The following documents are incorporated herein by reference as if fully set forth: German Patent Application No. DE 10 2019 107 165.8, filed Mar. 20, 2019.
The present invention relates to a method for retrofitting a building using a lift system having a prefabricated shaft, and a component kit for performing the method.
The prefabricated shaft extends over at least two stories and comprises a self-supporting sheet metal box, which is provided for receiving a cabin of the lift system together with its guides and drive devices, which may also contain a counterweight. The at least one steel plate that forms the self-supporting sheet metal box runs in a straight line in a longitudinal direction of the shaft, which corresponds to the direction of movement of the cabin, while it is profiled in a cross-sectional plane that is orthogonal to the longitudinal direction of the shaft. Such a prefabricated shaft is known from EP 3 315 448 A2.
Traditionally, lift shafts consist of a concrete or steel structure that is erected on site at the construction site. After the lift shaft has been erected, the assembly of the actual lift system is generally carried out on site by installing a cabin, its suspension and drive, and all the components required for operation. This results in a total construction time of several weeks. This is particularly disadvantageous when the lift system is used to retrofit an existing and used building; that is because access to the building is difficult during the construction phase.
A solution to this problem has already been disclosed in BE 568 738. It was proposed therein to manufacture the shaft of the lift system from a plurality of thin-walled steel plates which abut one another at the corners of the generally rectangular shaft and are connected to one another and stabilized there by means of profiles, angle irons and the like. This made it possible to prefabricate the shaft as a sheet metal box and even to install the cabin, its guides and drive devices in the shaft in the factory and only then to transport it to the construction site. The assembly time of the lift system could be greatly reduced due to the high degree of prefabrication.
In order to improve the stability of a lift system having such a prefabricated shaft, EP 3 315 448 A2, already mentioned, proposes to fabricate the sheet metal box with which the shaft is manufactured from at least one steel plate which runs in a straight line in the longitudinal direction of the shaft, while being profiled in the cross-sectional plane; the at least one steel plate is preferably formed in one piece in the longitudinal direction over the entire extent of the shaft. This self-supporting and stable design of the sheet metal box makes it possible, on the one hand, to transport the prefabricated shaft from the factory to the construction site by means of a lorry; on the other hand, due to its inherent stability, the lift system manufactured with the self-supporting sheet metal box can be placed on an existing building without being supported on the building, so that the statics of the building remain unaffected and there is no need to recalculate said statistics.
Lift systems for attaching to a building or for retrofitting a building are generally used in older buildings, in which no barrier-free access has yet been considered. In particular, residential buildings having a plurality of residential units, which are distributed over several stories, but also administrative buildings and commercial buildings, often have a plurality of stories, which are in particular divided into a plurality of residential units or other closed units and have corresponding story doors. These story doors are usually accessible via a common staircase. A common construction of such multi-story houses integrates the staircase at the front side of the building with an entrance door at ground level and a double-flight of stairs that allows access to all story doors via main landings on each story and intermediate landings. These are located on the main landings in this construction.
It is obvious that people with disabilities in such buildings have little chance of getting to the story doors on their own. Even heavy objects usually have to be transported via the staircase and can therefore often not be made easier with the appropriate aids. It is therefore often desirable to retrofit such a multi-story building using a lift system. One of the lift systems described above having a prefabricated shaft is offered for this purpose.
A lift system for attaching to a building from the outside or a method for retrofitting a building with such a lift system is known from DE 196 33 636 A1. From this prior art, it can be seen that retrofitting the building in this way only partially solves the problem of unhindered access for people with walking difficulties. Due to the fact that when the retrofitted lift system is placed on the front side of the building in front of the staircase and the transitions between the shaft and the corresponding building openings in the front side of the building are made, a person who emerges from the lift cabin on the desired story can only reach an intermediate landing of the staircase, so they would still have to climb half a story up or down by means of a stair section of the double-flight of stairs in order to access the story doors.
If a corresponding building is to be modernized to be largely barrier-free by retrofitting a lift system, it has therefore not hitherto been the means of choice to use a prefabricated lift system or a prefabricated shaft of the type mentioned at the beginning. Instead, the staircase needs to be gutted and completely rebuilt using a lift system. Since access to the story doors is generally not possible during the corresponding construction period, one usually refrains from retrofitting a corresponding building using a lift system, at least from the point of view of the greatest possible accessibility.
The present invention is therefore based on the object of providing a method for retrofitting a building using a lift system and a component kit for performing this method, with which a building having a plurality of stories and a staircase adjacent to a front side of the building and, per story, has a main landing and an intermediate landing for a double-flight of stairs, can be retrofitted at least largely barrier-free with a lift system.
This object is achieved by a method and a component kit having one or more features of the invention.
Advantageous embodiments of the method according to the invention and preferred developments of the component kit according to the invention are described below ad in the claims.
The prefabricated shaft used according to the invention for a lift system to be attached to a building from the outside enables a building to be retrofitted using a lift system largely barrier-free even if the building is accessed via a staircase having intermediate landings. For this purpose, the shaft extends over at least two stories and comprises a self-supporting sheet metal box made of at least one steel plate, which is provided for receiving a cabin of the lift system together with its guides and drive devices, that is, also a counterweight if necessary. The at least one steel plate runs in a straight line in a longitudinal direction of the shaft, which corresponds to the direction of movement of the cabin, while it is profiled in a cross-sectional plane orthogonal to the longitudinal direction of the shaft. The at least one steel plate preferably extends in one piece in the longitudinal direction of the shaft over the entire extent thereof, while two or more steel plates are joined to one another in the circumferential direction, as is known per se. According to the invention, the sheet metal box of the shaft has a cross section that goes beyond the mere enclosure of the cabin and the other components: the sheet metal box is profiled in such a way that a cross-sectional area is created in the cross-sectional plane within the sheet metal box, which cross-sectional area essentially contains the area required by the cabin and its guides and drive devices, and in addition the area of a lift platform to bridge a distance between the cabin and the building. Preferably, the prefabricated shaft is fabricated with one lift platform per story.
Such a prefabricated shaft, placed in front of the front side of the building, can cover the entire width of the staircase, so that it can be opened completely to the front side of the building when the building is retrofitted using the lift system. Since there is space within the prefabricated shaft for a lift platform that a person steps on after leaving the cabin, the cabin can be arranged at a certain distance, namely the width of the lift platform, in front of the front side of the building, which advantageously enlarges freedom of design inside the staircase.
For buildings that have a staircase having intermediate landings and the ground floor of which is half a story above ground level, it is essential to provide external access to the ground floor level after the intermediate landings have been removed without having to use the lift system. This is made possible by the concept of an additional lift platform to bridge a distance between the cabin and the building. Such external access can be created by opening access to the lift platform via an outer staircase in addition to the cabin. Without a lift platform, external access through a sheet metal box covering the entire width of the staircase on the front side of the building would only be possible if an appropriate additional platform were installed inside the staircase. However, the installation space is usually not sufficient for this. The lift platform and the correspondingly designed cross section of the sheet metal box rather increase the area of the staircase. This is also the case when the building to which the lift system is to be attached does not contain a staircase having intermediate landings, so that the prefabricated shaft used according to the invention offers advantages even then.
Using the lift platform provided according to the invention, the traffic area in front of the lift system in the staircase is expanded at the same level; thus, with the concept according to the invention, the requirements for complete barrier-free access, which, in addition to level access, also require maneuvering areas of typically 1.5 m×1.5 m in front of a lift door, can be met without any problems.
Since the prefabricated shaft according to the invention is intended to retrofit a building using a lift system and thereby to cover the entire area of the staircase at the front side of the building, it is preferred when the sheet metal box is provided with light openings in a wall adjacent to the lift platforms. To increase the degree of prefabrication, these light openings can already be equipped with windows when the prefabricated shaft is transported to the construction site.
When the prefabricated shaft is provided with lift platforms, these preferably have anchoring devices for anchoring to elements of the staircase, wherein these anchoring devices preferably produce a floating anchor between the lift platform and a continuing platform or walkway inside the staircase.
The sheet metal box of the prefabricated shaft is preferably essentially open on the side which, in the assembled state, faces the front side of the building. In this way, the sheet metal box enlarges the enclosed space of the staircase, and in particular the lift platforms become part of the staircase. In the area in which the cabin moves within the sheet metal box, this building side of the shaft can be provided with cross struts and sheathings, so that only one passage opening for entering and exiting the cabin remains free.
The sheet metal box of the prefabricated shaft preferably has a passage opening on one side that is not the building side, which passage opening is located in a position in which the lift platform for the ground floor of the building is located after the lift system has been attached to a building. This passage opening thus forms the front door to be made accessible via an outer staircase, through which one can get into the building or the staircase bypassing the lift system. In addition, there are advantages when a further passage opening is added on the ground level on one side of the sheet metal box, which side is not the building side of the shaft, and through which the cabin inside the shaft is accessible from the outside at ground level. This ensures barrier-free access to the lift system, even when a building is retrofitted using the prefabricated shaft according to the invention, the ground floor of which is half a story above the ground level.
The sheet metal box of the prefabricated shaft preferably has a bottom surface which is provided with fastening elements for fastening the shaft to a foundation, wherein the fastening elements advantageously have adjustment devices in order to be able to align the shaft vertically on the foundation.
For buildings whose entrance and staircase are arranged on the front, the prefabricated shaft must be set up on this front side. However, the supply lines for fresh water, waste water, electricity and information technology usually run there at a depth of typically 1.20 m below ground level. A conventional prefabricated shaft is provided with an underpass below the lowest station of the cabin, in particular to provide sufficient movement path for a counterweight of the cabin. Since the lowest station approached by the cabin should be on ground level for extensive accessibility, a correspondingly deep excavation is necessary for the foundation of the lift system to make room for this underpass. For this, however, the supply lines would have to be laid, which is associated with corresponding effort and a period in which the building cannot be used. It is therefore preferred in the context of the present invention when the sheet metal box has a shortened underpass and is extended upwards in accordance with this shortening. This enables the foundation for the lift system to be made to a depth that is still above the supply line. This depth is typically between 0.8 m and 1.0 m.
The lift system used according to the invention for attaching to a building from the outside comprises a prefabricated shaft described above, a cabin which can be moved in the longitudinal direction of the shaft, its guides and drive devices and a lift platform for each story. In order to increase the degree of prefabrication, the lift system preferably also already comprises all doors and windows and a seal for joining the shaft to the front side of the building. Due to the inherent stability of the sheet metal box used for the prefabricated shaft, the lift system according to the invention can be transported in the prefabricated state to the construction site by a lorry and set up there.
The method according to the invention for retrofitting a building using a lift system according to the invention is provided for a building that contains a plurality of stories, which are in particular subdivided and have story doors which are accessible via a common staircase. The staircase is adjacent to the front side of the building and has, per story, a main landing for the story doors and an intermediate landing for a double-flight of stairs.
According to the method according to the invention, the lift system is first prefabricated in the factory. A foundation for the lift system is fabricated in front of the front side of the building. Regardless of the time, the front side of the building is opened in the width of the staircase, the intermediate landings and the double-flight of stairs are removed, walkways are installed at the height of the main landings, which extend horizontally from the main landings to the front side of the building and thereby cover the cross section of the staircase only partially, in particular half, to leave clear space for a flight of stairs, and a single-flight of stairs that connects the individual walkways to one another and together forms a modified staircase therewith is installed. Afterwards, the prefabricated lift system, after being transported from the factory to the construction site, is set up on the foundation, aligned thereto and thereby joined to the front side of the building. A connection is made between the lift platforms and the walkways of each story, which is preferably designed to be floating in order to enable a slight relative movement between the lift system and the building. Finally, access to the lift platform of the ground floor is made from outside the building, preferably by attaching a front door to the sheet metal box of the lift shaft and fastening an outer staircase in order to be able to get from the ground level to the front door.
Using the method according to the invention, it is possible for the first time to retrofit an existing and used building within a few working days, typically three to four days, with a lift system, largely barrier-free, and then to free up the building again completely for unrestricted use. Due to the high degree of prefabrication of the lift system, the operational safety tests and approvals are limited to an acceptance test of the installed lift system on site, which can typically be done within a day.
According to a preferred embodiment of the method according to the invention, the contact points between the lift system and the front side of the building are sealed, in particular using assembly foam and/or an elastomeric sealing element. This can be, for example, a U-profile or a hose that is filled with fire protection foam.
To fabricate the foundation for the lift system in front of the front side of the building, an excavation for a shallow foundation is preferably made, in particular with a case bottom of approx. 0.8 m to 1.0 m depth, so as not to impair any supply lines that are typically laid at a depth of approx. 1.2 m.
The foundation itself is preferably prepared as a foundation plate from a one-part or multi-part precast concrete part. This has the advantage that the foundation plate does not have to be concreted on site, but can be delivered in a completed state by lorry. For this purpose, the foundation plate can be formed in several parts, wherein each precast concrete part that is to become part of the foundation plate has dimensions and a weight with which transport on a normal lorry is possible.
The foundation plate is preferably made from two precast concrete parts which are initially not connected to one another. Only after the lift system has been set up on the foundation are the two precast concrete parts indirectly fastened to one another, in that the shaft of the lift system is partly fixed to the first and partly to the second precast concrete part.
For the single-flight of stairs that connects the individual walkways to one another and forms a modified staircase therewith, straight stair sections having a quarter-turn entrance and exit, or having a quarter platform at the entrance and exit, are preferably used. This shape of the stair sections makes the intermediate landings superfluous; the main landings are also preferably not part of the flight of stairs, rather only the walkways connect the individual stair sections on the way up or down. This can be very advantageous, in particular with regard to complete barrier-free access to the staircase, because the main landings are preserved as mere maneuvering areas.
In an alternative embodiment, straight stair sections having only a quarter-turn entrance or exit can be used, wherein the stair sections, depending on the orientation of their slope, begin or end on the main landing or use the main landing as a quarter platform of the flight of stairs.
According to the invention, two alternatives are provided for installing the walkways and the single-flight of stairs to replace the removed intermediate landings and the double-flight of stairs:
According to a first alternative, a crossbeam is used before installing the walkways, which crossbeam is fastened on both sides of the staircase to the outer walls of the front side of the building, and on which the respective walkway is placed. Here, the removal of the intermediate landings and the double-flight of stairs and the installation of the walkways and the single-flight of stairs are carried out in successive partial sections from top to bottom, for example, using a lifting platform.
According to a second alternative, the walkways and the single-flight of stairs are installed by installing a preassembled staircase module. The procedure is therefore not successive, but rather the staircase is first gutted by removing the intermediate landings and the double-flight of stairs in order to be able to use the staircase module in one piece. The staircase module in this case contains at least the walkways and the stair sections which connect the walkways over a single-flight and preferably have a quarter-turn entrance and/or exit. In addition, the staircase module contains, as an essential element, a holding structure to which the walkways and the stair sections are fastened and which preferably consists essentially of a number of interconnected profiles or tubes which run in the stairwell and connect all walkways to one another.
To simplify the installation of the staircase module, a separate basement staircase module is preferably used, which comprises a single-flight stair section and support for the staircase module, and which is installed before the staircase module is installed by inserting it into the gutted staircase and is set up there on the basement floor.
The installation of the staircase module is particularly easy when, in addition, auxiliary rails for sliding in the staircase module into the building are installed on the ground level and the staircase module can be slid in through the open front side of the building by means of the auxiliary rails. The foundation for the lift system is expediently covered before the auxiliary rails are attached, in order to avoid any damage to the foundation. After the staircase module has been slid in, the auxiliary rails can be removed or cut to length, and the staircase module essentially rests on the supports of the basement staircase module. In addition, the walkways of the staircase module can be connected to building walls and/or the main landings. Such a staircase module in turn increases the degree of prefabrication when retrofitting a building using a lift system, whereby the construction time for the retrofitting is shortened again.
Finally, the present invention also comprises a component kit for performing the method according to the invention, wherein this component kit comprises at least one prefabricated shaft according to the invention and a preassembled staircase module, wherein the staircase module consists of one walkway for each story and of stair sections which connect the walkways over a single flight, and a holding structure to which at least the walkways and preferably also the stair sections are fastened.
The holding structure of the preassembled staircase module preferably consists essentially of a number of interconnected profiles or tubes which run in the stairwell and connect all the walkways to one another.
The stair sections of the preassembled staircase module are preferably designed as stair sections having a quarter-turn entrance and/or exit or having a quarter platform at the entrance and/or exit.
The component kit according to the invention can also comprise a foundation plate made of a one-part or multi-part precast concrete part, and a separate basement staircase module having a single-flight stair section and supports for the staircase module.
An embodiment of a lift system designed according to the invention and an embodiment for performing a method according to the invention are described and explained in more detail with reference to the accompanying drawings. Shown are:
The method shown schematically illustrated in
In order to protect any supply lines of the building for fresh water, waste water, electricity and/or data traffic against excessive loads, as shown in
In
As
As
As shown in
The staircase module 19 obtains the necessary inherent stability through a holding structure 25 which is arranged in the stairwell and comprises a plurality of vertically running steel tubes which connect the individual walkways 24, 24′ to one another and finally transfer the load onto the support 17 of the basement staircase module 16.
After making connections between the walkways 24 and the main landings 7, and optionally after additional securing of the walkways 24 and/or the stair sections 23 on the side walls of the staircase 5, the foundation cover 15 is removed again and the auxiliary rails are scaled back by cutting to length.
The construction site is thus prepared for the delivery of a lift system 26 designed according to the invention, which in turn is delivered using a lorry 20 and is lifted and set up by a crane lorry 21, as shown in
As
In order to create an escape route or access to the staircase 5 and to the individual story doors 4 bypassing the lift, the front door 29, which is now located at the level of the ground floor, since it leads to the ground floor lift platform, from where the ground floor walkway 24 and the ground floor main landing 7 can be reached, is equipped with an outer platform 31 and an outer staircase 32.
After removal of the lift system 26 and attachment of handrails 33 and a canopy 34, as shown in
As
At ground level 2, an outwardly oriented passage opening 30 can be reached in the shaft 27, through which a cabin (not illustrated here) that is movable within the shaft 27 in the longitudinal direction is accessible. Alternatively, access to the staircase 5 via the outer staircase 32 and the front door 29 to the ground floor lift platform 35 is ensured, from where the single-flight of stairs 22 with the walkways 24 can be reached without having to use the lift system 26.
As
The stair sections 23 having quarter-turn entrance and exit prevent the main landings 7 and the lift platforms 35 from having to be part of the single-flight of stairs 22. Rather, they can be used as mere traffic and maneuvering areas in the sense of complete accessibility. Appropriate handrails ensure the necessary traffic safety.
The central function of the lift platform 35 is illustrated using
The design of the modified staircase having a single-flight of stairs 22, which, as in the embodiment according to
Using this construction, the main landings 7 and the lift platforms 35 are also used as part of the single-flight of stairs 22, as can be clearly seen from
If the staircase has a sufficient width for an embodiment according to