The present invention relates generally to reactive shaped charges used in the oil and gas industry to explosively perforate well casing and underground hydrocarbon bearing formations, and more particularly to an improved method for explosively perforating a well casing and its surrounding underground hydrocarbon bearing formation prior to injecting fluids or gases, enhancing the effects of the injection and the injection parameters.
Injection activities are a required practice to enhance and ensure the productivity of oil and gas fields, especially in environments where the natural production potential of the reservoir is limited (e.g. low-permeability formations). Generally, injection activities use special chemical solutions to improve oil recovery, remove formation damage, clean blocked perforations or formation layers, reduce or inhibit corrosion, upgrade crude oil, or address crude oil flow-assurance issues. Injection can be administered continuously, in batches, in injection wells, or at times in production wells.
In a majority of cases, wells that will be subject to injection activities are completed with a cemented casing across the formation of interest to assure borehole integrity and allow selective injection into and/or production of fluids from specific intervals within the formation. It is necessary to perforate this casing across the interval(s) of interest to permit the ingress or egress of fluids. Several methods are applied to perforate the casing, including mechanical cutting, hydro-jetting, bullet guns and shaped charges. The preferred solution in most cases is shaped charge perforation because a large number of holes can be created simultaneously, at relatively low cost. Furthermore, the depth of penetration into the formation is sufficient to bypass near-wellbore permeability reduction caused by the invasion of incompatible fluids during drilling and completion. The vast majority of perforated completions depend on the use of shaped charges because of the relative speed and simplicity of their deployment compared to alternatives, such as mechanical penetrators or hydro-abrasive jetting tools. However, despite these advantages shaped charges provide an imperfect solution.
Perforation is inevitably a violent event, pulverizing formation rock grains and resulting in plastic deformation of the penetrated rock, grain fracturing, and the compaction of particulate debris (fractured sand grains, cement particles, and/or metal particles from casing, shaped charge fragments or the disintegrating liner) into the tunnel and the pore throats of rock surrounding the tunnel. As seen in the tunnels 32 of
The distance a perforated tunnel extends into the surrounding formation, commonly referred to as total penetration, is a function of the explosive weight of the shaped charge; the size, weight, and grade of the casing; the prevailing formation strength; and the effective stress acting on the formation at the time of perforating. Effective penetration is the fraction of the total penetration that contributes to the inflow or outflow of fluids. This is determined by the amount of compacted debris left in the tunnel after the perforating event is completed. The effective penetration may vary significantly from perforation to perforation. Currently, there is no means of measuring it in the borehole. Darcy's law relates fluid flow through a porous medium to permeability and other variables, and is represented by the equation seen below:
Where: q=flowrate, k=permeability, h=reservoir height, pe=pressure at the reservoir boundary, pw=pressure at the wellbore, μ=fluid viscosity, re=radius of the reservoir boundary, rw=radius of the wellbore, and S=skin factor.
The effective penetration determines the effective wellbore radius, rw, an important term in the Darcy equation for the radial inflow. This becomes even more significant when near-wellbore formation damage has occurred during the drilling and completion process, for example, resulting from mud filtrate invasion. If the effective penetration is less than the depth of the invasion, fluid flow can be seriously impaired.
To optimize the production potential of a tunnel, current methods rely on either remedial operations during or after the perforation or modification of the system configuration. For example, current procedures commonly rely on the creation of a relatively large static pressure differential, or underbalance, between the formation and the wellbore, wherein the formation pressure is greater than the wellbore pressure. These methods attempt to enhance tunnel cleanout by controlling the static and dynamic pressure behavior within the wellbore prior to, during and immediately following the perforating event so that a pressure gradient is maintained from the formation toward the wellbore, inducing tensile failure of the damaged rock around the tunnel and a surge of flow to transport debris from the perforation tunnels into the wellbore. Underbalanced perforating involves creating the opening through the casing under conditions in which the hydrostatic pressure inside the casing is less than the reservoir pressure, allowing the reservoir fluid to flow into the wellbore. If the reservoir pressure and/or formation permeability is low, or the wellbore pressure cannot be lowered substantially, there may be insufficient driving force to remove the debris. Such techniques are relatively successful in homogenous formations of moderate to high natural permeability (typically 300 millidarcies and greater), where a sufficient surge flow can be induced to clean a majority of the perforation tunnels. In such cases, the percentage of tunnels left unobstructed (also known as “perforation efficiency”) may typically be 50-75% of the total holes perforated. Furthermore, laboratory experiments indicate that the clear tunnel depth of “clean” perforations created in an underbalanced situation generally varies between 50-90% of the total penetration.
In heterogeneous formations—where rock properties such as hardness and permeability vary significantly within the perforation interval—and in formations of high-strength, high effective stress and/or low natural permeability, underbalanced techniques become increasingly less effective. Since all the tunnels are being cleaned up in parallel by a common pressure sink, perforations shot into zones of relatively higher permeability will preferentially flow and clean up, eliminating the pressure gradient before adjacent perforations shot into poorer rock are able to flow.
Since the maximum pressure gradient is limited by the difference between the reservoir pressure and the minimum hydrostatic pressure that can be achieved in the wellbore, perforations shot into low permeability rock may never experience sufficient surge flow to clean up. In such circumstances the perforation efficiency may be as low as 10% of the total holes perforated.
In low to moderate-permeability reservoirs, a hydraulic fracture is commonly used for well stimulation to bypass near-wellbore damage, increase the effective wellbore radius, and increase the overall connectivity between the reservoir and the wellbore. Execution of a hydraulic fracture involves the injection of fluids at a pressure sufficiently high to cause tensile failure of the rock. At the fracture initiation pressure, often known as the “breakdown pressure,” the rock opens. As additional fluids are injected, the opening is extended and the fracture propagates. When properly executed, a hydraulic fracture results in a “path,” connected to the well that has a much higher permeability than the surrounding formation. This path of large permeability can extend tens to hundreds of feet from the wellbore.
Perforations play a critical role in any stimulation treatment because they form the only connection between the wellbore and formation. However, arriving at an optimum perforation design can be difficult because essentially all perforated completions are damaged, as shown by way of example in
In
Thus, inadequately cleaned tunnels limit the outflow area through which injection fluids can flow; inhibit injection rates at a given injection pressure; impair fracture initiation and propagation; increase the flux rate per open perforation, causing unwanted, increased erosion; and increase the risk that solids bridging across the open perforations will eventually result in catastrophic loss of injectivity (also known as “screen out”). Further, it becomes very difficult to accurately predict the outflow area created by a given set of perforations and the discussed prior art methods do not remedy the uncertainties associated with damaged perforation tunnels.
Consequently, there is a need for a method of reducing the effects experienced when using conventional perforators in heterogeneous formations. There is also a need for a method of reducing the effects of plastic deformation in moderate to high strength rocks and enhancing perforation cleanup, preferably achieved as part of the primary perforating operation and not by introducing additional operation complexity or cost. Further, there is a need for a method of enhancing the parameters and effects of injection to enhance and stimulate the production of oil and gas.
While current pre-stimulation procedures do not tend to rely on the quality of the tunnel—that is, whether or not it is plugged and/or damaged—for pre-stimulation activities, it has been found that the geometry of a tunnel will determine the effectiveness and reliability of the fracture treatment. The present application provides an improved method for the perforation of a wellbore, which substantially eliminates the crushed zone and preferably fractures the end or tip of a perforation tunnel (referred to also as creating one or more tip fractures), resulting in improved perforation efficiency and effective tunnel cleanout. This method minimizes near-wellbore pressure losses during injection, improves the distribution of injected fluid across the perforated interval, reduces the pressure required to initiate an hydraulic fracture, and reduces tortuosity effects in fractures created during fracturing operations.
Generally, the method comprises the steps of loading one or more reactive shaped charges within a charge carrier, positioning the charge carrier down a wellbore adjacent to an underground formation, and detonating the shaped charges. Upon detonation, a first and second explosive event is created. The first explosive event creates one or more perforation tunnels within the adjacent formation, each of said one or more perforation tunnels surround by a crushed zone. The second explosive event induces at least one fracture at the tip of at least one perforation tunnel.
In one embodiment, the crushed zone is eliminated by exploiting chemical reactions. By way of example, and without limitation, the chemical reaction between a molten metal and an oxygen-carrier such as water is produced to create an exothermic reaction within and around a perforation tunnel after detonation of a perforating gun. In a second and preferred embodiment, a strong exothermic intermetallic reaction between shaped charge liner components within and around a perforation tunnel eliminates the crushed zone. Preferably, the secondary reactions induced also create at least one fracture at the tip (or end) of a tunnel.
By fracturing the tip of a perforation tunnel, the residual stress cage caused by plastic deformation of the rock during creation of the tunnel is relieved, reducing the fluid pressure required to initiate a fracture during subsequent injection activity. By removing the crushed zone debris from a perforation tunnel, the inflow and/or outflow potential therefrom is significantly enhanced and further benefits are achieved. Without limiting the scope of the invention, the present method enhances a number of injection activities, which are further discussed below.
A more complete understanding of the method and apparatus of the present invention may be had by reference to the following detailed description when taken in conjunction with the accompanying drawings, wherein:
Where used in the various figures of the drawing, the same numerals designate the same or similar parts. Furthermore, when the terms “top,” “bottom,” “first,” “second,” “upper,” “lower,” “height,” “width,” “length,” “end,” “side,” “horizontal,” “vertical,” and similar terms are used herein, it should be understood that these terms have reference only to the structure shown in the drawing and are utilized only to facilitate describing the invention.
All figures are drawn for ease of explanation of the basic teachings of the present invention only; the extensions of the figures with respect to number, position, relationship, and dimensions of the parts to form the preferred embodiment will be explained or will be within the skill of the art after the following teachings of the present invention have been read and understood. Further, the exact dimensions and dimensional proportions to conform to specific force, weight, strength, and similar requirements will likewise be within the skill of the art after the following teachings of the present invention have been read and understood.
The proposed invention involves an improved method for perforating a cased wellbore. The increase in depth and area of the resulting tunnels enhances injection parameters (e.g. pressure, rate) and the effects of injection (e.g. outflow rate, outflow distribution along wellbore, fracture creation). By removing debris from a high percentage of tunnels created during a perforating operation, the pressure required to inject fluids or gases during a subsequent injection operation is reduced. Further, the distribution of injected fluids or gases across the perforated interval is improved. By fracturing the tip of a perforation tunnel, the residual stress cage caused by plastic deformation of the rock during perforation is relieved. Consequently, a reduction in the fluid pressure required to initiate an hydraulic or gas-induced fracture during subsequent injection activity is achieved. The initiation of hydraulic fractures from a plurality of perforation tunnels arranged in different directions around the wellbore wherein a high percentage of the tunnels are free from obstruction minimizes the risk of near-wellbore pressure losses and tortuosity of the created fracture, reducing the amount of hydraulic horsepower required to effect a fracture stimulation. This increases the probability that the stimulation treatment can be executed to completion without risk of exceeding equipment limitations or encountering catastrophic loss of injectivity due to solids bridging (known as screenout).
Clean perforation tunnels in carbonate formations are conducive to the evolution of a single, deep wormhole during acidization whereas inadequately cleaned tunnels tend to result in shallower, branched wormholes delivering a relatively lower stimulation effect. Therefore, a high percentage of unobstructed tunnels is also beneficial to the acid stimulation of carbonate formations, or the injection of acid into carbonate rocks under conditions conducive to the creation of wormholes, for stimulations of the near-wellbore. Further beneficial injections are discussed below.
The improved method for perforating a well for the enhancement of injection activities and stimulation of oil and gas production seen in
As used herein, an explosive event is meant to include an induced impact event such as one caused by one or more powders used for blasting, any chemical compounds, mixtures and/or other detonating agents or any device that contains any oxidizing and combustible units, or other ingredients in such proportions, quantities, or packing that ignition by fire, heat, electrical sparks, friction, percussion, concussion, or by detonation of the compound, mixture, or device or any part thereof causes an explosion, or release of energy.
Preferably, at least one fracture is produced at the end of at least one perforation tunnel. As used herein, a fracture is an induced separation of the hydrocarbon-bearing formation extending a short distance from the tunnel that remains wholly or partially open due to displacement of the rock fabric or as a result of being propped open by rock debris.
The primary method for characterizing the near-wellbore region in order to compare the efficacy of the new and conventional perforating systems is a step rate test, carried out during a mini-frac (also known as a data frac) prior to the main stimulation treatment. The mini-frac is used to obtain a direct measurement of formation properties such as the breakdown gradient and fluid leak-off coefficient, so that the treatment design can be fine-tuned prior to execution. The step rate test involves pumping a constant fluid into the well at several distinct rates while measuring pump pressure. By combining this information with the other parameters calculated as a result of the mini-frac, near-wellbore pressure losses, perforation friction, and the number of open perforations can each be estimated.
Using the equation below, perforation friction pressure is predicted as a function of rate, the number of perforations taking fluid, the diameter of each perforation (obtained from manufacturers' surface tests), and the discharge coefficient. The discharge coefficient may be estimated from the perforation diameter, assuming a round perforation, or measured empirically during tests at surface.
Ppf=[1.975q2ρf]/CD2Np2dp4
where Ppf=Perforation friction pressure (in psi); q=Total pump rate; ρf=Slurry density; CD=Perforation discharge coefficient; Np=Number of open perforations; and dp=Perforation diameter. Predicted pump pressure is plotted against measured pump pressure at each of the test rates. Since the other variables are essentially constant, the number of open perforations and the discharge coefficient can be iteratively adjusted until a good match is obtained between predicted and measured values.
In this example, two wells completed at a depth of approximately 2,500 m in the Rock Creek sandstone formation in West Pembina were analyzed. Problems with excessive breakdown pressures are occasionally encountered in the wells of this area during perforation and hydraulic fracturing due to inadequate clean out of tunnels, resulting in tortuous paths, as described above with reference to
Since step-rate test interpretation involves iterative matching of a model to the field data, the results are dependent on the quality of data gathered and subject to a certain amount of engineering judgment. However, consistent application of the same methodology has confirmed similar results across multiple pairs of wells in the region and elsewhere.
To further examine the impact of perforating with the new charges on hydraulic fracture treatment, an analysis has been conducted of treating power requirements against treating rate in the Cadomin formation, where elevated requirements for hydraulic horsepower historically increase the risk of equipment failure and incomplete treatment execution.
Returning to the discussion of the present method and induction of the second explosive event or local reaction, in one embodiment, the elimination of a substantial portion of the crushed zone of the tunnel is created by inducing one or more strong exothermic reactive effects to generate near-instantaneous overpressure within and around the tunnel following the detonation of the shaped charges and creation of one or more perforation tunnels, the reactive effects can be produced by shaped charges having a liner manufactured partly or entirely from materials that will react inside the perforation tunnel, either in isolation, with each other, or with components of the formation. In one embodiment, the shaped charges comprise a liner that contains a metal, which is propelled by a high explosive, projecting the metal in its molten state into the perforation created by the shaped charge jet. The molten metal is then forced to react with water that also enters the perforation, creating a reaction locally within the perforation. For example, reactive shaped charges, suitable for the present invention are disclosed by in U.S. Pat. No. 7,393,423 to Liu, the technical disclosures of which are both hereby incorporated herein by reference. Liu discloses shaped charges having a liner that contains aluminum, propelled by a high explosive such as RDX or its mixture with aluminum powder. Another shaped charge disclosed by Liu comprises a liner of energetic material such as a mixture of aluminum powder and a metal oxide. Thus, the detonation of high explosives or the combustion of the fuel-oxidizer mixture creates a first explosion, which propels aluminum in its molten state into the perforation to induce a secondary aluminum-water reaction within micro seconds.
In a second embodiment, the shaped charges comprise a liner having a controlled amount of bimetallic composition which undergoes an exothermic intermetallic reaction. In another embodiment, the liner is comprised of one or more metals that produce an exothermic reaction after detonation. For example, U.S. Patent Application Publication No. 2007/0056462 to Bates et al., the technical disclosures of which are both hereby incorporated herein by reference, disclose a reactive shaped charge, shown in
Without being bounded by theory,
Since every reactive shaped charge independently conveys a discrete quantity of reactive material into its tunnel, the cleanup of any particular tunnel is not affected by the others. The effectiveness of cleanup is thus independent of the prevailing rock lithology or permeability at the point of penetration. Consequently, a very high perforation efficiency is achieved, theoretically approaching 100% of the total holes perforated, within which the clean tunnel depth will be equal to the total depth of penetration (since compacted fill is removed from the tunnel). Tunnels perforated are highly conducive to injection under fracturing conditions for disposal and stimulation purposes, with uniformity of distribution of the injection fluid across perforation intervals. The present invention has been successfully applied in wells with <0.001 mD up to >100 mD permeability.
By substantially eliminating the crushed zone, reactive perforators shot into moderate to hard rock under realistic confining stress increase the quality of the tunnel and yield a number of benefits for injection stimulation. The removal of the crushed zone results in a very high percentage of unobstructed tunnels, which in turn results in: an increased rate of injection at a given injection pressure; a reduced injection pressure at a given injection rate; a reduced injection rate per open perforation (less erosion); an improved distribution of injected fluids across the perforated interval; a reduced propensity for catastrophic loss of injectivity due to solids bridging (screen out) during long periods of slurry disposal or during proppant-bearing stages of an hydraulic fracture stimulation; the minimization of near-wellbore pressure losses; and an improved predictability of the outflow area created by a given number of shaped charges (of specific value to limited entry perforation for outflow distribution control). As little as a 10% increase in injection rate during fracture stimulation is known to create a sufficient improvement in fracture geometry for a valuable increase in well productivity to occur. As a result of removing the residual stress cage around the tunnel, fracture initiation pressures can be significantly lowered. This reduction is particularly advantageous and valuable to well operators as stimulation service providers typically charge according to the amount of hydraulic horsepower applied and the peak pressure applied during a treatment. In addition, lower pressures result in less risk of equipment damages, less wear-and-tear, and lower maintenance costs. In some cases, fracture initiation pressures can be lowered to the point where a formation that could not previously be fractured using conventional wellsite equipment can now be fractured satisfactorily for enhanced injection activities.
The benefits of the present invention and the enhanced injection activities it provides for are numerous. Among those are the enhancement of injection activities directed to water-based or oil-based fluids and slurries for disposal, under matrix injection conditions or under fracturing conditions; the injection of gas for disposal; the injection of water for voidage replacement and/or reservoir pressure maintenance, under matrix injection conditions or under fracturing conditions; the injection of gas for voidage replacement and/or reservoir pressure maintenance; the injection of water-based or oil based fluids for stimulation of the near-wellbore rock matrix, such as brines, acids, bases, gels, emulsions, enzymes, chemical breakers, and polymers. As used herein, matrix injections refer to injections below the pressure at which the formation breaks and a fracture is created, thereby causing fluid to flow into a pore space (rock matrix). Fracturing conditions are meant to refer to injections above the pressure at which formation breaks and a fracture is created and propagated, thereby resulting in fluid predominantly flowing into the created fracture.
Using the method of the present invention, injection of water-based or oil-based fluids is also beneficially used to enhance the sweep of hydrocarbons from the reservoir and increase oil recovery, such as treated water, steam, gels, emulsions, enzymes, active microbial cultures, surfactants, and polymers. Moreover, the method provides for further injection of water-based or oil-based fluids at rates and pressures sufficient to propagate hydraulic fractures (for example, rates may range from <1 to 200 bbl/min and pressures may range from <1000 to 30,000 psi), on occasion including a solid phase that will be transported into the created fracture so as to maintain the conductivity of the fracture after injection has ceased. In addition, the method provides for the injection of gases at rates and pressures sufficient to induce fracture creation for the purpose of enhancing the inflow or outflow potential of the well, such gases being injected from the surface or generated in the wellbore by the combustion of propellants or other gas-generating material concurrent with, or at some time after, the perforating event. Finally, the present invention enhances the distribution of injection points along the wellbore, and the provision of injection points providing a specific flow area at said points along the wellbore, for the purpose of controlling the outflow distribution of injected fluid along the wellbore.
The Upper Devonian sequence in Pennsylvania constitutes one of the most complex sequences of rocks in the Appalachian basin. This region comprises interbedded conglomerates, sandstones, siltstones and shales. Of the commonly targeted intervals, the wells of the Bayard and Fifth sands are notoriously difficult to complete in certain areas. High fracture initiation and treating pressures are a common occurrence, often resulting in negligible propped fracture creation and correspondingly poor productivity. The Bayard consists of up to three fine-grained sandstones separated by thin shale breaks. The sands range from 3 to 35 feet in thickness and are recognized as important gas reservoirs. Wells encountering well-developed Bayard have tested up to 3 min mcf/d from this zone. The Fifth sand is a persistent and important rock sequence, responsible for both oil and gas production in the area. In gas prone areas, the Fifth tends to be multi-layered, fine- to coarse-grained sandstone containing conglomeratic streaks and lenses. The zone as a whole varies from under 10 feet to over 40 feet thick.
A variety of completion techniques have been attempted on these two zones, starting with drilling fluid and cement designs that minimize filtrate loss—since fluid loss appears to correlate with difficulties breaking the formation. One of the more commonly applied techniques has been to open hole fracture the Bayard and Fifth before running casing to complete deeper intervals. While occasionally successful, the incremental cost of separate fracturing operations jeopardizes well economics. Several different acid recipes have also been investigated to help overcome breakdown difficulties. Other intervals in the area are typically treated with 12-3 HCl/HF ahead of the fracturing fluid, but laboratory studies showed that this combination creates an insoluble precipitate when applied to samples from the Bayard and Fifth. 25% hydrochloric acid has subsequently become the default acid for these zones.
By delivering clean, open tunnels with fractured tunnel tips, the method of the present invention helps reduce breakdown and treating pressures—often enabling fracture stimulation of zones that were considered untreatable. The method of the present invention was applied on four wells and fracturing performance was subsequently compared to seven offset wells perforated with conventional charges in close geographic proximity. All four wells encountered Bayard reservoir although in the third well it was only 4 feet thick. Three of the four wells encountered Fifth sand sufficient for completion. Significant reductions in breakdown and treating pressures were observed in both zones. Treating rates were dramatically improved, allowing for the pumping away of as much proppant as was available on location. Based on the results that follow, operators in these regions can plan larger fracture treatments for these zones in future wells.
As shown in
Even though the figures described above have depicted all of the explosive charge receiving areas as having uniform size, it is understood by those skilled in the art that, depending on the specific application, it may be desirable to have different sized explosive charges in the perforating gun. It is also understood by those skilled in the art that several variations can be made in the foregoing without departing from the scope of the invention. For example, the particular location of the explosive charges can be varied within the scope of the invention. Also, the particular techniques that can be used to fire the explosive charges within the scope of the invention are conventional in the industry and understood by those skilled in the art.
It will now be evident to those skilled in the art that there has been described herein an improved perforating method that reduces the amount of debris left in the perforations in the hydrocarbon bearing formation after the perforating gun is fired and enhances injection activities in the production of oil and gas. Although the invention hereof has been described by way of preferred embodiments, it will be evident that other adaptations and modifications can be employed without departing from the spirit and scope thereof. The terms and expressions employed herein have been used as terms of description and not of limitation; and thus, there is no intent of excluding equivalents, but on the contrary it is intended to cover any and all equivalents that may be employed without departing from the spirit and scope of the invention.
This application is a continuation of and claims priority from U.S. application Ser. No. 12/627,693 filed Nov. 30, 2009, which is a non-provisional application of Provisional Application No. 61/118,992, filed Dec. 1, 2008, the disclosures of which are herein incorporated by reference.
Number | Name | Date | Kind |
---|---|---|---|
3188955 | Brown | Jun 1965 | A |
3235005 | Delacour | Feb 1966 | A |
3983941 | Fitch | Oct 1976 | A |
4078612 | Gallus | Mar 1978 | A |
4107057 | Dill et al. | Aug 1978 | A |
4220205 | Coursen et al. | Sep 1980 | A |
4372384 | Kinney | Feb 1983 | A |
5318128 | Johnson et al. | Jun 1994 | A |
5551344 | Couet et al. | Sep 1996 | A |
5567906 | Reese et al. | Oct 1996 | A |
6336506 | Wesson | Jan 2002 | B2 |
6386288 | Snider et al. | May 2002 | B1 |
6598682 | Johnson et al. | Jul 2003 | B2 |
6962203 | Funchess | Nov 2005 | B2 |
7036594 | Walton et al. | May 2006 | B2 |
7165614 | Bond | Jan 2007 | B1 |
7278354 | Langan | Oct 2007 | B1 |
7393423 | Liu | Jul 2008 | B2 |
7712416 | Pratt et al. | May 2010 | B2 |
7775279 | Marya et al. | Aug 2010 | B2 |
8544563 | Bourne et al. | Oct 2013 | B2 |
9080431 | Bell et al. | Jul 2015 | B2 |
20030037692 | Liu | Feb 2003 | A1 |
20030089498 | Johnson et al. | May 2003 | A1 |
20040089449 | Walton et al. | May 2004 | A1 |
20050056459 | Haney et al. | Mar 2005 | A1 |
20050115448 | Pratt et al. | Jun 2005 | A1 |
20060118301 | East et al. | Jun 2006 | A1 |
20060266551 | Yang et al. | Nov 2006 | A1 |
20070056462 | Bates et al. | Mar 2007 | A1 |
20080230225 | Meddes et al. | Sep 2008 | A1 |
20080271894 | Hill et al. | Nov 2008 | A1 |
20080282924 | Saenger | Nov 2008 | A1 |
20100132946 | Bell et al. | Jun 2010 | A1 |
Number | Date | Country |
---|---|---|
10200559934 | Aug 2006 | DE |
03042625 | May 2003 | WO |
2005035939 | Apr 2005 | WO |
2008102110 | Aug 2008 | WO |
Entry |
---|
DYNAenergetics Flyer “Don't Miss Out on Improved Perforation!” (4 pages). |
American Petroleum Instatute Registered Data Sheet Perforating System Evaluation, API RP 19B Section 1 Spreadsheet for DYNAenergetics (1 pages). |
Connex Perforating “ReActive Perforating Technology” 2008 GEODynamics, Inc. (9 pages). |
Power Point Presentation entitled “Technology/Product Preview” dated Apr. 30, 2007 by GEODynamics (35 pages). |
GEODynamics Engineered Perforating Solutions, 2009 GEODynamics Inc., Client Spotlight, Jul. 2009. |
GEODynamics Engineered Perforating Solutions, Oct. 2008. GEODynamics, Inc., CONNEX Perforating, ReActive Perforating Technology. |
Bell, Hardesty, and Clark, “Reactive Perforating: Conventional and Unconventional Applications, Learnings, and Opportunities,” SPE 122174, 2009 Society of Petroleum Engineers, May 27, 2009. |
Bell and Cuthill, “Next-Generation Perforating System Enhances the Testing and Treatment of Fracture Stimulated Wells in Canada,” SPE 116226, 2008, Society of Petroleum Engineers, Sep. 21, 2008. |
Denney, “Technology Applications,” JPT Online, Jul. 2007, located at http://www.spe.org/spe-app/spe/jpt/2007/07/TechApps.htm, downloaded Nov. 28, 2009. |
Yang, et al. “Flow Performance of Perforation Tunnels Created With Shaped Charges Using Reactive Liner Technology”, SPE 121931, SPE International, Society of Petroleum Engineers, 2009, pp. 1-17. |
Wade et al. “Field Tests Indicate New Perforating Devices Improve Efficiency in Casing Completion Operations” Schlumberger Well Surveying Corp. Oct. 1962, pp. 1069-1073. |
GEODynamics “Technology/Product Preview” Presentation at OCT Luncheon by Wesson and Bell, presented Apr. 30, 2007 (35 pages). |
DynaEnergetics' 26g DPEX St HMX Shaped Charge, Sep. 2007 (4 pages). |
Bartz et al., “Let's Get the Most Out of Existing Wells”, Oilfield Review, pp. 2-21 (1997). |
Number | Date | Country | |
---|---|---|---|
20160341018 A1 | Nov 2016 | US |
Number | Date | Country | |
---|---|---|---|
61118992 | Dec 2008 | US |
Number | Date | Country | |
---|---|---|---|
Parent | 12627693 | Nov 2009 | US |
Child | 15180614 | US |