Claims
- 1. In a method of obtaining a controlled degree of ballast compaction in the tamping and leveling of a track consisting of rails mounted on ties, wherein the ballast is tamped under each one of the ties and the track is leveled in relation to a reference system, the improvement of controlling the degree of compaction of the ballast under each tie in proportion to a maximum track level error at said tie, holding the track at a desired level determined by the reference system, and continuing the tamping to press the track upwardly while being held at the desired level so that zones of ballast compaction proportional to the track level error at each tie are continuously produced along a long track section.
Priority Claims (1)
Number |
Date |
Country |
Kind |
4627/73 |
May 1973 |
OE |
|
Parent Case Info
This is a division of Ser. No. 458,580, filed Apr. 8, 1974, now U.S. Pat. No. 3,895,583, dated July 22, 1975.
US Referenced Citations (2)
Number |
Name |
Date |
Kind |
3605626 |
Stewart |
Sep 1971 |
|
3807311 |
Plasser et al. |
Apr 1974 |
|
Divisions (1)
|
Number |
Date |
Country |
Parent |
458580 |
Apr 1974 |
|