The field of this invention relates to techniques and equipment to gravel-pack and treat closely spaced zones and more particularly in applications where some degree of isolation is desired between the zones for accommodating different treatment plans.
In producing hydrocarbons or the like from loose or unconsolidated and/or fractured formations, it is not uncommon to produce large volumes of particulate material along with the formation fluids. As is well known in the art, these particulates routinely cause a variety of problems and must be controlled in order for production to be economical. A popular technique used for controlling the production of particulates (e.g., sand) from a well is one which is commonly known as “gravel-packing.”
In a typical gravel-packed completion, a screen is lowered into the wellbore on a work string and is positioned adjacent to the subterranean formation to be completed, e.g., a production formation. Particulate material, collectively referred to as “gravel,” and a carrier fluid is then pumped as a slurry down the work string where it exits through a “cross-over” into the well annulus formed between the screen and the well casing or open hole, as the case may be. The carrier liquid in the slurry normally flows into the formation through casing perforations, which, in turn, is sized to prevent flow of gravel therethrough. This results in the gravel being deposited or “screened out” in the well annulus where it collects to form a gravel pack around the screen. The gravel, in turn, is sized so that it forms a permeable mass, which allows the flow of the produced fluids therethrough and into the screen while blocking the flow of the particulates produced with the production fluids.
One major problem that occurs in gravel-packing single zones, particularly where they are long or inclined, arises from the difficulty in distributing the gravel over the entire completion interval, i.e., completely packing the entire length of the well annulus around the screen. This poor distribution of gravel (i.e., incomplete packing of the interval) is often caused by the carrier fluid in the gravel slurry being lost into the more permeable portions of the formation, which, in turn, causes the gravel to form “sand bridges” in the annulus before all the gravel has been placed. Such bridges block further flow of slurry through the annulus, which prevents the placement of sufficient gravel (a) below the bridge in top-to-bottom packing operations or (b) above the bridge in bottom-to-top packing operations.
To address this specific problem, “alternate path” well strings have been developed which provide for distribution of gravel throughout the entire completion interval, even if sand bridges form before all the gravel has been placed. Some examples of such screens include U.S. Pat. Nos.: 4,945,991; 5,082,052; 5,113,935; 5,417,284; 5,419,394; 5,476,143; 5,341,880; and 5,515,915. In these well screens, the alternate paths (e.g., perforated shunts or bypass conduits) extend along the length of the screen and are in fluid communication with the gravel slurry as the slurry enters the well annulus around the screen. If a sand bridge forms in the annulus, the slurry is still free to flow through the conduits and out into the annulus through the perforations in the conduits to complete the filling of the annulus above and/or below the sand bridge.
One of the problems with the alternate path design is the relatively small size of the passages through them. These tubes are also subject to being crimped or otherwise damaged during the installation of the screen. Thus, several designs in the past have placed these tubes inside the outer surface of the screen. This type of design substantially increases the cost of the screen over commercially available screens. Yet other designs have recognized that it is more economical to place such tubes on the outsides of the screen and have attempted to put yet another shroud over the alternate paths which are on the outside of the screen to prevent them from being damaged during insertion or removal. Such a design is revealed in U.K application No. GB 2317 630 A.
While such designs can be of some benefit in a bridging situation, they present difficulties in attempting to treat and gravel-pack zones which are fairly close together. Many times zones are so close together that traditional isolation devices between the zones cannot be practically employed because the spacing is too short. For example, situations occur where an upper and lower zone are spaced only 5-20 feet from each other, thus precluding a complete completion assembly in between screens for each of the zones. When these closely spaced zones are encountered, it is desirable to be able to gravel-pack and treat the formations at the same time so as to save rig time by eliminating numerous trips into the well. This method was explained in U.S. Pat. No. 6,230,803. At times these types of completions will also require some degree of isolation between them, while at the same time producing one or the other of the formations. In U.S. Pat. No. 6,230,803 a method was disclosed to facilitate fluid treatments such as fracture stimulation, as well as gravel packing, simultaneously, in two or more adjacent producing zones, while providing limited hydraulic isolation between two or more adjacent zones. That method minimized rig time for the completion by reducing the number of trips required to install the gravel screen assemblies and to treat the formation. The limitation of that method was that the two zones had to be treated simultaneously. This caused problems if the nature of the adjacent formations necessitated a different treatment program. The isolation of the zones after completion was also less than ideal. Accordingly, the present method seeks to allow the treatment of adjacent zones in a single trip one at a time so that different regimens can be used. It provides, in the preferred embodiment, a check valve for retention of fluids in the string against loss into the formation. It provides an option of isolating a zone while treating the other. The method of the present invention can also be used in a single producing zone to minimize bridging problems during gravel distribution by splitting the zone into segments and gravel packing each segment individually. These objectives and how they are accomplished will become clearer to those skilled in the art from a review of the detailed description of the preferred embodiment and the claims, which appear below.
A method is disclosed that allows for sequential treatment of two zones in a single trip while isolating the zones. A fluid loss valve prevents the column of fluid in the tubing from flowing into the lower formation until activated. Zone isolation is accomplished by manipulation of a port on a wash pipe attached to the crossover assembly.
Packer 60 is supported by screen 22 and it in turn supports screen 62 at perforations 64. Packer 60 is multi-bore. The first bore 66 communicates to inside screen 62. The second bore 68 communicates with a standpipe 70 that is capped at cap 72 at its upper end. As shown in
Those skilled in the art will appreciate that the zones can be closely spaced and can be treated separately in a single trip. Two or more zones can be sequentially treated in a single trip. The treatment can be by circulation with returns to the surface or elsewhere or without returns with the fluids driven into the formation being treated. When treating two zones, one is isolated when the other is treated. Finally, a fluid loss prevention feature, which is a flapper 58 in the preferred embodiment retains the liquid column in the tubular 16 and prevents its passage into the formation. The fluid prevention feature can be a flapper or ball device or any other valve that hold up the liquid column when the wash pipe 38 is pulled out.
The above description is illustrative of the preferred embodiment and many modifications may be made by those skilled in the art without departing from the invention whose scope is to be determined from the literal and equivalent scope of the claims below:
This application claims the benefit of U.S. Provisional Application No. 60/390,634 on Jun. 21, 2002.
Number | Name | Date | Kind |
---|---|---|---|
2991833 | Brown et al. | Jul 1961 | A |
4270608 | Hendrickson et al. | Jun 1981 | A |
4273190 | Baker et al. | Jun 1981 | A |
4401158 | Spencer et al. | Aug 1983 | A |
4627488 | Szarka | Dec 1986 | A |
4915172 | Donovan et al. | Apr 1990 | A |
4945991 | Jones | Aug 1990 | A |
5082052 | Jones et al. | Jan 1992 | A |
5113935 | Jones et al. | May 1992 | A |
5332039 | Primeaux et al. | Jul 1994 | A |
5341880 | Thorstensen et al. | Aug 1994 | A |
5343949 | Ross et al. | Sep 1994 | A |
5373899 | Dore′ et al. | Dec 1994 | A |
5417284 | Jones | May 1995 | A |
5419394 | Jones | May 1995 | A |
5476143 | Sparlin et al. | Dec 1995 | A |
5515915 | Jones et al. | May 1996 | A |
5577559 | Voll et al. | Nov 1996 | A |
5921318 | Ross | Jul 1999 | A |
6230803 | Morton et al. | May 2001 | B1 |
6298916 | Tibbles et al. | Oct 2001 | B1 |
6318469 | Patel | Nov 2001 | B1 |
6464006 | Womble | Oct 2002 | B2 |
6488082 | Echols et al. | Dec 2002 | B2 |
6575251 | Watson et al. | Jun 2003 | B2 |
20020117301 | Womble | Aug 2002 | A1 |
Number | Date | Country |
---|---|---|
2317630 | Jan 1998 | GB |
Number | Date | Country | |
---|---|---|---|
20040003922 A1 | Jan 2004 | US |
Number | Date | Country | |
---|---|---|---|
60390634 | Jun 2002 | US |