| A. V. Hill and D. C. Whybark, "Chexpedite: A Computer-Based Approach to the Bank Courier Problem," Decision Sciences, vol. 13, No. 2, Apr. 1982, pp. 251-265. |
| M. S. Fox and S. F. Smith, "ISIS--a knowledge-based system for factory scheduling," Expert Systems, vol. 1, No. 1, 1984, pp. 25-49. |
| A. V. Hill and D. C. Whybark, "Comparing Exact Solution Procedures for the Multi-Vehicle Routing Problem," The Logistics and Transportation Review, vol. 12, No. 3, 1976, pp. 145-153. |
| T. Dean and M. Boddy, "An Analysis of Time-Dependent Planning," in Proceedings of the Seventh National Conference on Artificial Intelligence, A.A.A.I., 1988, pp. 49-54. |
| H. Berliner and G. Goetsch, "A Study of Search Methods: The Effect of Constraint Satisfaction and Adventurousness," in Proceedings of the Ninth International Joint Conference on Artificial Intelligence, vol. 2, Aug. 18-23, 1985, pp. 1079-1082. |
| A. V. Hill, J. D. Naumann, and N. L. Chervany, "SCAT and SPAT: Large-Scale Computer-Based Optimization Systems for the Personnel Assignment Problem", Decision Sciences, vol. 14, No. 2, Apr. 1983, pp. 207-220. |
| B. Kalantari, A. V. Hill, and S. R. Arora, "An algorithm for the traveling salesman problem with pickup and delivery customers," European Journal of Operational Research, vol. 22, No. 3, Dec. 1985, pp. 377-386. |
| A. V. Hill, "An Experimental Comparison of Dispatching Rules for Field Service Support," Decision Sciences, vol. 23, No. 1, Winter 1992, pp. 235-249. |
| D. Whitley, T. Starkweather, and D. Shaner, "The Traveling Salesman and Sequence Scheduling: Quality Solutions Using Genetic Edge Recombination," Handbook of Genetic Algorithms, Chapter 22, 1991, pp. 350-372. |
| M. Zweben, M. Deale, and R. Gargan, "Anytime Rescheduling," in Proceedings of a Workshop on Innovative Approaches to Planning, Scheduling and Control, San Diego, California, Nov. 5-8, 1990, pp. 251-259. |
| A. V. Hill, V. A. Mabert, and D. W. Montgomery, "A Decision Support System for the Courier Vehicle Scheduling Problem," OMEGA Int. J. of Mgmt Sci., vol. 16, No. 4, 1988, pp. 333-345. |
| H. Prade, "Using Fuzzy Set Theory in a Scheduling Problem: A Case Study," Fuzzy Sets and Systems, vol. 2, No. 2, 1979, pp. 153-165. |
| M. S. Fox, N. Sadeh and C. Baykan, "Constrained Heuristic Search," in Proceedings of the Eleventh International Joint Conference on Artificial Intelligence (IJCAI), Detroit, Michigan, vol. 1, Aug. 20-25, 1989, pp. 309-315. |
| W. Chiang and M. S. Fox, "Protection Against Uncertainty in a Deterministic Schedule," in Proceedings of the Fourth International Conference on Expert Systems in Production and Operations Management, Hilton Head, South Carolina, May 1990, pp. 184-196. |
| M. Zweben, "Constraint-Based Simulated Annealing: An Iterative Improvement Framework for Constraint Satisfaction Search," NASA Ames Research Center, Moffett Field, California, Aug. 9, 1990, pp. 1-13. |
| R. Hublou, "Manufacturing Operations Scheduling," Business Intelligence Program Report D90-1436, SRI International, May 1990, pp. 1-39. |
| A. V. Hill, "An Experimental Comparison of Human Schedulers and Heuristic Algorithms for the Traveling Salesman Problem," Journal of Operations Management, vol. 2, No. 4, Aug. 1982, pp. 215-223. |
| P. Prosser, "A Reactive Scheduling Agent," in Proceedings of the Eleventh International Joint Conference on Artificial Intelligence, Detroit, Michigan, Aug. 20-25, 1989, pp. 1004-1009. |
| E. Ghalichi and J. Collins, "The Dispatch Advisor," in Proceedings of the Workshop on Artificial Intelligence for Customer Service and Support, Eighth IEEE Conference on Artificial Intelligence Applications, Monterey, California, Mar. 3, 1992, pp. 60-68. |
| J. E. Collins and E. M. Sisley, "AI in Field Service: The Dispatch Advisor," in Working Notes, AI in Service and Support: Bridging the Gap Between Research and Applications, Eleventh National Conference on Artificial Intelligence, Washington, D.C., Jul. 11-15, 1993, pp. 26-37. |
| J. Tsitsiklis, "Special Cases of Traveling Salesman and Repairman Problems with Time Windows," Report LIDS-P-1987, Massachusetts Institute of Technology, Jun. 1990, pp. 1-23. |
| S. F. Smith, "The OPIS Framework for Modeling Manufacturing Systems," Tech Report CMU-RI-TR-89-30, Carnegie-Mellon University, Dec. 1989, pp. 1-56. |
| D. L. Haugen, "A Study of Scheduling and Quality of Field-Service Support Systems," Ph.D. Thesis, University of Minnesota, Nov. 1993, pp. 1-251. |