(1) Field of the Invention
The present invention is directed to underwater based electric energy production systems. In particular, the present invention is directed to a system for generating power from a lead zirconate titanate sonar transducer.
(2) Description of the Prior Art
The main mission for a long sonar transducer is the generation of certain acoustic tones in the ocean. One feature of lead zirconate titanate material is the voltage generation produced when this material is stressed. By taking advantage of this material property, the prospect exists for a long lead zirconate titanate transducer to become a power harvesting unit in an extended life capacity. By creating a trickle charging device, the mission life of dipping sonar or an airdropped transceiver could be extended. What is needed is a long transducer between ten and three hundred meters long, for environmental energy transfer that acquires energy from the ocean waves by bobbing on the water surface with a buoy and anchor system that vibrates at the strumming frequency generated by underwater currents thereby generating power, wherein the power can then be regulated by an alternating current to direct current converter and voltage regulator and captured by charging a battery such as a nickel cadmium battery.
It is a general purpose and object of the present invention to generate power from a sonar transducer that has a long lead zirconate titanate core within a cable such as an armored cable used in towed array systems.
The above object is accomplished with the present invention through the use of a long lead zirconate titanate cable for underwater environmental energy transfer, which acquires energy from the underwater currents by surrounding the long lead zirconate titanate cable with an armored cable and attaching it to a buoy and anchor system. As the buoy bobs on the water the lead zirconate titanate core experiences vibrations from underwater currents. These vibrations cause the lead zirconate titanate core to generate electrical power that is captured and regulated.
A more complete understanding of the invention and many of the attendant advantages thereto will be more readily appreciated by referring to the following detailed description when considered in conjunction with the accompanying drawings, wherein like reference numerals refer to like parts and wherein:
Referring to
A vibrating string contains both kinetic and potential energies. The total amount of energy for a string vibrating at frequency ωn is expressed in equations (1a) and (1b) below:
Equation (1a) is a simplification of the kinetic and potential energy per unit length of the string. The amplitude An is the integration of the cosine terms associated with the solution at the nth frequency. The amplitude Bn is associated with the nth solution of the sine term. The mass per unit length is ρL where L is the length of the string. In equation (1b), the modal energies, En, of equation (1a) are summed for all modes N to obtain the total energy, ET, associated with the string's vibration. The derivation assumes small strains for each element of the string. Therefore, an elastic material with large deflections like a rubber band could not utilize equations (1a) and (1b).
While equations (1a) and (1b) characterize the approximate mechanical energy for a string, the following equations calculate the energy translated into electrical energy. To calculate the estimated energy transfer the constitutive equations for material strain and its dielectric properties are computed from the following equations.
S=s·T (2a)
D=ε·E (2b)
The strains constitutive equation, (2a), is derived from Hooke's Law, but expressed in the inverse form where S is strain, s is compliance and T is stress. In the dielectric equivalent form equation, (2b), D is charge density, ε is permittivity, and ·E is electric field. The constitutive equations are combined to from new equations, which represent the coupled constitutive equations for linear piezoelectric materials:
S=SET+dE (3a)
D=dT+εTE (3b)
One of the coupling terms is the compliance (sE) of the material, which is the inverse of the modulus of elasticity. The piezoelectric constant (d) corresponds to the sensitivity of the material. The permittivity of the material is represented by εT. These coupling terms establish the relationships to compute the mechanical to electrical energy conversion for a piezoelectric system. To obtain the coupling efficiency of a mechanical to electrical energy conversion for a vibrating structure the following equation is used:
Where k is the coupling factor for the stored mechanical energy over the input electrical energy.
This invention is a system that keeps a long lead zirconate titanate core 14 within an armored cable 16 in such tension that the fixed string equation and boundary conditions described above are sufficient to describe the modes and energy generation within the cable. The total energy computation considers the tension, cross-sectional area, current speed, and wave periodicity to describe the amount of power potentially available from the system. In general, the total energy increases with frequency, although, very high modes in the kilohertz (kHz) range are associated with decreasing energy. Environmental conditions producing such high frequencies are unlikely within typical sea states. The combination of more tension, relatively higher modes, and complicated mixed modes generates power that can then be regulated by an alternating current to direct current converter 20 and voltage regulator 22 and captured by charging a battery 24 such as a nickel cadmium battery that can power a low powered sensor suite 38.
In one embodiment, the present invention only needs to produce one watt of power or less to function. Microprocessor and data acquisition board combinations 26 often operate at 200 mW. Since the present invention is not a stand alone device, it may also function for several days in the same general location performing its mission as a long transducer array. For example, approximately 0.5 W of power are consumed in a two second interval. After frictional losses and unforeseen conditions the power could drop to 5 mW, which is two orders of magnitude. An hour mission in environmental conditions with the same physical loads would generate 9 W despite these additional losses. In one embodiment, the microprocessor and data acquisition board combinations 26 are a GUMSTIX® computer, which operates with approximately 1.0 W load with a standard electronics configuration. Therefore, data acquisition can be performed by the GUMSTIX® until the cyclical loading damages the rechargeable battery 24 or during a long duration of stagnant ocean. In addition, with the remaining wattage available, less than 1.0 W of power could be used for radio frequency transmission from a radio 28, such as a 900 MHz radio, so that information gathered by the GUMSTIX® computer can be transmitted off of the system 18.
After deploying the apparatus in the configuration illustrated in
The method of operation of the apparatus of the present invention based on the above stated intention to maintain a sufficient amount of power generation comprises the following steps. The first step of the method is to take a periodic measurement the speed U of the water current flowing over the diameter D of cable 16. This measurement can be taken by the velocity sensor 30 and relayed to the processor 26. If the velocity is within the range of the predetermined sea state, then no further action needs to be taken. After a specified period of time another periodic measurement is taken. If the velocity is determined by processor 26 to be outside of the range of a predetermined sea state, then the next step is for the processor 26 to associate a strum frequency fs with the current flowing over the diameter of cable 16 according to the following equation:
fs=StrU/D (5)
where the Str variable refers to Strouhal's number, which is derived from the Reynold's number Re. The Reynold's number is shown by Equation (6):
Re=UD/v (6)
The variable U stands for velocity current or flow across a diameter D of the cable 16, and v is the kinematic viscosity. These fluid dynamic constants are common terms used to describe flow over a surface.
The next step is for the processor to substitute fs as ωn in equations (1a) and (1b) above to get determinative energy associated with the strum that is the main overall frequency mode that cable 16 is in. The next step is for processor 26 to solve for ET, which indicates the energy being produced by the system 18 at the time of the water current measurement. Based on the value of ET processor 26 determines if a sufficient amount of power is being generated to accomplish a specified task, for example the operation of a GUMSTIX® computer, which operates with approximately 1.0 W load as mentioned above. If the determination indicates that there is an insufficient amount of power then the tension in the cable 16 is incrementally adjusted by adding water into the reservoir 34 in the anchor 12. In one embodiment, the water can be added by having valve 32 electro-mechanically actuated by a control signal from processor 26. These method steps are repeated periodically to keep the system 18 tuned to the surrounding underwater environment.
The advantage of the present invention is that the lead zirconate titanate core material for a cable could operate as a sensor, transducer, and an energy generation source. By combining the appropriate electronics, this invention allows for the possibility of a sonar array, which makes it a multi-functional self powered sensor. Additionally, the present invention offers the possibility to support a distributed network system infrastructure by extending the operation life of a multi-functional sensor suite.
While it is apparent that the illustrative embodiments of the invention disclosed herein fulfill the objectives of the present invention, it is appreciated that numerous modifications and other embodiments may be devised by those skilled in the art. Additionally, feature(s) and/or element(s) from any embodiment may be used singly or in combination with other embodiment(s). Therefore, it will be understood that the appended claims are intended to cover all such modifications and embodiments, which would come within the spirit and scope of the present invention.
This application is a divisional of prior U.S. patent application Ser. No. 12/683,503 filed on 7 Jan. 2010 now U.S. Pat. No. 8,274,167 and claims the benefit under 35 U.S.C. §121 of the prior application's filing date. This patent application is with the following related U.S. patent application Ser. No. 12/683,503 by the same inventor, Derke R. Hughes.
The invention described herein may be manufactured and used by or for the Government of the United States of America for governmental purposes without the payment of any royalties thereon or therefore.
Number | Name | Date | Kind |
---|---|---|---|
4486869 | Carter | Dec 1984 | A |
6580177 | Hagood et al. | Jun 2003 | B1 |
7242107 | Dempster | Jul 2007 | B1 |
7429801 | Adamson et al. | Sep 2008 | B2 |
7908928 | Vik et al. | Mar 2011 | B2 |
8274167 | Hughes | Sep 2012 | B1 |
Number | Date | Country | |
---|---|---|---|
20120268083 A1 | Oct 2012 | US |
Number | Date | Country | |
---|---|---|---|
Parent | 12683503 | Jan 2010 | US |
Child | 13539642 | US |