Claims
- 1. A method for producing molten metal castings of cast iron after a stoppage in production, comprising the steps of:
- i) providing a conditioning furnace, having an inlet channel and an outlet channel, with pre-treated molten iron; and
- ii) after the stoppage in the production of castings, forcing molten iron from the outlet channel into the furnace by reducing a height of the molten iron in the outlet channel to a level lower than a height of the molten iron in the furnace, revitalizing said molten iron with at least one of a nucleation agent and a structure modifying agent to a desired content by adding said agent into the furnace before restartng the production of castings;
- iii) casting the revitalized molten iron.
- 2. A method according to claim 1 wherein the conditioning furnace is essentially closed.
- 3. A method according to claim 1 wherein the structure modifying agent is magnesium.
- 4. A method according to claim 1 wherein vacuum is applied to the conditioning furnace for lowering the level of molten iron in the outlet channel in step ii).
- 5. A method according to claim 1 wherein overpressure is applied above the molten iron in the outlet channel for lowering the level of molten metal in the outlet channel in step ii).
- 6. A method according to claim 1 wherein electromagnetic forces are applied to the molten iron in the outlet channel for lowering the level of molten iron in the outlet channel in step ii).
- 7. A method according to claim 1 wherein the cast iron is one of a ductile iron and a compacted graphite iron.
- 8. A method according to claim 1 wherein at the inside of the conditioning furnace an opening to the outlet channel is positioned higher than an opening of the inlet channel to act as a fluid lock at a low metal level when a vacuum is used to force molten iron from the outlet channel into the furnace.
- 9. A method according to claim 1 wherein step ii) is performed only during the last 30 seconds before restarting casting.
- 10. A method according to claim 9 wherein step ii) is performed repeatedly from 2 to 5 times before restart of the production of castings.
- 11. A method according to claim 10 wherein the revitalizing in step ii) is performed solely by re-mixing the molten iron in the outlet with the molten iron in the furnace.
Priority Claims (1)
Number |
Date |
Country |
Kind |
9504096 |
Nov 1995 |
SEX |
|
Parent Case Info
This application is the national phase of international application PCT/SE96/01446, filed Nov. 11, 1996 which designated the U.S.
PCT Information
Filing Document |
Filing Date |
Country |
Kind |
102e Date |
371c Date |
PCT/SE96/01446 |
11/11/1996 |
|
|
5/15/1998 |
5/15/1998 |
Publishing Document |
Publishing Date |
Country |
Kind |
WO97/18337 |
5/22/1997 |
|
|
US Referenced Citations (4)
Number |
Name |
Date |
Kind |
3764305 |
Andersson |
Oct 1973 |
|
4390362 |
Khusnutdinov et al. |
Jun 1983 |
|
5161604 |
Chandley et al. |
Nov 1992 |
|
5758706 |
Backerud et al. |
Jun 1998 |
|
Foreign Referenced Citations (3)
Number |
Date |
Country |
313323 |
Aug 1969 |
SEX |
328673 |
Sep 1970 |
SEX |
9518869 |
Jul 1995 |
WOX |