This application claims priority to and benefit of PCT Application No. PCT/CN2012/001602, entitled “Method for Producing Target Strip Steel with Different Thicknesses in the Longitudinal Direction by a Hot Continuous Rolling Mill,” filed Nov. 30, 2012, which claims the benefit of Chinese Patent Application No. 201210426936.1 filed on Oct. 31, 2012, which are both incorporated herein by reference in their entirety.
The present invention relates to a method for the production of hot rolled strip steel, especially the production method of hot rolled strip steel with variable thickness in different sections in the longitudinal direction.
The variable-thickness plate rolling technology was originated in a Japanese steel company, which started to develop and produce the variable cross-section medium-thickness plate in 1978. Subsequently, French and German steel companies developed variable-thickness plates respectively in the 1980s and 1990s. The development of the variable-thickness rolling technology has been mature in the field of rolling mill for medium-thickness plate.
Most of the existing plate mills are single-stand reversing mills. There does not exist problem of the second flow balance in the process of variable-thickness control. The key point of the variable-thickness is to control the lifting or the depressing of roller gap precisely according to the desired shape, so the variable-thickness control technology of the medium-thickness plate has been developed rapidly. With respect to the medium-thickness plate mill, the conventional hot strip mill is designed to achieve the uniform control of the thickness along the full length of the strip steel, without the capability of the variable-thickness control, so it is more difficult to perform the variable-thickness control on the conventional hot continuous rolling mill.
The conventional hot continuous rolling mill performs control based on the second flow balance. To perform variable-thickness rolling on the conventional hot continuous rolling mill, it is not only required to perform the precise control to the roller gap, but also to perform the control of the timing sequence of the lifting and the depressing of the roller gap of each stand, velocity matching of previous and next stands and the loop stability. It is preferable to avoid the influence on the rolling stability due to the imbalance of the second flow during the thickness varying process. Therefore, it is pretty difficult to perform the precise variable-thickness control on the hot continuous rolling mill. On the other hand, restricted by the user's demands, the application area of the strip still produced with the variable-thickness hot rolling method is very narrow, and most of users need the strip still with uniform thickness, so this technology is developed very slowly in the conventional hot continuous rolling mill.
The present invention is intended to provide a method to produce the strip steel with different target thicknesses in the longitudinal direction by using a hot continuous rolling mill. In this method, the stands participating in the control are determined according to the length of the first equal-thickness section, the target thickness variation amount, the spacing between stands and the rolling stability after the end stand occludes steel; and then, the load variation amount of all sections of the strip is distributed with equal proportion to the stands participating in the control, and the roller gap is set for several times, thus the precision of the strip steel is ensured.
The invention is applied like this:
A method to produce strip steel with different target thicknesses in a longitudinal direction by using a hot continuous rolling mill, wherein: the target strip steel is roll controlled through two control strategies, an equal-thickness control and an variable-thickness control; wherein a first equal-thickness section of the target strip steel is controlled using the equal-thickness control, which adopts a load distribution method of relative depressing rate, a load which should be withstood by each stand is distributed in the principle of diminishing the load from a front stand to a rear stand along a moving direction of the strip steel; transition sections between each equal thickness section, and other equal-thickness sections adopt the variable-thickness control, when the end stand of the hot continuous rolling mill occludes steel, the variable-thickness control is implemented by following steps:
Step 1 determine stands participating in the variable-thickness control; the variable-thickness control is performed by stands in a rear section of the mill, a start stand participating in the variable-thickness control is determined based on a length of a first equal-thickness section of the strip steel, a target thickness variation amount of each equal-thickness section, a spacing between stands and a rolling stability;
Step 2 determine a load of each stand participating in the variable-thickness control; distribute a load variation amount based on a variation amount between a load of each stand in one front equal-thickness section and a load of each stand in one rear equal-thickness section; and obtain a roller gap value of each stand corresponding to a target thickness of each equal-thickness section according to a conversion relation between a load and the roller gap;
Step 3 determine an action timing sequence of each stand participating in the variable-thickness control; calculate a time during which each stand participating in the variable-thickness control performs changing of the roller gap, to cause each stand acts onto a same position on the target strip steel when performing changing of the roller gap;
Step 4 calculate a variation velocity of the roller gap of each stand participating in the variable-thickness control when controlling the transition section between each equal-thickness section, to complete a production control on the strip steel with different target thicknesses in the longitudinal direction.
A specific method to determine stands participating in the variable-thickness control as described in the Step 1 is given as follows:
Select a stand meeting a condition defined by Formula (1) as the start stand I participating in the variable-thickness control:
wherein:
From the point of view of rolling stability, the larger the number of the stands participating in the variable-thickness control is, the more stable the variable-thickness rolling will be, so that the stand with a smallest serial number among all the stands meeting the condition defined by Formula (1) is selected as the start stand.
A specific method to calculate a load of each stand participating in the variable-thickness control in the kth equal-thickness section of the target strip steel as described in the Step 2 is given in Formula (2):
Tik=Ti(k−1)×r (2)
wherein:
wherein:
A specific method to calculate the time during which each stand participating in the variable-thickness control performs changing of the roller gap as described in the Step 3 is given in Formula (5):
wherein:
A specific method to calculate the variation velocity of the roller gap of each stand participating in the variable-thickness control when the transition section between each equal-thickness section is being controlled, as described in the Step 3, is given as follows, formula (6) is used to calculate the variation velocity vigk of the roller gap of the ith stand when the target strip steel is transiting from the kth equal-thickness section to the k+1th equal-thickness section:
wherein:
The moving velocity of the strip at the outlet of the ith stand may be selected based on the following three cases:
1) when calculating the variation velocity of the roller gap of each stand for the target strip steel in a last transition section, a steel throwing velocity is selected as vi;
2) when calculating the variation velocity of the roller gap of each stand for the target strip steel in other transition sections, a threading velocity is selected as vi;
3) in other cases, adopt an actual moving velocity of the strip steel during rolling as vi.
In the invention, a method to produce strip steel with different target thicknesses in a longitudinal direction by using a hot continuous rolling mill, the stands participating in the control are determined according to the length of the first equal-thickness section, the target thickness variation amount, the spacing between stands and the rolling stability after the end stand occludes steel; and then, the load variation amount of respective section of the strip is distributed to the stands participating in the control, and the secondary setting of the roller gap is performed, effectively avoiding the influence on the rolling stability due to imbalance of the second flow; in the specific control, the first equal-thickness section at the head part of the strip steel is not put into the thickness auto-feedback control AGC, and the equal-thickness control on the head part is guaranteed mainly depending on the model setting of the hot continuous rolling mill, while other equal-thickness sections are put into the monitoring AGC function, thus the precision of the strip steel is ensured, so that the produced strip steel with variable thickness by section in the longitudinal direction meets the user's requirements.
Next, we will further describe the invention by combining with the embodiments. It should be understood that these embodiments are merely illustrative of the invention and are not intended to limit the scope of the invention. It should also be understood that, after reading the described contents of the invention, a person skilled in the art can make any change or modification to it, and all these equivalent forms will also fall within the scope defined by the claims attached to the present application.
2. A method to produce strip steel with different target thicknesses in the longitudinal direction by using a hot continuous rolling mill; the target strip steel is roll controlled through two control strategies, an equal-thickness control and an variable-thickness control; wherein a first equal-thickness section of the target strip steel is controlled using the equal-thickness control, which adopts a load distribution method of relative depressing rate, a load which should be withstood by each stand is distributed in the principle of diminishing the load from a front stand to a rear stand along a moving direction of the strip steel; transition sections between each equal thickness section, and other equal-thickness sections adopt the variable-thickness control, when the end stand of the hot continuous rolling mill occludes steel, the variable-thickness control is implemented by following steps:
Step 1 determine stands participating in the variable-thickness control; the variable-thickness control is performed by stands in a rear section of the mill, a start stand participating in the variable-thickness control is determined based on a length of a first equal-thickness section of the strip steel, a target thickness variation amount of each equal-thickness section, a spacing between stands and a rolling stability; a specific method to determine stands participating in the variable-thickness control as described in the Step 1 is given as follows:
Select a stand meeting a condition defined by Formula (1) as the start stand I participating in the variable-thickness control:
wherein:
The stands participating in the variable-thickness control include the ith stand to the end stand, in which, the end stand is not needed to be involved in the calculation based on Formula (1), as it always participates in the variable-thickness control; from the point of view of rolling stability, the stands participating in the variable-thickness control start acting after the end stand occludes steel.
From the point of view of rolling stability, the larger the number of the stands participate in the variable-thickness control, the more stable the stands participating in the variable-thickness control will be. Thus, here all of the stands satisfying the Formula (1) are selected as the stands participate in the variable-thickness control.
As shown in
As the thickness of the first section of the strip steel is 5.2 mm, and that of the medium blank is 40 mm, the thickness at the outlet of each stand may be calculated based on the given initial load, as shown in Table 1a:
When it is calculated based on the conditions that L1=50 m, the distance between stands is 5.8 m and the number of the end stand is 7, the start stand meeting the variable thickness requirement on the length of the first thickness section is:
According to the above calculation, it is known that: when i is 2, 3, 4, 5 or 6, the requirement on the length of the first thickness can be always met. Therefore, from the point of view of rolling stability, the number of the stands participating in the variable-thickness control needs to be as large as possible, namely, I=min{2, 3, 4, 5, 6}=2. Thus, the second stand to the seventh stand participate in the variable-thickness control.
Step 2 determine a load of each stand participating in the variable-thickness control; distribute a load variation amount based on a variation amount between a load of each stand in one front equal-thickness section and a load of each stand in one rear equal-thickness section; and obtain a roller gap value of each stand corresponding to a target thickness of each equal-thickness section according to a conversion relation between a load and the roller gap; a specific method to calculate a load of each stand participating in the variable-thickness control in the kth equal-thickness section of the target strip steel as described in the Step 2 is given in Formula (2): in the process of calculation, determine the load of each of the subsequent sections based on the initial load value of the first equal-thickness section. The new load value of each section is calculated based on the load value of the adjacent previous section.
Tik=Ti(k−1)×r (2)
wherein:
wherein:
I is the start stand participating in the variable-thickness control.
On the basis of the load of each section is obtained, the roller gap value of each stand in each equal-thickness section of the target strip steel in the variable-thickness control part is calculated with the roller gap model. The roller gap value of each equal-thickness section is calculated through the formula below:
Wherein:
The loads of the stands in the equal-thickness section of the target strip steel in this embodiment are given in Table 1b:
The roller gap values of the stands in the second equal-thickness section and in the third equal-thickness section of the target strip steel obtained with the roller gap model are respectively given in Table 2 and Table 3.
Step 3 determine an action timing sequence of each stand participating in the variable-thickness control; calculate a time during which each stand participating in the variable-thickness control performs changing of the roller gap, to cause each stand acts onto a same position on the target strip steel when performing changing of the roller gap. The specific method is as shown in Formula (5).
wherein:
Wherein, the time at which the roller gap of the first stand participating in the variable-thickness control starts to change is determined by adding the delay time T after the end stand occludes steel. The delay time T is:
Wherein:
In this embodiment, the time at which the F2 starts to act is the time when the F7 stand occludes steel plus the delay:
Step 4 Calculate a variation velocity of the roller gap of each stand participating in the variable-thickness control when controlling the transition section between each equal-thickness section. formula (6) is used to calculate the variation velocity vigk of the roller gap of the ith stand when the target strip steel is transiting from the kth equal-thickness section to the k+1th equal-thickness section:
wherein:
In this embodiment, the moving velocity of the strip at the outlet of the ith stand may be selected based on the following three cases:
1) when calculating the variation velocity of the roller gap of each stand for the target strip steel in a last transition section, a steel throwing velocity is selected as vi, in this embodiment, it is 8.2 m/s;
2) when calculating the variation velocity of the roller gap of each stand for the target strip steel in other transition sections, a threading velocity is selected as vi, in this embodiment, it is 5.2 m/s;
3) in other cases, adopt an actual moving velocity of the strip steel during rolling as vi.
The depressing/lifting velocity of the roller gap of the transition section between the first equal-thickness section and the second equal-thickness section as well as that of the transition section between the second equal-thickness section and the third equal-thickness section may be calculated according to Table 2, Table 3 and Formula 6. Specific values are given in Table 4.
When the velocity value is positive, it indicates the roller gap is being lifted, while the negative value indicates it is being depressed.
The actions to control the respective stands in the first transition section are achieved in the sequence below:
1) Based on the previous calculation, the variable-thickness control stands are the F2 stand to the F7 stand. So the F2 stand is the first stand to depress the roller gap of the transition section at the head part. As the previously calculated strip steel distance between the F2 stand and the F7 stand is 49.7 m, the delay time for the F2 stand after the F7 stand occludes steel is calculated as below:
Therefore, the F2 starts to depress the roller gap at the velocity of 0.114 mm/s once by deplaying 0.06 second after the F7 stand occludes steel, and the roller gap of the F2 stand is reduced to 13.5 mm from the 14.6 mm in the first equal-thickness section.
2) According to Formula 5, it is known that the roller gap of the F3 stand should be depressed to the exact position where the depressing of the F2 stand is reached, so a delay time is required for the F3 stand relative to the F2 stand. The threading velocity herein is set to 5.2 m/s. Then, the threading velocity of each stand according to the second flow equation is as shown in Table 5 below:
Therefore, the delay time is required for the depressing of the roller gap of the F3 stand relative to the depressing of the F2 stand:
Therefore, the F3 stand starts to depress the roller gap 3.01 s after the F2 stand starts to depress the roller gap. The depressing rate is 0.104 mm/s, and the roller gap of the F3 stand is reduced to 8.9 mm from the 9.9 mm in the first section.
3) Similarly, the F4 stand starts to depress the roller gap 2.1 s after the F3 stand starts to depress the roller gap. The depressing rate is 0.104 mm/s, and the roller gap of the F4 stand is reduced to 7.1 mm from the 8.1 mm in the first section.
4) Similarly, the F5 stand starts to depress the roller gap 1.7 s after the F4 stand starts to depress the roller gap. The depressing rate is 0.094 mm/s, and the roller gap of the F5 stand is reduced to 5.9 mm from the 6.8 mm in the first section.
5) Similarly, the F6 stand starts to depress the roller gap 1.4 s after the F5 stand starts to depress the roller gap. The depressing rate is 0.083 mm/s, and the roller gap of the F4 stand is reduced to 4.6 mm from the 5.4 mm in the first section.
6) Similarly, the F7 stand starts to depress the roller gap 1.2 s after the F6 stand starts to depress the roller gap. The depressing rate is 0.094 mm/s, and the roller gap of the F4 stand is reduced to 4.6 mm from the 5.5 mm in the first section.
7) When the roller gap of the F7 stand is reduced to 4.6 mm, the thick monitoring auto feedback control function AGC is put into operation. At this time, the monitoring AGC performs the monitoring feedback control according to the target thickness 4.6 mm of the second equal-thickness section.
8) When the strip steel is rolled to be L1+L2+L3−l2=50+50+400−49.7=450.3 m, starting from the F2 stand, the roller gap will be lifted from the target roller gap of the second equal-thickness section to the target roller gap of the third equal-thickness section according to the lifting velocity of the roller gap at the end part as given in Table 4.
9) The F3 should start to lift the roller gap after the F2 stands lifts the roller gap by a delay time. As the velocity has nearly reached the threading velocity, the delay time for each stand should be calculated approximately using the threading velocity. The calculated threading velocity of each stand according to the threading velocity of 8.2 m/s is given in Table 6 below:
The delay time is required for the F3 stand to start to lift the roller gap with respect to the F2 stand:
Therefore, the F3 stand lifts the target roller gap in the second equal-thickness section to the target roller gap in the third equal-thickness section at the lifting velocity for the roller gap of the F3 stand given in Table 4 by delaying 2.27 s after the F2 stand lifts the roller gap at the end part.
10) Similarly, the F4 stand lifts the target roller gap in the second equal-thickness section to the target roller gap in the third equal-thickness section at the lifting velocity for the roller gap of the F4 stand given in Table 4 by delaying 1.47 s after the F3 stand lifts the roller gap.
11) Similarly, the F5 stand lifts the target roller gap in the second equal-thickness section to the target roller gap in the third equal-thickness section at the lifting velocity for the roller gap of the F5 stand given in Table 4 by delaying 1.14 s after the F4 stand lifts the roller gap.
12) Similarly, the F6 stand lifts the target roller gap in the second equal-thickness section to the target roller gap in the third equal-thickness section at the lifting velocity for the roller gap of the F6 stand given in Table 4 by delaying 0.91 s after the F5 stand lifts the roller gap.
13) Similarly, the F7 stand lifts the target roller gap in the second equal-thickness section to the target roller gap in the third equal-thickness section at the lifting velocity for the roller gap of the F7 stand given in Table 4 by delaying 0.79 s after the F6 stand lifts the roller gap.
14) After the F7 stand completes the lifting of the roller gap of the L4 variable-thickness section, the strip steel thickness control performs the control of L5 (the third equal-thickness section). At this time, the monitoring thickness auto feedback control AGC is put into operation, thus the control on the strip with variable thickness in its full length is competed.
The actual performance diagram of the full-length thickness control for the strip steel, the tested and produced strip steel with different target thicknesses in the longitudinal direction after the production control on the strip steel with different target thicknesses in the longitudinal direction is completed is as shown in
Number | Date | Country | Kind |
---|---|---|---|
2012 1 0426936 | Oct 2012 | CN | national |
Filing Document | Filing Date | Country | Kind |
---|---|---|---|
PCT/CN2012/001602 | 11/30/2012 | WO | 00 |
Publishing Document | Publishing Date | Country | Kind |
---|---|---|---|
WO2014/067037 | 5/8/2014 | WO | A |
Number | Name | Date | Kind |
---|---|---|---|
3762195 | Kitanosono et al. | Oct 1973 | A |
Number | Date | Country |
---|---|---|
1333093 | Jan 2002 | CN |
1850375 | Oct 2006 | CN |
101633003 | Jan 2010 | CN |
2001321813 | Nov 2001 | JP |
Number | Date | Country | |
---|---|---|---|
20150298186 A1 | Oct 2015 | US |