Claims
- 1. An estimator program that performs method steps for estimating the optimum operating Server Farm designed to serve a particular number of clients “n” comprising the steps of:(a) inputting a group of parameters involving at least one parameter involving at least one parameter for Single Server Farm cost evaluation and at least one parameter for downtime cost evaluation; wherein said step (a) of inputting said group of parameters includes the steps of: (a1) selecting for input said particular number of clients “n” for utilizing said Server Farm; (a2) selecting for input one parameter for said single Server Farm cost evaluation; (a3) selecting for input one parameter for said downtime cost evaluation; (b) selecting at least one Server Farm optimization parameter and its domain which indicates the values that the Server Farm optimization parameter may assume; (c) selecting a Server Farm optimization criterion that is a function of at least three arguments: (i) said Single Server Farm cost evaluation; (ii) said downtime cost evaluation; (iii) said Server Farm optimization parameter; (d) using an optimization technique to find the optimum value of the optimization parameter.
- 2. The method of claim 1 wherein step (a2) involves the Single Server Farm (SSF) cost.
- 3. The method of claim 1 wherein step (a3) involves the client-license cost per client per server.
- 4. The method of claim 1 wherein step (a3) involves the downtime cost per client, per hour.
- 5. The method of claim 1 wherein step (a3) involves the downtime cost per server.
- 6. The method of claim 1 wherein step (a) further includes the steps of:(2a4) selecting for input a maximum single server workload of users; (2a5) selecting for input a Mean Time To Repair (MTTF) for a single server; (2a6) selecting for input a Mean Time To Failure (MTTF) for a single server.
- 7. The method of claim 1 wherein step (b) for selecting an optimization parameter includes:(b1) selecting a Redundancy Factor having a domain which is an interval between 0 and 100 percent.
- 8. The method of claim 1 wherein step (b) for selecting an optimization parameter includes:(b2) selecting a Server Farm size which is any natural integer number of servers.
- 9. The method of claim 1 wherein step (b) for selecting an optimization parameter includes:(b3) selecting a normal single server workload of users having a domain which is any number between one (1) and the maximum single server workload.
- 10. The method of claim 1 wherein step (c) for selecting said optimization criteria of three arguments includes:(c1) selecting an optimization function which is the sum of the entire Server Farm cost and the downtime losses calculated as based on said Single Server Farm (SSF) cost evaluation and said downtime cost evaluation.
- 11. The method of claim 1 wherein step (c) for selecting said optimization criteria includes:(c2) selecting an optimization function which is a linear or concave function (up everywhere on the function's domain or down everywhere on the function's domain) of said Server Farm cost evaluation and said downtime losses evaluation.
- 12. The method of claim 1 wherein step (d) for using said optimization procedure includes the steps of:(d1) selecting a value of said optimization parameter from said domain; (d2) calculating said Single Server Farm cost; (d3) calculating said downtime cost; (d4) calculating a value of said optimization criterion; (d5) making an evaluation decision about the end or the continuation of said optimization procedure.
- 13. The method of claim 12 wherein step (d2) involves the single server cost.
- 14. The method of claim 12 wherein step (d2) involves the client-license cost per client, per server.
- 15. The method of claim 12 wherein step (d3) involves the downtime cost per server, per hour.
- 16. The method of claim 12 wherein step (d3) involves the downtime cost per client, per hour.
- 17. The method of claim 12 wherein step (d5) involves the decision to stop the procedure if the optimum number of servers in the configured farm is determined.
- 18. The method of claim 12 wherein step (d5) includes the step of:(d5a) continuing the optimization procedure if the optimum number for Server Farm size is not yet determined, by repeating said steps (d2) through (d5) with another value of said optimization parameter from said domain.
CROSS-REFERENCES TO RELATED APPLICATIONS
This application is related to U.S. Pat. No. 6,344,196 entitled “Estimator Program for Estimating the Availability of an Application Program That Runs in a Cluster of at Least Two Computers” and U.S. Ser. No. 09/443,926, Nov. 19, 1999, entitled “Method for Estimating the Availability of an Operating Server Farm” now Allowed, which applications are incorporated herein by reference.
US Referenced Citations (1)
| Number |
Name |
Date |
Kind |
|
6496948 |
Smorodinsky |
Dec 2002 |
B1 |