Claims
- 1. A process for the preparation of a molded tile product, said process comprising the steps of:
- (a) (i) preparing a first composition suitable to provide a first foamed phosphate ceramic material when permitted to foam, said first composition comprising calcium silicate, phosphoric acid, a metal oxide and a carbonate foaming agent;
- (ii) diposing a layer of said first composition on a releasable support surface, said support surface comprising regions which are suitable to selectively provide an open-celled character to a first foamed layer as said first composition is permitted to foam;
- (iii) providing an edge frame suitable to engage with said support surface to create a mold cavity suitable for the preparation of a molded tile, the surface of said edge frame being composed of a material which will provide a closed-celled character to the edges of a molded tile prepared within said frame, said edge frame selectively providing edge detail to said tile;
- (iv) permitting said first composition to foam and cure in said cavity to form a first foamed layer;
- (b) (i) preparing a second composition suitable to provide a second foamed phosphate ceramic material, said second composition comprising calcium silicate, phosphoric acid, a metal oxide and a carbonate foaming agent, the components of said second composition being selected such that the second foamed ceramic material will be more dense than said first foamed ceramic material;
- (ii) disposing a layer of said second composition over said first foamed layer in said cavity;
- (iii) providing a cover for said cavity, said cover comprising a release coating material which is suitable to provide a closed-celled character to a second foamed layer when said second layer is permitted to foam in contact with said cover;
- (iv) permitting said second composition to foam and cure under self-induced pressure in said cavity so as to be in substantial contact with said cover and said frame, to form a second foamed layer, whereby said second foamed layer is provided with a closed-celled character and a higher density tnan said first foamed layer; and,
- (c) demolding the cured tile.
- 2. The process as set forth in claim 1 hereof comprising the additional step of post-heating the cured tile.
- 3. The process as set forth in claim 2 hereof wherein said post-heating is achieved within one hour after curing.
- 4. The process as set forth in claim 2 hereof wherein said post-heating is achieved within not more than three hours after curing.
- 5. The process as set forth in claim 2 hereof wherein said post-heating is achieved at not less than about 150.degree. C.
- 6. The process as set forth in claim 1 hereof wherein said first and second layer have substantially the same chemical composition.
- 7. The process as set forth in claim 1 hereof wherein said first and second foamed layer have different chemical compositions.
CROSS-REFERENCE TO RELATED APPLICATION
This is a division, of application Ser. No. 750,187, filed July 7, 1985, now U.S. Pat. No. 4,619,860.
US Referenced Citations (8)
Divisions (1)
|
Number |
Date |
Country |
Parent |
750187 |
Jul 1985 |
|