Claims
- 1. A method of predicting a time developing property of a cement or a cement slurry comprising
- forming a calibration model by determining infrared spectra for a series of known cement compositions;
- obtaining the infrared spectrum of said cement or cement slurry; and
- obtaining a prediction of said time-developing property by applying values representing said infrared spectrum of said cement or cement slurry to the model and correlating these with measured values of the time-developing property for the cement compositions in the series.
- 2. The method of claim 1 in which the Fourier transform infrared spectrum is obtained, and the cement is an oil well cement or oil well cement slurry.
- 3. The method of claim 2 in which the time-developing property is the thickening time.
- 4. A method of predicting a time developing property of a cement or a cement slurry comprising
- forming a spectrum model by determining spectra, including infrared spectra, for a series of known cement compositions;
- obtaining the infrared spectrum of said cement or cement slurry; and
- obtaining a prediction of said time-developing property by applying values representing said infrared spectrum of said cement or cement slurry to the model and correlating these with measured values of the time-developing property for the cement compositions in the series.
- 5. The method of claim 4 in which the Fourier transform infrared spectrum is obtained, and the cement is an oil well cement or oil well cement slurry.
- 6. The method of claim 5 in which the time-developing property is the thickening time of the cement slurry.
- 7. A method of predicting a time developing property of an oil well cement or an oil well cement slurry comprising
- forming a calibration model by determining infrared spectra for a series of known cement compositions;
- obtaining the Fourier transform infrared spectrum of said cement or cement slurry; and
- obtaining a prediction of said time-developing property by applying values representing said infrared spectrum of said cement or cement slurry to the model, including inputting values representing the infrared spectrum of said cement or cement slurry to a neural network device configured to output a value representative of the time-developing property, the neural network device being a) configured to utilize each of said values as input values, b) provided with at least one hidden layer of at least one node, and c) trained with a dataset comprising a series of values of said infrared spectrum and values corresponding to the time-developing property, and correlating these with measured values of the time-developing property for the cement compositions in the series.
- 8. The method of claim 7 wherein the neural network device is configured to have one or two hidden layers, each with 1 to 12 nodes.
- 9. The method of claim 8 in which the time-developing property is the thickening time.
- 10. The method of claim 7 in which the time-developing property is the thickening time.
- 11. A method of predicting a time developing property of an oil well cement or an oil well cement slurry comprising
- forming a spectrum model by determining spectra, including infrared spectra, for a series of known cement compositions;
- obtaining the Fourier transform infrared spectrum of said cement or cement slurry; and
- obtaining a prediction of said time-developing property by applying values representing said infrared spectrum of said cement or cement slurry to the model, inputting values representing the infrared spectrum of said cement or cement slurry to a neural network device configured to output a value representative of the time-developing property, the neural network device being a) configured to utilize each of said values as input values, b) provided with at least one hidden layer of at least one node, and c) trained with a dataset comprising a series of values of said infrared spectrum and values corresponding to the time-developing property, and correlating these with measured values of the time-developing property for the cement compositions in the series.
- 12. The method of claim 11 wherein the neural network device is configured to have one or two hidden layers, each with 1 to 12 nodes.
- 13. The method of claim 12 in which the time-developing property is the thickening time.
- 14. The method of claim 11 wherein the spectrum model comprises data from at least nine properties selected from
- (a) percentage by weight of each of the minerals tricalcium silicate, dicalcium silicate, tricalcium aluminate and calcium alumino-ferrite;
- (b) total percentage by weight of sulphate;
- (c) Blaine surface area
- (d) Percentage by weight of each of MgO, total alkali content and free lime;
- (a) percentage loss, by weight, on ignition;
- (f) Insoluble residue (IR);
- (g) Water-to-solid ratio for all cement slurries (W/S);
- (h) Weight percent of sodium chloride (NaCl) retarder in some cement blends;
- (i) Weight percent of calcium chloride (CaCl.sub.2) accelerator in some cement blends;
- (j) Thickening time schedules defined by well depth (Depth), bottom hole temperature (BHT) and bottom hole pressure (BHP) (3 input variables);
- (k) Thickening time to 100 Bearden units (T/100); and
- (l) Particle size distribution;
- (m) Percentage by weight of calcium hydroxide and calcium carbonate.
- 15. The method of claim 14 in which the time-developing property is the thickening time.
- 16. The method of claim 11 in which the time-developing property is the thickening time.
Priority Claims (1)
Number |
Date |
Country |
Kind |
9125426 |
Nov 1991 |
GBX |
|
Parent Case Info
This application is a continuation of application Ser. No. 08/244,324, filed on May 25, 1994, now abandoned, which is a 371 of PCT/GB92/02216 filed Nov. 30, 1992.
PCT Information
Filing Document |
Filing Date |
Country |
Kind |
102e Date |
371c Date |
PCT/GB92/02216 |
11/30/1992 |
|
|
5/25/1994 |
7/28/1994 |
Publishing Document |
Publishing Date |
Country |
Kind |
WO93/11423 |
6/10/1993 |
|
|
US Referenced Citations (7)
Foreign Referenced Citations (2)
Number |
Date |
Country |
1038698A |
Jan 1990 |
CNX |
2 111 193 |
Jun 1983 |
GBX |
Continuations (1)
|
Number |
Date |
Country |
Parent |
244324 |
|
|