Claims
- 1. A process for successive concreting of high vertical walls, comprising the steps:a) arranging at least one upper support carrier on a largely planar surface, the carrier having support elements for supporting the upper support carrier laterally on completed wall sections, b) arranging a largely horizontal support structure above the upper support carrier and connecting the support structure with the upper support carrier for vertical support of the support structure, c) providing a plurality of concrete shuttering elements hanging down on the support structure so that to bring the concrete shuttering elements on the largely planar surface into a shuttering position, the concrete shuttering elements being arranged adjacent to the upper support carrier, d) arranging at least one lift device between the support structure or the upper support carrier and the largely planar surface and securing the lift device on the support structure, e) concreting first wall sections on the largely planar surface to form the completed wall sections, f) providing a displacement of the concrete shuttering elements in a horizontal direction, and moving the support structure, the concrete shuttering elements and the upper support carrier in vertical direction by the lift device, g) mounting a lower support carrier on a lower end of the lift device, h) arranging the support elements of the upper support carrier for lateral support in the completed wall sections below an adjacent concrete shuttering element, i) moving the upper support carrier, the support structure and the concrete shuttering elements to a position at which the upper support carrier is supportable in the upper zones of the completed wall sections, j) concreting newly arranged wall sections above the completed wall sections and k) repeating steps l) to j) at discretion, wherein the newly arranged wall sections become the completed wall sections.
- 2. A process as in claim 1, wherein the support elements being used to deliver the upper support carrier to the planar surface or the completed wall sections.
- 3. A process as in claim 1, wherein the concreting is provided during the step d).
- 4. A process as in claim 1, wherein step g) further comprises changing the upper support carrier and/or position of the shuttering elements with respect to the upper support carrier.
- 5. A process as in claim 1, wherein step i) further comprises horizontal displacement of the concrete shuttering elements prior to movement of the upper support carrier.
- 6. A process as in claim 1, wherein step j) further comprises movement of the lower support carrier to a height at which it is supportable in the upper zones of completed wall sections.
- 7. A process in accordance with claim 1, wherein during step h) the support elements are applied on the upper support carrier for lateral support, the support elements being pivotable around a largely horizontal axis.
- 8. A process as in claim 7, further including raising the shuttering elements during the step h).
- 9. A process as in claim 1, further including raising the shuttering elements during the step h).
- 10. A process as in claim 9, wherein sections of the upper support carrier are laterally extended during step h).
- 11. A process of successive concreting of high vertical walls, comprising the steps of:a) arranging at least one upper support carrier on a largely planar surface having elements by which the upper support carrier is vertically supportable by lateral contact on completed wall sections, said elements being usable to deliver the support carrier, b) arranging a largely horizontal support structure above the upper support carrier and connecting the support structure with the upper support carrier for vertical support of the support structure, c) providing a plurality of concrete shuttering elements hanging down on the support structure so that to bring the concrete shuttering elements on the largely planar surface into a shuttering position, the concrete shuttering elements being arranged adjacent to the upper support carrier, d) arranging at least one lift device between the support structure and the largely planar surface and securing the lift device on the support structure or on the upper support carrier, e) concreting first wall sections on the largely planar surface to form the completed wall sections, f) providing horizontal displacement of the concrete shuttering elements and vertical movement of the support structure, the concrete shuttering elements and the upper support carrier by the lift device, g) mounting a lower support carrier on a lower end of the lift device, h) changing the upper support carrier and/or position of the shuttering elements with respect to the upper support carrier, so that elements of the upper support carrier are arranged for lateral support in the completed wall sections below an adjacent concrete shuttering element, i) optionally displacing the concrete shuttering elements in horizontal direction and moving the upper support carrier, the support structure and the concrete shuttering elements in vertical direction to a position where the upper support carrier is supportable in upper zones of the completed wall sections j) concreting newly arranged wall sections above the completed wall sections, k) moving the lower support carrier to a position at which it is supportable in the upper zones of the completed wall sections, and l) repeating steps i) to k) as necessary, wherein the newly arranged wall sections become the completed wall sections.
- 12. A process according to claim 11, further including during the step h) a sub-step of applying elements for lateral support on the upper support carrier, the elements being pivotable around a largely horizontal axis.
- 13. A process according to claim 12, including raising the shuttering elements during step h).
- 14. A process according to claim 1, including raising the shuttering elements during step h).
- 15. A process according to claim 14, wherein the upper support carrier has one or more sections laterally extendable into engagement with the completed wall sections during step h).
Priority Claims (1)
Number |
Date |
Country |
Kind |
196 39 038 |
Sep 1996 |
DE |
|
Parent Case Info
This is a division, of prior application Ser. No. 09/273,950, filed Mar. 22, 1999, now U.S. Pat. No. 6,276,912 which is a continuation of International application No. PCT/EP97/05220, filed Sep. 23, 1997, now abandoned, and which is hereby incorporated herein by reference in its entirety.
US Referenced Citations (3)
Foreign Referenced Citations (6)
Number |
Date |
Country |
597 836 |
Jun 1990 |
AU |
607 139 |
Feb 1991 |
AU |
21 54 188 |
May 1973 |
DE |
24 10 877 B 2 |
Sep 1974 |
DE |
2 318 289 |
Feb 1977 |
FR |
WO 9009497 |
Aug 1990 |
WO |
Non-Patent Literature Citations (2)
Entry |
Customer Information Material of Aluma-Systems (10 pages of drawings). |
International Search Report for PCT/EP97/05220 dated Jan. 21, 1998 (1 pg.). |
Continuations (1)
|
Number |
Date |
Country |
Parent |
PCT/EP97/05220 |
Sep 1997 |
US |
Child |
09/273950 |
|
US |