1. Field of the Invention
The present invention relates to methods for protecting a submarine long object including a submarine cable and a submarine long tube.
2. Description of the Background Art
For example, electrical power generated by an offshore wind power generation system is transmitted via a cable connected between the offshore wind power generation system and a land-based ground system. More specifically, a cable is provided so as to extend along the seabed between the wind power generation system and the ground system. Protection of such a cable extending along the seabed (hereinafter referred to as the “submarine cable”) is disclosed in, e.g., Japanese Patent Publication No. 2007-288991 of unexamined applications. In Japanese Patent Publication No. 2007-288991 of unexamined applications, mattress blocks are used to protect the submarine cable. In each mattress block, an upper cell and a lower cell are integrally formed, the upper cell is formed so as to protrude in a lattice shape from the lower cell, and a stepped portion is formed in the lower cell. A plurality of such mattress blocks are connected together and placed over the submarine cable. Thus, the submarine cable is protected from being struck and caught by anchors of ships and various fishing gear.
As described above, the submarine cable is protected by the plurality of mattresses connected together and placed over the submarine cable. However, in Japanese Patent Publication No. 2007-288991 of unexamined applications, the mattresses placed over the submarine cable serve as resistance to the tidal currents on the seabed, whereby an excess flow is generated near the ends of the mattress blocks. Such an excess flow can cause a phenomenon called “scouring,” a phenomenon that the seabed near the ends of the mattress blocks is worn away and chipped off. In this case, the plurality of mattresses connected together cannot finely follow the shape of the seabed that is gradually deformed by scouring. The distance between a joint at one end of a mattress block and a joint at the other end of the mattress is the minimum width by which the connected mattress blocks can bend. Thus, the connected mattress blocks are structurally less likely to closely contact the submarine cable and the seabed. Based on this, the connected mattress blocks may be able to follow the shape of the seabed that has been deformed to some degree by scouring. However, even in that case, scouring cannot be prevented, whereby the shape of the seabed is further deformed progressively, imposing a considerable strain on the submarine cable. As a result, the submarine cable can be damaged. In addition, this kind of problem can occur to the other submarine long objects such as pipelines for the gas, the oil and the optical fiber and so on.
It is an object of the present invention to provide a method for protecting a submarine long objects such as a submarine cable and a submarine long tube which is capable of protecting the submarine objects for a long time.
According to the present invention, a method for protecting a submarine long object includes the step of installing a bag-shaped filter units, each containing predetermined block objects, so as to cover a submarine long object.
Preferably, the step of installing the filter units includes the step of locating a position where the filter units are to be installed, by using a GPS.
According to the present invention, the bag-shaped filter units, each containing predetermined block objects, are installed so as to cover a submarine cable and long tube installed on the seabed. Thus, the submarine cable and long tube can be fixed, and also, scouring can be prevented, whereby the submarine cable and long tube can be protected for a long time.
An embodiment of the present invention will be described below with reference to the accompanying drawings.
The structure of the FU 50 used in the present embodiment will be described below.
Referring to
In the bag body 501, the longer side N of the mesh of the net is 50 mm, and the yarn diameter M is 10 mm. It is preferable that the yarn diameter M and the longer side N of the mesh have a relation of 3≦N/M≦20 (unit to be mm). Under this relation, none of the block objects 502 described below drop out of the mesh and the bag body 501 keeps its strength longer.
It is preferable that the predetermined amount of the block objects 502 be determined so that the porosity of the knitted fabric becomes 45% to 90%. This ensures formation of porous voids in the FU 50, thereby reducing the dragging force while the water currents at the seabed 200 are flowing through the bag body 501. Thus, no flowing water pressure is applied to the FU 50, preventing a phenomenon called “scouring,” a phenomenon that the seabed 200 is worn away. Although the porosity relates also to the size of the block objects 502 placed in the bag body 501, at the porosity of less than 45%, the flowing water pressure is applied to the FU 50, causing scouring around the bag body 501. On the other hand, at the porosity of more than 90%, the retention of the block objects 502 is reduced.
It is preferable that the bag body 501 be formed by knitted fabric (e.g., a raschel net) having an elongation of 30% to 80%. This enables the flexibility to be ensured, and also enables the bag body 501 to follow any shape at an installation position of the FU 50, and to be maintained in a stable state for a long time after installation of the FU 50. That is, the FU 50 can be stably maintained at the installation position for a long time, regardless of whether the installation location is flat or not.
The block objects 502 contained in the FU 50 preferably has its diameter to be 50-300 mm and specific gravity large enough to prevent the FU 50 from being dragged when the FU 50 is installed on the seabed 200. For example, the block objects 502 are crushed stones having a grain size of 100 mm and specific gravity of 2.65. Thus, the FU 50 has a weight heavy enough to be unsusceptible to buoyancy and water currents under the sea. Note that, the smaller the grain size of the block objects 502 is, the more the bag body 501 adapts to the shape of the installation location. It is preferable that the grain size of the block objects 502 be approximately about two times the longer side N of the mesh.
Next, the predetermined amount of block objects 502 to be placed in the bag is to be explained. With reference to
In addition, since the FU has a structure described above, when it is located in the seabed, the meritorious effect is brought about that preferable environment can be provided for plants and fish in the sea.
Next, the explanation is made as to the size of the FU. In the following explanation, the FU whose weight is less than 4 t, the diameter when it is set is less than 2 m, and the volume is less than 2 m3 is referred to as “a small FU”, whereas the FU whose weight is 4-20 ton, the diameter when it is set is 2 m-5 m, and the volume is 2-13 m3 is referred to as “a large FU”. The material and the diameter of the yarn, the mesh size including the longer side of the mesh, the diameter and specific weight of the block objects are same for both the small and the large FUs.
The Table 1 below shows an example of the relation between the weight (size) of the individual FU and an effective flow rate of the tidal currents. Note that it is assumed in Table 1 that the same block objects whose diameter is 50-300 mm and specific weight is 2.65 are placed in each FU.
As shown in Table 1, an appropriate type of FUs may be used according to the flow rate of tidal currents. For example, FUs having a weight of 4 t are used when the flow rate of the tidal currents is 5.0 m/s at the position where the FUs are to be installed. In addition, it is possible to change the weight of the FU and the size of block objects depending on the conditions of the performance at the position where FUs are set. As shown in Table 1, the larger the FU, the more effective to the flow rate of the tidal current, compared with the smaller FU.
In the following description, the FU 50 described above is used unless otherwise specified.
Note that, although the factors, such as the size of the FU 50 itself, the material of the yarn, the thickness of the yarn, the grain size and the specific weight of the block objects are specified in the above FU 50, the present invention is not limited to the FU 50 specified by these factors. The FU 50 may be specified by various other factors.
Note that, for example, it is preferable that the FU used here is a scouring preventing material for an underwater structure disclosed in Japanese Patent No. 3,696,389.
A method for installing the FUs according to the present embodiment will be described below.
The larger the overall thickness of the FUs 50, that is, the number of layers of the FUs 50 in the vertical direction, is, the higher effects the FUs 50 are expected to have. This is because increasing the overall thickness of the FUs 50 improves engagement between the plurality of FUs 50. Thus, the plurality of FUs 50 closely contact each other, are fixed together with no gap formed therebetween and decrease possibility of earth and sand being sucked out from the seabed surface. This increases the stability of the plurality of installed FUs 50, enabling the influence of the tidal currents including scouring to be reduced for a long time. On the other hand, the effect of preventing scouring substantially levels off when the overall thickness is equal to three or more layers. Thus, as described above, from the standpoint of construction such as the number of FUs 50 to be installed and the amount of construction work, and the standpoint of the effects such as the effectiveness of the FUs 50, it is preferable that the overall thickness of the FUs 50 be equal to two to three layers.
In addition, usually, one sized FUs are used to implement this embodiment, FUs whose sizes are different can be used. In this case, when FUs of different sizes are installed in two or more layers, it is preferable that the smaller FUs are set at the lower position and the larger FUs are at higher position. The reason for this installation is that the smaller FUs follow unevenness of the seabed, engagement between the installed FUs and the seabed. As a result, FUs 50 maintain in a stable state for a long time after installation. Further, since the top surface of set smaller FUs is smoother than that of the seabed, the large FUs are stably located on the small FUs. Thus, flow rate of the tidal current can be effectively reduced.
Further, installing the FUs 50 around the seabed 200 having the piles 12b driven therein increases the lateral pressure applied to the underground part of each pile 12b from the surrounding ground. Thus, a gap is less likely to be formed between each pile 12b, and the ground and the bearing layer which surround the underground part of the pile 12b. This can suppress a moment that is generated near the seabed 200 in each pile 12b. Further, since a plurality of FUs installed serves as a part of the foundation, the size of the foundation can be compact.
As described above, since the plurality of FUs 50 are installed between the seabed 200 and each pile 12b, a gap is less likely to be formed between each pile 12b, and the ground and the bearing layer which surround the underground part of the pile 12b. This can suppress a moment that is generated near the seabed 200 in the pile 12b, and can prevent scouring that occurs around each pile 12b. As a result, the bearing force and the durability of the foundation having the piles 12b as a base can be improved.
A method for constructing a foundation for a wind power generation system according to the present embodiment will be described below.
According to the above method, the piles 12b are provided so as to be supported by the bearing layer, the plurality of FUs 50 are installed between the seabed 200 and each pile 12b, and the base slab portion 12a is provided on the upper ends of the piles 12b. This prevents scouring from occurring for a long time, since influence of the tidal current is decreased around the foundation on the sea bed and protect the seabed 200 near the piles 12b. In addition, this increases the lateral pressure that is applied to the underground part of each pile 12b from the surrounding ground. Thus, a gap is less likely to be formed between each pile 12b. As a result, both the bearing force and the durability of the foundation are increased. Further, since a plurality of FUs installed serves as a part of the foundation, the size of the foundation can be compact In addition, since the net yarn of the FUs is made of synthetic fiber and FUs are porous, endocrine disrupter and heavy metal will not solve out and it is possible to provide biotope for seaweeds and fish. Further, the foundation can be made compact, since the FUs work as a par of foundation.
Next, the alternate embodiment is described. In this embodiment, as shown
In this alternate embodiment, similar to the above described embodiment, it is possible to prevent scouring from occurring for a long time, since influence of the tidal current is decreased around the foundation on the sea bed 200 and to protect the seabed 200 near the piles 12b. In addition, since the lateral pressure is increased that is applied to the underground part of each pile 12b from the surrounding ground, a gap is less likely to be formed between each pile 12b.
Next, further alternate embodiment is described. In this embodiment the FUs are installed in a foundation of an existing wind power generation system.
In this alternate embodiment, the same meritorious effect is brought about as described above.
In the first embodiment, an example is described in which one type of FUs are installed. However, the present invention is not limited to this, and two kinds of FUs, one is a large FU and the other is a small FU, may be used. In this case, large FUs and small FUs are installed overlapped. In addition, when FUs are installed in three layers, at first small FUs are installed in one layer at the bottom, and then, two layers of large FUs are installed on the small FUs as described above. Thus, in addition to the effect described in
A plurality of FUs may be installed in which different kinds of block objects are placed. For example, at first a first FUs including block objects having small size, and then a second FUs including block objects having large size. Thus, the first FUs prevents earth and sand from being sucked out from the seabed surface, follow the unevenness of the seabed. Further, engagement between the plurality of FUs 50 are improved and FUs remain stably for a long time due to the fact that the plurality of FUs 50 closely contact each other and are fixed together with no gap formed therebetween. In addition, since the second FUs having large sized block objects faces the tidal current, FUs are located stably and decrease current speed of the tidal current effectively.
In addition, since “the size of FUs” has nothing to do with “the grain size of the block object filled in the FUs”, a synergetic effect is brought about by the large FUs including block objects having large size compared with the effect brought about by large FUs including small sized block objects, and small FUs including large sized block objects. For example, the large FUs including large sized block objects more stably maintain themselves than the small FUs including large sized block objects and the large FUs including small sized block objects.
Note that the above embodiment is described with respect to an example in which the base slab portion 12a is formed by providing the formwork 12e for the base slab portion 12a on the upper ends of the piles 12b, and placing concrete into the formwork 12e. However, the present invention is not limited to this, and a concrete base slab portion 12a, which has been fabricated in advance, may be provided on the upper ends of the piles 12b.
In addition, although the steel pile is used in this embodiment, the concrete pile may be used.
The second embodiment will be described below. In the second embodiment, a wind power generation system is supported by a foundation having a caisson as a base.
A method for constructing a foundation for a wind power generation system according to the second embodiment will be described below.
Then, the formwork 12d for forming the caisson 12c is installed on the FUs 50 installed on the bottom surface of the hole 13 (
According to the above method, the seabed 200 is first excavated so that the caisson 12c can be supported therein. Then, the plurality of FUs 50 are installed flat on the bottom surface of the drilled hole 13. The formwork 12d for the caisson 12c is installed, and the plurality of FUs 50 are installed between the seabed 200 and the formwork 12d for the caisson 12c. Concrete is then placed into the formwork 12d to form the caisson 12c, and the base slab portion 12a is provided on the upper end of the caisson 12c. Since influence of the tidal current is decreased near the foundation on the seabed 200, scouring can be suppressed for a long time and the seabed 200 near the caisson 12c can be protected. As a result, the bearing force and the durability of the foundation can be improved. Further, since installed FUs serve as a part of the foundation, the foundation can be compact. In addition, since the net yarn of the FUs is made of synthetic fiber and FUs are porous, endocrine disrupter and heavy metal will not solve out and it is possible to provide biotope for seaweeds and fish.
Next, an alternate embodiment is described. In this embodiment the FUs are installed in a foundation using the caisson of an existing wind power generation system.
In this alternate embodiment, the same meritorious effect is brought about as described above.
Note that the above embodiment is described with respect to an example in which the caisson 12c is formed by placing concrete, and then, the formwork for forming the base slab portion is installed thereon. However, the present invention may use a formwork capable of forming both the caisson and the base slab portion by placing concrete therein.
Note that the above embodiment is described with respect to an example in which the caisson 12c is formed by installing the formwork 12d onto the FUs installed on the bottom surface of the drilled hole 13, and placing concrete into the installed formwork 12d. However, the caisson 12c, which has been fabricated in advance, may be installed onto the FUs 50 installed on the bottom surface of the drilled hole 13.
Note that the above embodiment is described with respect to an example in which one type of FUs are installed. However, the present invention is not limited to this, and two kinds of FUs, one is a large FU and the other is a small FU, may be used. For example, in the case where it is necessary to follow unevenness of the seabed, small FUs are preferably used. On the other hand, when it is necessary to prevent reduce speed of the tidal current, large FUs are used. In addition, a plurality of FUs including different kinds of block objects depending on the conditions required. Thus, the similar effect is brought about as described in the first embodiment.
The third embodiment will be described below with respect to an installation method of the FUs. A method for protecting a submarine cable for a wind power generation system will be described in the present embodiment.
First, at a location where the submarine cable 20 is to be installed, the condition of the seabed 200 and the condition of the tidal currents near the seabed 200 are investigated in advance to examine the size and the number of FUs 50 and the position where the FUs 50 are to be installed (
At this time, with reference to
Since the submarine cable is fully covered by the FU stably, the submarine cable 20 is fixed so as not to move by the influence of the tidal currents around it (see
According to the above method, the FUs 50 are installed so as to cover the submarine cable 20. Thus, the submarine cable 20 is fixed by the seabed 200 and the FUs 50, and can be prevented from moving by the influence of the tidal currents around it and the like. This can prevent generation of friction between the seabed 200 and the submarine cable 20, and can prevent scouring near the installed submarine cable 20 for a long time. As a result, the submarine cable 20 can be protected for a long time.
Note that the above embodiment is described with respect to an example in which a submarine cable is newly installed. However, the FU 50 may be installed so as to cover an existing submarine cable.
Note that the above embodiment is described with respect to an example in which one FU 50 is installed. However, it is more preferable to install a plurality of FUs 50. The use of the plurality of FUs 50 increases the weight for fixing the submarine cable 20, enabling the submarine cable 20 to be fixed firmly. In addition, as described in the first embodiment, the group effect is obtained and the cable can be fixed stably by installing a plurality of FUs.
Next, some of examples in which the submarine cable 20 is fixed by a plurality of FUs 50 will be described below.
Note that, in the above embodiment, even if scouring occurs around the FUs 50 provided to protect the submarine cable 20, the FUs 50 follow the deformed seabed 200, and thus, repairs can be made by, e.g., merely providing the FUs 50 over the recessed portion of the seabed 200 by the amount corresponding to the amount of the recess. Thus, repairs can be easily made at low cost.
Note that it is preferable that the method for protecting a submarine cable for a wind power generation system according to the above embodiment be applied to the case where the water depth to the seabed 200 is about 3 m or more.
Note that the above embodiment is described with respect to an example in which a submarine cable is protected by covering the cable with FUs. At this point, the submarine cable includes ones of telephone lines, the optical fibers and so on. This method can be applied to the cases where the submarine long objects such as long tubes and pipelines for the gas, the oil and so on.
Next, the fourth embodiment will be described below with respect to the installation method of the FUs. In the fourth embodiment, a method for planarizing an uneven surface of the seabed will be described in this embodiment. Basically, one sized FUs are used to planarize uneven surfaces. In the following an embodiment is described wherein two kinds of FUs whose sizes are different.
First, the condition of an uneven surface 1000 of the seabed 200 is investigated in advance to examine the respective numbers of large FUs 51 and small FUs 52 to be used, and the position where the large FUs 51 and the small FUs 52 are to be installed (
It is preferable to install the FUs in ascending order of weight. In this case, the large FUs 51 are installed on the upper surface formed by the small FUs 52. Thus, the small FUs follow the bottom of the uneven surface 1000 and it is possible to make the upper surface of the small FUs flat. In addition, by the large FUs installed on the flat small FUs, the whole FUs can be stable.
In this embodiment, since the small FUs are installed on the bottom surface of the uneven surface 1000, the large FUs are installed on the small FUs and the top surface of the installed large FUs are leveled so that the upper surface formed by the small FUs 52 becomes flush with the seabed 200. Thus, the large FUs 51 and the small FUs 52 engage with each other, whereby a highly integrated, substantially flat seabed 200 having no gap between the FUs can be formed. As a result, the uneven surface can be turned into a substantially flat, firm seabed.
Note that the above embodiment is described with respect to an example in which the concave uneven surface is leveled. However, the present invention is not limited to this, and this method can be applied to an example in which the convex uneven surface is leveled.
Note that the above embodiment is described with respect to an example in which two types of FUs, which are the large FUs 51 and the small FUs 52. However, the present invention is not limited to this, and only one type of FUs may be used. That is, the uneven surface 1000 may be planarized by leveling one type of FUs so that the upper surface formed by the FUs becomes flush with the seabed 200. A plurality of types of FUs, containing different types of block objects from each other, may be used to planarize the uneven surface 1000. For example, FUs containing block objects having 100 mm diameter and FUs containing block objects having 200 mm diameter are used. In this case, FUs containing block objects having small diameter prevents earth and sand from being sucked out from the seabed surface and follow the unevenness of the seabed. Further, two kinds of FUs having different sized block objects, engage with each other, and can be integrated with no gap therebetween. It is preferable to install the FUs in ascending order of the grain size of the block objects. In this case, since the FUs with small grain size follow the shape of uneven surfaces 1000 and it is possible to form a flat surface on the upper surface of the small FUs and the whole FUs are stably installed since the large FUs are installed on the flat surface of the small FUs.
The method for planarizing the uneven surface of the seabed according to the above embodiment may be applied together with, e.g., a barge vessel for dumping crushed stones. In this case, the uneven surface 1000 of the seabed 200 may be planarized as follow. First, crushed stones are dumped from the barge vessel to the bottom of the recess of the uneven surface. After a desired amount of crushed stones is dumped, the large FUs 51 and the small FUs 51, for example, are installed as described in the above embodiment by using the method for planarizing the uneven surface of the seabed. This enables the uneven surface to be efficiently planarized at low cost.
Note that the above embodiment is described with respect to an example in which the uneven surface 1000 is planarized. After the uneven surface is planarized, a submarine cable for a wind power generation system may be installed so as to extend on the planarized uneven surface, or an underwater structure may be installed on the planarized uneven surface. As described in the above embodiment, the submarine cable may be fixed and protected by using the FUs.
Note that, in the above described first to fourth embodiments, the position where the FUs 50 are to be installed may be located by a global positioning system (GPS). For example, a work ship for installing the FUs 50 on the seabed 200, and a tow body for submerging to investigate the condition under the sea according to signals received from the work ship are applied to the above embodiment. The tow body includes: a bathymetric sonar for radiating sound waves in a fan-shaped radiation pattern to the seabed, and receiving reflected waves from the seabed to measure the depth to the seabed; an oscillation sensor for measuring and correcting the tilt of the bathymetric sonar associated with oscillation of the tow body; a water pressure sensor for measuring an accurate water pressure to keep track of a change in water depth of the tow body; and a transponder for calculating the distance to the work ship and the azimuth of the tow body. The work ship includes: an operation apparatus for operating the tow body; a GPS positioning apparatus for keeping track of the position of the work ship; and a GPS azimuth sensor for keeping track of the azimuth of the work ship; an undersea positioning system for receiving sound waves from the transponder of the tow body, and measuring the position of the tow body; dedicated software for analyzing data obtained from the tow body, based on the respective positions of the tow body and the work ship; and a tow winch connected to the tow body and the cable, for controlling movement of the tow body. First, the operation apparatus in the work ship is operated to submerge the tow body under the sea. The submerged tow body obtains data regarding the condition of the seabed by using the bathymetric sonar, while transmitting its own position and condition to the work ship by the oscillation sensor, the water pressure sensor, and the transponder. The obtained data regarding the seabed is transmitted to the work ship to keep track of the condition of the seabed by the dedicated software of the work ship. The position where the FUs are to be installed is located by the obtained data from the tow body, the GPS positioning apparatus, and the GPS azimuth sensor. This enables the FUs are to be accurately installed at a desired position. For example, the position where the FUs are to be installed may be located and recorded by the GPS positioning apparatus in the investigation that is conducted in advance, and the FUs may be installed based on the recorded data.
Note that, in the above described first to fourth embodiments, the FUs 50 may be installed by suspending each FU 50 by a crane or the like. In this case, the FUs 50 may be installed by automatically releasing the connection portion 504 of each FU 50 from the crane when the FU 50 is moved to a predetermined installation position. This reduces, e.g., labor and danger of divers who give instructions and assist in working on the seabed, in the operation of releasing each FU 50 from the crane.
Note that, in the above described first to fourth embodiments, the plurality of installed FUs may be connected by connection members such as a rope, a chain, or the like. This enables the stability between the plurality of FUs 50 to be maintained for a long time, whereby the bearing force and durability of the foundation can further be improved.
Note that, in the above described first to fourth embodiments, the FUs 50 may be installed one by one, or more than one FUs 50 may be installed simultaneously.
Although the embodiments of the present invention have been described with reference to the drawings, the present invention is not limited to the illustrated embodiments. Various modifications and variations can be made to the illustrated embodiments within a scope that is the same as, or equivalent to, the present invention.
Number | Date | Country | Kind |
---|---|---|---|
09180850.1 | Dec 2009 | EP | regional |