The present disclosure generally relates to rolling plants and processes for producing composite materials in rolling plants.
Processes in which slabs of different materials are assembled to form a slab packet, for example in the form of a TriBond® slab, and combined with one another by hot rolling to give a composite material in order to be able to set or realize properties of the composite material in a targeted manner are adequately known from the prior art. For the hot rolling, it is necessary for the slab packet to be heated to a temperature of more than 1200° C. It is desirable here for the temporary composite present in the form of the slab packet to have a homogeneous temperature distribution. Otherwise, there is a risk that bonding defects which reduce the quality of the finished composite material will occur during hot rolling. Uniform heating of the temporary composite is made difficult by partings between the workpieces, i.e. the slabs and the strips, arranged on top of one another in the temporary composite, since the heat transport in the region of such a parting is limited by the comparatively restricted heat transfer by radiation and convection. To therefore ensure the desired homogeneous temperature distribution, it is advised that the residence time in a reheating furnace, by means of which the temporary composite is heated for rolling, be increased, as a result of which the total time outlay for production of the composite material is ultimately increased.
Thus a need exists for a process for producing a composite material, by means of which a homogeneous temperature distribution can be set in a temporary composite without significantly increasing the residence time in a reheating furnace.
Although certain example methods and apparatus have been described herein, the scope of coverage of this patent is not limited thereto. On the contrary, this patent covers all methods, apparatus, and articles of manufacture fairly falling within the scope of the appended claims either literally or under the doctrine of equivalents. Moreover, those having ordinary skill in the art will understand that reciting “a” element or “an” element in the appended claims does not restrict those claims to articles, apparatuses, systems, methods, or the like having only one of that element, even where other elements in the same claim or different claims are preceded by “at least one” or similar language. Similarly, it should be understood that the steps of any method claims need not necessarily be performed in the order in which they are recited, unless so required by the context of the claims. In addition, all references to one skilled in the art shall be understood to refer to one having ordinary skill in the art.
A process for producing a composite material in a rolling plant may involve providing a first workpiece and a second workpiece in the form of a temporary composite, and rolling the temporary composite to form the composite material. A planar connection may be produced between the first workpiece and the second workpiece in the temporary composite by prerolling and intermediate heating timewise before rolling.
Compared to the prior art, the process of the invention has the advantage that a heat-transmitting join is formed by the first planar connection between the first workpiece and the second workpiece arranged in the temporary composite. This heat-transmitting join ensures improved heating-through of the temporary composite by heat transport mechanisms which are relied on for further conduction of the heat along a parting or a minimal air gap (radiation and convection). As a result of this targeted improvement in the heat input by means of the prerolling, a homogeneous temperature distribution can be established during heating of the temporary composite for rolling, without the residence time being increased.
The temporary composite is preferably a slab packet, in particular a TriBond® slab packet, in which a first workpiece is arranged between two second workpieces. Apart from such a three-layer temporary composite, it is also possible to conceive of a five-layer system in which a third workpiece is in each case arranged between the first workpiece and the second workpiece. It will be clear to a person skilled in the art that the first workpiece, the second workpiece and the third workpiece preferably differ from one another for example in terms of their material composition, i.e. the material of which they are made, or their thickness. To allow reliable transport of the temporary composite, welding seams which run along the extent of the temporary composite continuously between the first workpiece and the second workpiece are provided. Furthermore, the total thickness of the temporary composite is reduced by the prerolling by about 20%, for example from 285 mm down to 230 mm, in particular without going outside the dimensional spectrum of the slab packet. The temporary composite is prerolled in from two to three rolling passes, i.e. in from two to three passages through the rollers, in order to achieve the desired planar connection. Furthermore, it will be clear to a person skilled in the art that the planar connection between the first workpiece and the second workpiece does not have to extend over the entire possible contact region.
Advantageous embodiments and further developments of the invention can be derived from the dependent claims and also the description with reference to the drawings.
In a further embodiment of the present invention, the rolling is hot rolling.
In a further embodiment of the present invention, the temporary composite is heated, preferably to a temperature of more than 1200° C., timewise before and/or after prerolling. In this way, the temperature required for formation of the planar connection or the composite material is achieved in an advantageous manner during prerolling or hot rolling.
In a further embodiment of the present invention, the temporary composite is cooled, preferably to not more than 500° C., timewise after prerolling. As a result of the cooling, the probability of the planar connection between the first workpiece and the second workpiece being torn apart after prerolling is advantageously reduced. In particular, the temporary composite with the planar connection is subjected to intermediate storage on a push-off bed timewise after prerolling.
In a further embodiment of the present invention, a flow obstacle, for example in the form of a further slab, is conveyed or moved spatially before the temporary composite in the reheating furnace during heating. In this way, the welding seams between the first workpiece and the second workpiece, which would otherwise be endangered by the combustion gases arising in a furnace provided for heating the temporary composite, can be protected in an advantageous manner. In particular, the temporary composite is moved in the wind shadow of the further slab, preferably during prerolling. Furthermore, it is conceivable for the further slab in the wind shadow of which the temporary composite is moved to be thicker than the temporary composite, in particular at a point in time before prerolling.
In a further embodiment of the present invention, the first workpiece for forming the temporary composite is arranged between a plurality of second workpieces and/or prerolling is carried out when a proportion of the first workpiece in the temporary composite goes below a limit value. As a result, the formation of planar connections is advantageously dispensed with in cases in which, for example as a result of the comparatively small thickness of the first workpiece, the homogeneous temperature distribution in the temporary composite is achieved after the residence time desired for the production sequence, for example 180 minutes, and the formation of the planar connection is therefore unnecessary. In particular, the limit value is fixed as a function of a thickness of the individual workpieces, the material composition thereof and a number of layers of the workpieces arranged in a plurality of layers. It has been found, surprisingly and unexpectedly for a person skilled in the art, that in the case of a proportion of the first workpiece in the total temporary composite the limit value is preferably in the range from 40% to 80%, preferably from 45% to 60% and particularly preferably 50%, for a three-layer slab packet as temporary composite.
In a further embodiment of the present invention, the limit value is fixed by the number of layers of workpieces arranged above one another in the temporary composite. For example, the limit value for the workpiece 1 in the case of a five-layer slab packet as temporary composite is fixed below 50%.
In a further embodiment of the present invention, the prerolling is carried out in a preliminary section, in particular in a preliminary stand, of the rolling plant and rolling is carried out both in the preliminary section and also in a manufacturing section of the rolling plant. In this way, the prerolling and the rolling can be decoupled from one another in such a way that no time delay occurs in the production of the composite material in the manufacturing section as a result of prerolling. Furthermore, the temporary composite is preferably rolled in an oscillating manner in the preliminary stand. Whether the number of rolling passes selected is even or odd depends, inter alia, on whether the temporary composite is pushed off onto the push-off bed spatially before or behind the preliminary stand after prerolling.
In a further embodiment of the present invention, the temporary composite is provided in a preheated state, preferably at from 300° C. to 500° C., by means of a preheating furnace and is arranged in a reheating furnace, preferably in a walking beam furnace, a rotary hearth furnace or a tunnel furnace, for heating, preferably to at least 1220° C. The use of a pusher furnace is avoided in order to prevent the planar connection from being parted by the mechanical forces acting on the temporary composite in the pusher furnace.
In a further embodiment of the present invention, the composite material is reeled up timewise after rolling.
The present invention further provides for the use of a rolling plant for carrying out a process according to the invention, wherein a preheating furnace for preheating, a reheating furnace for heating, a preliminary stand for prerolling and a manufacturing section for rolling are provided in the rolling plant, with the preliminary stand being utilized for forming a planar connection between the first workpiece and the second workpiece. In particular, the process is integrated into a manufacturing line, i.e. into an existing production stream.
Compared to the prior art, the present invention has the advantage that a planar connection can be realized in the temporary composite by means of the use according to the invention of the rolling plant. This join increases the thermal conductivity and thus allows a homogeneous, i.e. uniform, temperature distribution to be able to be established in the temporary composite within the desired residence time.
Number | Date | Country | Kind |
---|---|---|---|
10 2015 110 361.3 | Jun 2015 | DE | national |
This application is a U.S. National Stage Entry of International Patent Application Serial Number PCT/EP2016/063947, filed Jun. 16, 2016, which claims priority to German Patent Application No. DE 10 2015 110 361.3, filed Jun. 26, 2015, the entire contents of both of which are incorporated herein by reference.
Filing Document | Filing Date | Country | Kind |
---|---|---|---|