer time and fault recovery time in a case where the feeder segment of each feeder line that is contained in each feeder corridor fails, by the following steps:

    • opening a circuit breaker in the upstream of a feeder segment to interrupt the fault current upon the feeder segment of the feeder line that is contained in the feeder corridor fails, to cause power outage in downstream nodes of the circuit breaker;
    • operating all the switching devices and circuit breakers in the distribution network manually to recover the power supply at the outage nodes to the maximum extent; and
    • recovering the fault feeder segment, and restoring the distribution network to its original structure by operating the switching devices and the circuit breaker,
    • wherein, the fault-isolation-and-load-transfer time refers to a time period from the time of failure to the time when the circuit breakers and the switching devices are operated manually for fault isolation and the power is restored to the affected nodes, and
    • wherein, the fault recovery time refers to a time from the time of failure to the time when the fault is restored;


determining constraint conditions based on the obtained fault-isolation-and-load-transfer time and fault recovery time, the constraint conditions including reliability constraints, as expressed by the following formulas (2) to (11):











CID
i

=



xy





h



[



λ

[

xy
,
h

]




τ
SW

[

xy
,
h

]




p
i

[

xy
,
h

]



+


(


τ
RP

[

xy
,
h

]


-

τ
SW

[

xy
,
h

]



)



(

1
-

q
i

[

xy
,
h

]



)



]




,















i


Ψ

;





(
2
)













CID
i

=



xy





h



[


λ

[

xy
,
h

]




p
i

[

xy
,
h

]



]




,















i


Ψ

;






(
3
)












SAIDI
=




i




NC
i



CID
i






i



NC
i




;





(
4
)












SAIFI
=




i




NC
i



CIF
i






i



NC
i




;





(
5
)












EENS
=




b

B







Δ





b

8760





i




CID
i



μ
b



P
i






;





(
6
)













CIF
i



ɛ
i
CIF


,















i


Ψ

;






(
7
)













CID
i



ɛ
i
CIF


,















i


Ψ

;






(
8
)












SAIFI


ɛ
SAIFI


;





(
9
)












SAIDI


ɛ
SAIDI


;





(
10
)












EENS


ɛ
EENS


,





(
11
)







where

    • CIDi indicates a customer interruption duration at the node i,
    • λ[xy,h] indicates an annual failure rate of a feeder segment of a feeder line h that is contained in the feeder corridor xy,
    • τSW[xy,h] indicates the fault-isolation-and-load-transfer time in a case where the feeder segment of the feeder line h that is contained in the feeder corridor xy fails,
    • τRP[xy,h] indicates the fault recovery time in the case where the feeder segment of the feeder line h that is contained in the feeder corridor xy fails,
    • CIFi indicates a customer interruption frequency at the node i,
    • NCi indicates a number of the customers at the node i,
    • SAIFI indicates a system average interruption frequency index,
    • SAIDI indicates a system average interruption duration index,
    • ASAI indicates an average service availability index,
    • EENS indicates an expected energy not supplied,
    • B indicates a set of all load levels,
    • Δb indicates annual hours for which a load level b lasts, b∈B,
    • μb indicates a peak load ratio of the load level b, with μb≤1,
    • Li indicates a peak load at the node i,
    • εiCIF indicates an upper limit of the annual average interruption frequency at the node i,
    • εiCID indicates an upper limit of the annual average interruption duration at the node i,
    • εSAIFI indicates an upper limit of the system average interruption frequency index,
    • εSAIDI indicates an upper limit of the system average interruption duration index, and
    • εEENS indicates an upper limit of the expected energy not supplied;


building a distribution network planning model based on mixed integer linear programming model according to the objective function and the constraints;


solving the distribution network planning model built solving the distribution network planning model built to obtain optimal solutions of the variable lf indicating whether to build the feeder line f, the variable lijf indicating whether to build the feeder segment of the feeder line f that is contained in the feeder corridor ij, the variable lij indicating whether to occupy the feeder corridor ij, the variable lifg indicating whether to build the interconnection switch between the feeder line f and the feeder line g at the node i, the variable utr indicating whether to build the transformer tr, and the variable uss indicating whether to build the substation feeder SS, as planning states of the feeder line, the feeder segment, the feeder corridor, the interconnection switch, the transformer and the substation, and to obtain optimal solutions of the customer interruption duration CIDi at the node i, the customer interruption frequency CIFi at the node i, the system average interruption duration index SAIDI, the system average interruption frequency index SAIFI, and the expected energy not supplied EENS, as reliability indexes, so as to plan the distribution network based on the planning states and reliability indexes.





BRIEF DESCRIPTION OF THE DRAWINGS


FIG. 1 illustrates a flow chart showing a method for planning a distribution network with reliability constraints based on a feeder corridor according to an embodiment of the present disclosure.





DETAILED DESCRIPTION

Hereinafter, various embodiments of the present disclosure will be described in detail with reference to the accompanying drawings.



FIG. 1 illustrates a flow chart showing a method for planning a distribution network with reliability constraints based on a feeder corridor according to an embodiment of the present disclosure.


The distribution network includes at least one feeder line. At the head of each feeder line, a circuit breaker that is capable of interrupting a fault current may be installed. Each feeder line may be divided into a plurality of feeder segments (branches) through at least one interconnection switch that is not capable of interrupting the fault current. At least one of the plurality of feeder segments may be the feeder segment contained in a feeder corridor. There may be 0 or 1 interconnection switch provided between each feeder line and other feeder line.


As shown in the FIG. 1, the method may include the following steps.


At step S110, installation states of respective elements in the distribution network is determined.


The elements may include at least one of the feeder line, the feeder segments, the feeder corridor, the interconnection switch, a transformer, a substation, the circuit breaker, and switching devices.


At step S120, an objective function is determined. The objective function may be an objective function of minimizing a total investment cost cTotal of the distribution network, as expressed by the following formula (1):





Minimize:cTotalf(cflfijcijflijf)+ΣijcijlijΣiΣfgcifglifgtrctrutrSScSSuSS=ωSAIDI  (1),


where

    • cf indicates a construction cost of the circuit breaker and a recloser in a feeder line f,
    • lf is a 0-1 variable indicating whether to build the feeder line f, with lf=1 indicating to build and lf=0 indicating not to build,
    • cijf indicates a construction cost of the feeder segment of the feeder line f that is contained in the feeder corridor ij,
    • lijf is a 0-1 variable indicating whether to build the feeder segment of the feeder line f that is contained in the feeder corridor ij, with lijf=1 indicating to build and lijf=0 indicating not to build,
    • cij indicates an occupation cost the feeder corridor ij,
    • lij is a 0-1 variable indicating whether to occupy the feeder corridor ij, with lij=1 indicating to occupy and lij=0 indicating not to occupy,
    • cifg indicates a construction cost of the interconnection switch between the feeder line f and a feeder line g at a node i,
    • lifg is a 0-1 variable indicating whether to build the interconnection switch between the feeder line f and the feeder line g at the node i, with lifg=1 indicating to build and lifg=0 indicating not to build,
    • ctr indicates a construction cost of a transformer tr,
    • utr is a 0-1 variable indicating whether to build the transformer tr, with utr=1 indicating to build and utr=0 indicating not to build,
    • cSS indicates a construction cost of a substation SS,
    • uSS is a 0-1 variable indicating whether to build the substation SS, with uSS=1 indicating to build and uSS=0 indicating not to build, and
    • ωSAIDI indicates a reliability cost, in which ω is a weighting factor ranging from 1 to 100, and SAIDI indicates a system average interruption duration index.


At step S130, fault-isolation-and-load-transfer time and fault recovery time in a case where the feeder segment of each feeder line that is contained in each feeder corridor fails is obtained.


The fault-isolation-and-load-transfer time and the fault recovery time are obtained by the following steps.


It is assumed that the circuit breaker in the feeder line is closed in normal operation. Upon a feeder segment of the feeder line that is contained in the feeder corridor fails, a circuit breaker in the upstream of the feeder segment is opened first to interrupt the fault current, to cause power outage in downstream nodes of the circuit breaker. Then, all the switching devices and circuit breakers in the distribution network are operated manually to recover the power supply at the outage nodes to the maximum extent. Finally, the fault feeder segment is recovered. After that, the distribution network is restored to its original structure by operating the switching devices and the circuit breaker.


Specifically, the fault-isolation-and-load-transfer time refers to a time period from the time of failure to the time when the circuit breakers and the switching devices are operated manually for fault isolation and the power is restored to the affected nodes.


Further, the fault recovery time refers to a time from the time of failure to the time when the fault is restored.


At step S140, constraint conditions are determined based on the obtained fault-isolation-and-load-transfer time and fault recovery time. The constraint conditions includes reliability constraints, as expressed by the following formulas (2) to (11):











CID
i

=



xy





h



[



λ

[

xy
,
h

]




τ
SW

[

xy
,
h

]




p
i

[

xy
,
h

]



+


(


τ
RP

[

xy
,
h

]


-

τ
SW

[

xy
,
h

]



)



(

1
-

q
i

[

xy
,
h

]



)



]




,















i


Ψ

;





(
2
)













CID
i

=



xy





h



[


λ

[

xy
,
h

]




p
i

[

xy
,
h

]



]




,















i


Ψ

;






(
3
)












SAIDI
=




i




NC
i



CID
i






i



NC
i




;





(
4
)












SAIFI
=




i




NC
i



CIF
i






i



NC
i




;





(
5
)












EENS
=




b

B







Δ





b

8760





i




CID
i



μ
b



P
i






;





(
6
)













CIF
i



ɛ
i
CIF


,















i


Ψ

;






(
7
)













CID
i



ɛ
i
CIF


,















i


Ψ

;






(
8
)












SAIFI


ɛ
SAIFI


;





(
9
)












SAIDI


ɛ
SAIDI


;





(
10
)












EENS


ɛ
EENS


,





(
11
)







where

    • CIDi indicates a customer interruption duration at the node i,
    • λ[xy,h] indicates an annual failure rate of a feeder segment of a feeder line h that is contained in the feeder corridor xy,
    • τSW[xy,h] indicates the fault-isolation-and-load-transfer time in a case where the feeder segment of the feeder line h that is contained in the feeder corridor xy fails,
    • τRP[xy,h] indicates the fault recovery time in the case where the feeder segment of the feeder line h that is contained in the feeder corridor xy fails,
    • CIFi indicates a customer interruption frequency at the node i,
    • NCi indicates a number of the customers at the node i,
    • SAIFI indicates a system average interruption frequency index,
    • SAIDI indicates a system average interruption duration index,
    • ASAI indicates an average service availability index,
    • EENS indicates an expected energy not supplied,
    • B indicates a set of all load levels,
    • Δb indicates annual hours for which a load level b lasts, b∈B,
    • μb indicates a peak load ratio of the load level b, with μb≤1,
    • Li indicates a peak load at the node i,
    • εiCIF indicates an upper limit of the annual average interruption frequency at the node i,
    • εiCID indicates an upper limit of the annual average interruption duration at the node i,
    • εSAIFI indicates an upper limit of the system average interruption frequency index,
    • εSAIDI indicates an upper limit of the system average interruption duration index, and
    • εEENS indicates an upper limit of the expected energy not supplied.


It is noted that the above upper limits may be set as necessary by the planners and are not specifically limited here.


In an embodiment, the constraint conditions may further include constraints of power balance and branching in a normal operation state of the distribution network, as expressed by the following formulas (12) to (19):















j


Ψ
i





P
ij

f
,
NO



+

P
i

f
,
NO



=
0

,










i



Ψ
SS


,











f


Ω

;





(
12
)












j


Ψ
i





P
ij

f
,
NO



+

P
i

f
,
NO



=

P
tr

f
,
NO



,











i



Ψ
SS


;





(
13
)










f



P
i

f
,
NO



=

P
i


,











i


Ψ

;





(
14
)








-

MF
i
f




P
i

f
,
NO




MF
i
f


,










i


Ψ

,











f


Ω

;





(
15
)










f



F
i
f



1

,











i


Ψ

;





(
16
)








-

Mk
ij

f
,
NO





P
ij

f
,
NO




Mk
ij

f
,
NO



,










ij


γ

,











f


Ω

;





(
17
)








-

S
fd
f




P
ij

f
,
NO




S
fd
f


,










ij


γ

,











f


Ω

;





(
18
)











f


Ω
tr





P
tr

f
,
NO





S
tr


,









tr

,




(
19
)







where

    • Pijf,NO indicates active power flowing from the node i to a node j through the feeder line f in the normal operation state,
    • Ψi indicates a set of nodes connected to the node i directly,
    • Pif,NO indicates active load power at the node i where the feeder line f is located in the normal operation state,
    • ΨSS indicates a set of nodes where the substations are located,
    • Ω indicates a set of all the feeder lines,
    • Ptrf,NO indicates active power outputted from the transformer tr to the feeder line f in the normal operation state,
    • Pi indicates active load power at the node i,
    • Ψ indicates a set of all the nodes,
    • M represents a large positive number ranging from 10,000 to 10,000,000, and is 1,000,000 in this embodiment,
    • Fif is a 0-1 variable indicating whether to supply power to the node i through the feeder line f in the normal operation state, with Fif=1 indicating to supply and Fif=0 indicating not to supply,
    • kijf,NO is a 0-1 variable indicating a connection state of the feeder segment of the feeder line f that is contained in the feeder corridor ij in the normal operation state, with kijf,NO=1 indicating being connected and kijf,NO=0 indicating being disconnected,
    • Υ indicates a set of all the feeder corridors,
    • Sfdf indicates a capacity of the feeder line f,
    • Str indicates a capacity of the transformer tr, and
    • Ωtr indicates a set of the feeder lines belong to the transformer tr.


In an embodiment, the constraint conditions may further include constraints of power balance and branching in a fault state of the distribution network, as expressed by the following formulas (20) to (30):






k
xy
h,[xy,h]=0   (20);






k
xy
h,NO
+F
i
h−1≤pi[xy,h],∀i   (21);





Σj∈ΨiPijf,[xy,h]+Pif,[xy,h]g≠fPifg,[xy,h]=0,∀i∉ΨSS,∀f∈Ω   (22);





Σj∈ΨiPijf,[xy,h]+Pif,[xy,h]g≠fPifg,[xy,h]=Ptrf,[xy,h],∀i∈ΨSS   (23);





ΣfPif,[xy,h]=qi[xy,h]Pi,∀i∈Ψ   (24);






q
i
[xy,h]≥1−pi[xy,h],∀i∈Ψ   (25);





MFif≤Pif,[xy,h]≤MFif,∀i∈Ψ,∀f∈Ω   (26);





Mkifg,[xy,h]≤Pifg,[xy,h]≤Mkifg,[xy,h],∀ij∈Υ,∀f∈Ω   (27);





Mkijf,[xy,h]≤Pijf,[xy,h]≤Mkijf,[xy,h],∀ij∈Υ,∀f∈Ω   (28);





Sfdf≤Pijf,[xy,h]≤Sfdf,∀ij∈Υ,∀f∈Ω   (29);






P
tr
f,[xy,h]
≤S
tr
f
,∀f∈Ω
tr   (30),


where ∀[xy,h] is applicable to all the formulas (20) to (30), and


where


kijf,[xy,h] is a 0-1 variable indicating a connection state of the feeder segment of the feeder line f that is contained in the feeder corridor ij in a case where the feeder segment of the feeder line h that is contained in the feeder corridor xy fails, with kijf,[xy,h]=1 indicating being connected and kijf,[xy,h]=0 indicating being disconnected,


pi[xy,h] is a 0-1 variable indicating an affected state of the load at the node i in the case where the feeder segment of the feeder line h that is contained in the feeder corridor xy fails, with pi[xy,h]=1 indicating being affected to lose power supply and pi[xy,h]=0 indicating not being affected,


Pijf,[xy,h] indicates active power flowing from the node i to the node j through the feeder line f in the case where the feeder segment of the feeder line h that is contained in the feeder corridor xy fails,


Pif,[xy,h] indicates active load power at the node i where the feeder line f is located in the case where the feeder segment of the feeder line h that is contained in the feeder corridor xy fails,


Pifg,[xy,h] indicates active power flowing from the feeder line f to the feeder line g at the node i via the interconnection switch in the case where the feeder segment of the feeder line h that is contained in the feeder corridor xy fails,


Ptrf,[xy,h] indicates active power outputted from the transformer tr to the feeder line f in the case where the feeder segment of the feeder line h that is contained in the feeder corridor xy fails,


Pif,[xy,h] indicates active power outputted from the transformer tr to the feeder line f in the case where the feeder segment of the feeder line h that is contained in the feeder corridor xr fails,


qi[xy,h] is a 0-1 variable indicating a state of power supply at the node i in the case where the feeder segment of the feeder line h that is contained in the feeder corridor xy fails, with qi[xy,h]=1 indicating normal power supply and pi[xy,h]=0 indicating loss of power supply, and


[xy,h] indicates a scenario in which the feeder segment of the feeder line h that is contained in the feeder corridor xy fails.


In an embodiment, the constraint conditions may further include constraints of equipment construction, as expressed by the following formulas (31) to (36):











k
ij

f
,
NO




l
ij
f


,










ij


γ

,











f


Ω

;





(
31
)








k
ij

f
,

[

xy
,
h

]





l
ij
f


,










ij


γ

,










f


Ω

,











[

xy
,
h

]


;





(
32
)








k
i

fg
,

[

xy
,
h

]





l
i
fg


,










i


Ψ

,









fg

,











[

xy
,
h

]


;





(
33
)










f



l
ij
f





N
ij



l
ij



,











ij


γ

;





(
34
)











f


Ω
tr





l
f





N
tr



u
tr



,










tr

;





(
35
)











tr


Λ
SS





u
tr





N
SS



u
SS



,









SS

,




(
36
)







where

    • Nij indicates a number of the feeder segments that may be contained in the feeder corridor ij,
    • Ntr indicates a number of the feeder lines that may be arranged from the transformer tr,
    • NSS indicates a number of the transformers that may be supported by the substation SS, and
    • ΛSS indicates a set of the transformers belonging to the substation SS.


In step S150, a distribution network planning model based on mixed integer linear programming model is built according to the objective function and the constraints.


In step S160, the distribution network planning model built is solved, solving the distribution network planning model built to obtain optimal solutions of the variable lf indicating whether to build the feeder line f, the variable lijf indicating whether to build the feeder segment of the feeder line f that is contained in the feeder corridor ij, the variable lij indicating whether to occupy the feeder corridor ij, the variable lifg indicating whether to build the interconnection switch between the feeder line f and the feeder line g at the node i, the variable utr indicating whether to build the transformer tr, and the variable uss indicating whether to build the substation feeder SS, as planning states of the feeder line, the feeder segment, the feeder corridor, the interconnection switch, the transformer and the substation, and to obtain optimal solutions of the customer interruption duration CIDi at the node i, the customer interruption frequency CIFi at the node i, the system average interruption duration index SAIDI, the system average interruption frequency index SAIFI, and the expected energy not supplied EENS, as reliability indexes, so as to plan the distribution network based on the planning states and reliability indexes.


In the embodiment, the distribution network planning model built may be solved by the branch-and-bound method and the linear programming method.


The method for planning the distribution network with the reliability constraints based on the feeder corridor according to the embodiment of the present disclosure may build the distribution network planning model by using the investment cost of the distribution network as the objective function, and comprehensively planning the substation, the transformer, the feeder line and the interconnection switch in the distribution network based on the information about the substation, the load distribution and the feeder corridor. The model is a mixed integer linear programming model that may be solved directly by a solver, avoiding the complexity and unreliability of traditional planning methods which would generate a set of candidate routes and then select among them. Accordingly, the calculation in the method according to the present disclosure is highly efficient and accurate. Additionally, the planning results satisfying the reliability constraints may be determined by solving the model, which reduces the cost of the distribution network


In addition, the feeder corridors are usually planned in advance in urban planning, which is easier to get compared with the set of candidate routes. Accordingly, with the method according to the present disclosure, the distribution network planning model directly based on the information about the feeder corridors may skip the step of generating the set of candidate routes, which is more practical and effective in actual planning projects. Further, when calculating the reliability indexes, the present disclosure may build the model directly based on the feeder corridors without searching tentatively or generating the set of candidate routes, avoiding the time investment and labor cost in generating the set of candidate routes.


In addition, the method accordingly the present disclosure is simple and easy to implement, thereby obtaining the optimal scheme with the reliability constraints satisfied and the investment cost reduced.


Although embodiments of the present disclosure are illustrated and described above, it should be understood that the above embodiments are exemplary and should not be construed as limiting the present disclosure, and the skilled in the art may make changes, modifications, substitutions and variations to the above embodiments within the scope of the present disclosure.

Claims
  • 1. A method for planning a distribution network with reliability constraints based on a feeder corridor, the distribution network comprising at least one feeder line, a circuit breaker that is capable of interrupting a fault current being installed at a head of each feeder line, each feeder line being divided into a plurality of feeder segments through at least one interconnection switch that is not capable of interrupting the fault current, at least one of the plurality of feeder segments being contained in the feeder corridor, and 0 or 1 interconnection switch provided between each feeder line and other feeder line, the method comprising: determining installation states of respective elements in the distribution network, the elements comprising at least one of the feeder line, the feeder segments, the feeder corridor, the interconnection switch, a transformer, a substation, the circuit breaker, and switching devices;determining an objective function, the objective function being an objective function of minimizing a total investment cost CTotal of the distribution network, as expressed by the following formula (1):
  • 2. The method according to claim 1, wherein the constraint conditions further comprises constraints of power balance and branching in a normal operation state of the distribution network, as expressed by the following formulas (12) to (19):
  • 3. The method according to claim 1, wherein the constraint conditions further comprises constraints of power balance and branching in a fault state of the distribution network, as expressed by the following formulas (20) to (30): kxyh,[xy,h]=0   (20);kxyh,NO+Fih−1≤pi[xy,h],∀i   (21);Σj∈ΨiPijf,[xy,h]+Pif,[xy,h]+Σg≠fPifg,[xy,h]=0,∀i∉ΨSS,∀f∈Ω   (22);Σj∈ΨiPijf,[xy,h]+Pif,[xy,h]+Σg≠fPifg,[xy,h]=Ptrf,[xy,h],∀i∈ΨSS   (23);ΣfPif,[xy,h]=qi[xy,h]Pi,∀i∈Ψ   (24);qi[xy,h]≥1−pi[xy,h],∀i∈Ψ   (25);−MFif≤Pif,[xy,h]≤MFif,∀i∈Ψ,∀f∈Ω   (26);−Mkifg,[xy,h]≤Pifg,[xy,h]≤Mkifg,[xy,h],∀ij∈Υ,∀f∈Ω   (27);−Mkijf,[xy,h]≤Pijf,[xy,h]≤Mkijf,[xy,h],∀ij∈Υ,∀f∈Ω   (28);−Sfdf≤Pijf,[xy,h]≤Sfdf,∀ij∈Υ,∀f∈Ω   (29);Ptrf,[xy,h]≤Strf,∀f∈Ωtr   (30),where ∀[xy,h] is applicable to all the formulas (20) to (30), andwherekijf,[xy,h] is a 0-1 variable indicating a connection state of the feeder segment of the feeder line f that is contained in the feeder corridor ij in a case where the feeder segment of the feeder line h that is contained in the feeder corridor xy fails, with kijf,[xy,h]=1 indicating being connected and kijf,[xy,h]=0 indicating being disconnected,pi[xy,h] is a 0-1 variable indicating an affected state of the load at the node i in the case where the feeder segment of the feeder line h that is contained in the feeder corridor xy fails, with pi[xy,h]=1 indicating being affected to lose power supply and pi[xy,h]=0 indicating not being affected,Pijf,[xy,h] indicates active power flowing from the node i to the node j through the feeder line f in the case where the feeder segment of the feeder line h that is contained in the feeder corridor xy fails,Pif,[xy,h] indicates active load power at the node i where the feeder line f is located in the case where the feeder segment of the feeder line h that is contained in the feeder corridor xy fails,Pifg,[xy,h] indicates active power flowing from the feeder line f to the feeder line g at the node i via the interconnection switch in the case where the feeder segment of the feeder line h that is contained in the feeder corridor xy fails,Ptrf,[xy,h] indicates active power outputted from the transformer tr to the feeder line f in the case where the feeder segment of the feeder line h that is contained in the feeder corridor xy fails,Pif,[xy,h] indicates active power outputted from the transformer tr to the feeder line f in the case where the feeder segment of the feeder line h that is contained in the feeder corridor xr fails,qi[xy,h] is a 0-1 variable indicating a state of power supply at the node i in the case where the feeder segment of the feeder line h that is contained in the feeder corridor xy fails, with qi[xy,h]=1 indicating normal power supply and pi[xy,h]=0 indicating loss of power supply, and[xy,h] indicates a scenario in which the feeder segment of the feeder line h that is contained in the feeder corridor xy fails.
  • 4. The method according to claim 1, wherein the constraint conditions further comprise constraints of equipment construction, as expressed by the following formulas (31) to (36):
Priority Claims (1)
Number Date Country Kind
202010268609.2 Apr 2020 CN national
CROSS REFERENCE TO RELATED APPLICATION

This application is a continuation of International Application No. PCT/CN2020/085972, filed on Apr. 21, 2020, which claims priority to Chinese Patent Application No. 202010268609.2, filed on Apr. 8, 2020, the entire disclosures of which are incorporated by reference herein.

Continuations (1)
Number Date Country
Parent PCT/CN2020/085972 Apr 2020 US
Child 17366199 US