The invention relates to the step in the completion of oil wells in which the annular space between an outer casing and a smaller diameter inner casing that extends from the earth's surface is filled with cement.
During the initial stage of well drilling through the earth's surface, regions of soil, sand, gravel, loose rock and other unconsolidated materials are encountered. In order to stabilize the casing string that surrounds the production tubing string in this region of unstable subsurface material, an outer casing is lowered with the progressing drill bit. When a more stable formation is reached, the outer casing terminates and an inner casing is then lowered to complete the drilling.
The outer casing may extend to a depth of 1,000 feet/330 m, or more, and is required to provide a barrier for the drilling operation and protect and stabilize the inner casing at the upper layer of the earth's surface where the subsurface is unconsolidated material. Once the drilling has reached a more compacted portion of the formation, the inner casing alone is lowered to the final drilling depth, which may be 4,000 feet/1300 m, or more. The inner casing is stabilized and rigidly secured in place by cementing the annular space between the two casings.
The purpose of a stage-cementing tool is to enable the operator to fill the annulus between the inner and outer surface casing strings with cement slurry when there is a lost circulation zone below the bottom of the outer casing. A lost circulation zone is one in which a cement slurry, drilling mud or other fluids cannot be contained in the well bore and are dissipated and lost in the surrounding formation. This is an undesirable condition and must be rectified.
One conventional stage-cementing tool consists of an inflatable packer element and a diverting tool (DV tool) above the packer. The tool is connected to the inner casing and run in the well to a depth of 50 to 100 ft above the bottom of the outer casing.
A heavy metal object, referred to in the art as a “metal bomb”, is dropped in the casing. The bomb falls freely in the drilling fluid in the casing and seats in the stage-cementing tool. Hydraulic pressure is applied from the surface to shift a sleeve and open a port in the stage cementing tool. Drilling fluid is pumped into the port to inflate the packer of the stage tool and form a seal with the outer casing. Higher pressure is then applied to open ports in the diverting tool above the packer. A known volume of cement slurry is pumped down the inner casing. A closing plug is dropped into the casing and drilling fluid is pumped to displace the plug and cement. The cement enters the casing annulus through the open ports in the DV tool above the packer. When the closing plug reaches the stage tool it shifts a sleeve to close the ports in the DV tool. At this time, the casing annulus is full of cement from the stage tool to the surface. The inflated packer forms a seal with the outer casing to prevent the cement slurry from falling into the lost circulation zone below the packer.
The following problems can develop when using a conventional stage-cementing tool:
Cement baskets are sometimes used instead of stage-cementing tools to place cement in the casing annulus. Cement baskets cannot hold a large load of cement and, therefore, they are normally run to shallow depths of about 300 to 400 feet from the surface. Cement baskets do not form a seal with the outer casing and cement slurry can pass through the arms of the basket. For this reason the cementing job is performed by pumping cement slurry into the annulus in three to four stages to fill the annulus to the surface. After each stage the cement is allowed to harden for 3 to 4 hours before pumping the next stage. This procedure consumes excessive amount of rig time and is therefore costly.
It is therefore an object of the present invention to provide an improved stage-cementing apparatus and method that reliably seals the annular space at the desired depth.
Another object of the invention is to provide a stage-cement tool that can be installed relatively quickly and that is sufficiently robust to support a column of cement slurry that is 1000 feet, or more, in height.
In accordance with the present invention, a donut-shaped, or annular, steel plate of substantial thickness having an outer diameter that is less than the inner diameter of the outer casing is positioned on a section of the inner casing and lowered into the outer casing as part of the string. This device will be referred to as the stage-cementing metal plate. The casing and plate are lowered to within a predetermined distance, e.g., 50 feet from the down-hole end of the outer casing.
At this point in the drilling process, the annular space is filled with drilling fluid and the region below the end of the outer casing is referred to as a “lost circulation zone”. It is therefore necessary for a space to be provided between the outer rim of the plate and the inner wall of the outer casing in order to allow the fluid a passageway to escape as the plate is lowered through the fluid.
Typical casing diameters are as follows: outer casing 18 ⅝inches and inner casing 13 ⅜inches, thereby defining an annular space of about 2 ⅝inches. The plate of the invention is circular in shape with a concentric hole for mounting on the inner casing.
The plate is placed on the coupling of the inner casing string. Stop collars are placed on the inner casing above the plate to prevent vertical movement.
The plate is preferably about 2.5 inches/6.25 cm thick and has an outside diameter slightly smaller than the inside diameter of the outer casing to allow fluids or cement slurry to pass between the outer rim of the plate and the outer casing. The plate is run on the inner casing to the desired depth above the end of the outer casing string. A known volume of cement slurry spacer is pumped from the surface into the annulus between the two casing strings to displace the fluids in the annulus to the lost circulation zone.
A layer of gravel is poured into the annular space and forms a bridge to substantially fill the gap between the edge of the plate and the wall of the outer casing; simultaneously, well cement is poured into the annulus and is prevented from flowing below the annular plate by the layer of gravel. Eventually, the entire annular space from the plate to the surface is filled with the cement slurry and allowed to harden. The plate remains in place supporting the column of hardened cement, which may be 3,000 feet/990 m in depth. The final stage of the installation and cementing is described in detail below.
The invention will be further described below and with reference to the attached drawings in which:
Referring to
Referring now to
The plate 10 is placed on the inner casing 20 and installed above the casing coupling 28. Three stop collars 30 are installed on top of the plate 10 to prevent vertical movement and contact the upper surface of shoulder 16. As will be apparent to those of ordinary skill in the art, other means for securing the plate 10 against vertical movement can be employed. The inner casing 20 with the plate 10 securely mounted is lowered to a position so that the plate is about 50 ft/16 m above the bottom of the outer casing. As shown in
Referring now to
After the cement slurry 48 has been pumped, about one thousand pounds of granular material 50 such as marble chips and gravel of various mesh sizes ranging from 600 microns to 0.75 in/19 mm is poured into the annulus, while also continuing to pump cement slurry into the annulus, as shown schematically in
The pumping of cement slurry 48 is continued until the granular material 50 reaches the plate 10 and forms a bridge or seal between the plate and the outer casing 40 blocking the flow of cement slurry around the plate as shown in
About 1000 pounds/455 kg of granular material such as marble chips or gravel of different sizes ranging from 600 microns to 0.75 in/19 mm is poured into the annulus while pumping cement. When the granular material reaches the plate, it forms a bridge between the plate and the outer casing preventing the passage of cement slurry around the plate. Pumping of cement slurry is continued until the annulus is filled with the earth's surface as shown in
As will be understood from the above description, the stage cementing plate of the present invention has a simple design with no moving parts which makes it more reliable than the conventional stage-cementing tools of the prior art. This apparatus and its method of use meet all of the objectives identified above and constitutes a significant improvement over the devices and methods of the prior art.
As will be apparent to one of ordinary skill in the art from the above description, other embodiments can be derived by obvious modifications and variations of the apparatus and methods disclosed. The scope of the invention is therefore to be determined by the claims that follow.
Filing Document | Filing Date | Country | Kind | 371c Date |
---|---|---|---|---|
PCT/US2007/024106 | 11/15/2007 | WO | 00 | 6/23/2009 |
Publishing Document | Publishing Date | Country | Kind |
---|---|---|---|
WO2008/069914 | 6/12/2008 | WO | A |
Number | Name | Date | Kind |
---|---|---|---|
3666009 | Stone | May 1972 | A |
3918523 | Stuber | Nov 1975 | A |
3948322 | Baker | Apr 1976 | A |
4421165 | Szarka | Dec 1983 | A |
4474241 | Freeman | Oct 1984 | A |
4491178 | Terrell et al. | Jan 1985 | A |
4678031 | Blandford et al. | Jul 1987 | A |
5024273 | Coone et al. | Jun 1991 | A |
5109925 | Stepp et al. | May 1992 | A |
5191932 | Seefried et al. | Mar 1993 | A |
5732775 | Hudson et al. | Mar 1998 | A |
6578638 | Guillory et al. | Jun 2003 | B2 |
20030183386 | McGregor et al. | Oct 2003 | A1 |
20030183387 | Nguyen et al. | Oct 2003 | A1 |
20040149418 | Bosma et al. | Aug 2004 | A1 |
20050087342 | Christensen | Apr 2005 | A1 |
20060016600 | Badalamenti et al. | Jan 2006 | A1 |
Number | Date | Country | |
---|---|---|---|
20100084135 A1 | Apr 2010 | US |