The present invention relates to a method for welding a steel pipe in a steel pipe structure and a joint.
Steel pipes can be joined via joints so as to extend longer than a single steel pipe. Typically, steel pipes are linearly joined via joints. At some installation sites of the steel pipes, however, slightly bent steel pipes may need to be joined instead of linearly joined steel pipes, and thus joints for this purpose are also proposed (for example, see Patent Literature 1). A joint described in Patent Literature 1 is configured such that a pipe end attached at a certain angle of inclination to the outer periphery of an end of a steel pipe (pipe) can be received while being inclined at the angle.
The joint described in Patent Literature 1 attempts configuration such that the inclination of the steel pipe and the joint is adjusted with bolts and nuts to an angle up to twice as large as the angle at the installation site of the steel pipe. This adjustment is made to absorb the manufacturing error and the installation error of the steel pipe. Thus, the joint absorbs the manufacturing error and the like using the bolts and nuts instead of welding in a proper positional relationship with the steel pipe. For this reason, in the welding of the steel pipe and the joint, the steel pipe and the joint are uniformly inclined at the angle regardless of the manufacturing error. Hence, if the steel pipe has a large manufacturing error or the like, the steel pipe and the joint are disadvantageously welded in an improper positional relationship.
An object of the present invention is to provide a method for welding a steel pipe in a steel pipe structure and a joint so as to enable the steel pipe and the joint to be welded in a proper positional relationship.
In order to solve the problem, a method for welding a steel pipe in a steel pipe structure and a joint according to a first invention is a method for welding a steel pipe in a steel pipe structure and a joint,
the method including:
a measurement step of measuring the manufacturing error of the steel pipe in the steel pipe structure;
a calculation step of calculating the positions of the steel pipe and the joint where the manufacturing error measured in the measurement step is absorbed; and
a welding step of welding the steel pipe and the joint at the positions of the steel pipe and the joint, the positions being calculated in the calculation step.
In a method for welding a steel pipe in a steel pipe structure and a joint according to a second invention, in the method for welding the steel pipe in the steel pipe structure and the joint according to the first invention, the calculated positions of the steel pipe and the joint in the calculation step are a predetermined angle for inclining the joint from a design position and the insertion amount of the steel pipe into the joint inclined at the predetermined angle.
In a method for welding a steel pipe in a steel pipe structure and a joint according to a third invention, in the method for welding the steel pipe in the steel pipe structure and the joint according to the second invention, the predetermined angle is calculated based on a manufacturing error in a direction perpendicular to the axis of the steel pipe at the design position.
In a method for welding a steel pipe in a steel pipe structure and a joint according to a fourth invention, in the method for welding the steel pipe in the steel pipe structure and the joint according to the second or third invention, the insertion amount of the steel pipe into the joint inclined at the predetermined angle is calculated based on the predetermined angle, manufacturing error in a direction perpendicular to an axis of the steel pipe at the design position, and a manufacturing error in a direction parallel to the axis of the steel pipe at the design position.
According to the method for welding the steel pipe in the steel pipe structure and the joint, the positions of the steel pipe and the joint where the manufacturing error is absorbed are calculated before welding, and then the steel pipe and the joint are welded at the positions, thereby welding the steel pipe and the joint in a proper positional relationship.
A method for welding a steel pipe in a steel pipe structure and a joint according to an embodiment of the present invention will be described below. As shown in
First, the connecting steel pipe structure 1 will be schematically described with reference to the drawing.
As shown in
The steel pipe structures 2 and 3 each include multiple short steel pipes 10 radially welded with all the axes directed to a point (hereinafter will be referred to as a panel point R). Thus, in the steel pipe structures 2 and 3, the multiple short steel pipes 10 constituting the steel pipe structures have extremely complicated weld lines. This inevitably causes manufacturing errors in the steel pipe structures 2 and 3 and the steel pipes 10 constituting the steel pipe structures
As shown in
A method for manufacturing the connecting steel pipe structure 1 will be described below.
First, in a factory, the steel pipe 10 in the steel pipe structure 2 or 3 is inserted into the joint 20, and then the steel pipe 10 and the joint 20 (specifically, the first flange 21) are welded to each other. After the two steel pipe structures 2 and 3 are prepared with the joints 20 welded to the steel pipes 10, for example, the steel pipe structures 2 and 3 are installed at precise positions. During the installation, one end of the connecting steel pipe 4 is inserted into the joint 20 welded to the steel pipe 10 in the steel pipe structure 3 and the other end of the connecting steel pipe 4 is inserted into the joint 20 welded to the steel pipe 10 in the other steel pipe structure 2. Then, the joints 20 (specifically, the second flanges 22) and both ends of the connecting steel pipe 4 are welded to manufacture the connecting steel pipe structure 1. Subsequently, the bolts and nuts 23 are removed from the joints 20 of the connecting steel pipe structure 1. This can disassemble the connecting steel pipe structure 1 into three kinds of parts, facilitating the transportation of the connecting steel pipe structure 1. The three kinds of parts are the (two) steel pipe structures 2 and 3 where the first flanges 21 are welded to the steel pipes 10, the connecting steel pipe 4 where the second flanges 22 are welded to both ends of the connecting steel pipe 4, and the bolts and nuts 23 that join the first flanges 21 and the second flanges 22. The tree kinds of parts are conveyed to the installation site of the connecting steel pipe structure 1. At the installation site, the parts of the two steel pipe structures 2 and 3 are installed at precise positions, the parts of the connecting steel pipe 4 are disposed between the parts of the steel pipe structures 2 and 3, and the first flanges 21 and the second flanges 22 are joined with the bolts and nuts 23. Thus, the connecting steel pipe structure 1 can be assembled at the installation site with substantially the same precision as in the factory.
A method for welding the steel pipe 10 in the steel pipe structure 3 and the joint 20, that is, a method for welding the steel pipe 10 and the joint 20 in the method for manufacturing the connecting steel pipe structure 1 will be described below.
As has been discussed, the steel pipe structure 3 and the steel pipe 10 have a manufacturing error. Thus, as shown in
In the measurement step, the positions of multiple points on one end of the steel pipe 10 in the steel pipe structure 3 are measured by a 3D measuring instrument. The points are optionally selected. For example, the points preferably include points selected at equal intervals on the outer periphery of the steel pipe 10 for precision. As shown in
In the calculation step, the predetermined angle θ for inclining the joint 20 from the design position and the insertion amounts of the steel pipe 10 into the joint 20 at the points a to d are calculated, based on the displacements dz(a) to dz(d) in the Z direction at the points a to d and the displacements dx and dy in the XY direction at the point o that are measured in the measurement step.
Specifically, as shown in
In the welding step, according to the predetermined angle θ and the precise insertion amounts that are calculated in the calculation step, the joint 20 is inclined from the design position, the steel pipe 10 in the steel pipe structure 3 is inserted into the joint 20, and then the steel pipe 10 and the joint 20 are welded after being combined. In this welding, a gap between the steel pipe 10 and the joint 20 is filled with weld beads if necessary.
Referring to the flowchart of
In this welding method, as shown in
Hence, according to the method for welding the steel pipe 10 in the steel pipe structure 3 and the joint 20, the positions of the steel pipe 10 and the joint 20 are calculated before welding so as to absorb the manufacturing error. Thus, the steel pipe 10 and the joint 20 welded at the calculated positions can have a proper positional relationship.
The positions calculated before welding are the predetermined angle θ for inclining the joint 20 from the design position and the insertion amount of the steel pipe 10 into the joint 20 inclined at the predetermined angle θ. Thus, the steel pipe 10 and the joint 20 can be easily adjusted to these positions so as to enable welding in a more proper positional relationship.
The predetermined angle θ is calculated based on the maximum displacement p in the XY direction at the point o, thereby more properly calculating the positions before welding. Thus, the steel pipe 10 and the joint 20 can be welded in a more proper positional relationship.
Additionally, the insertion amount of the steel pipe 10 into the joint 20 inclined at the predetermined angle θ is calculated based on the predetermined angle θ, the maximum displacement p, and the displacements in the Z direction at the multiple points on one end of the steel pipe 10, thereby more properly calculating the positions before welding. Thus, the steel pipe 10 and the joint 20 can be welded in a more proper positional relationship.
In the present embodiment, the steel pipe structures 2 and 3 include the multiple short steel pipes 10 that are radially welded. Any structure may be used as long as the structure has the steel pipe 10 to be welded to the joint 20.
In the present embodiment, the joint 20 is a slip-on flange. Any joint may be used as long as the steel pipe 10 in the steel pipe structure 2 or 3 is inserted and welded from one side of the joint 20 while being inclined so as to absorb the manufacturing error, and the steel pipe 10 on one side can be joined to a steel structure on the other side.
Furthermore, in the present embodiment, the length L ranges from the panel point R in the other steel pipe structure to the design position of the point o. The length L may range from another point in the Z direction passing through the panel point R to the design position of the point o.
Number | Date | Country | Kind |
---|---|---|---|
2016-046389 | Mar 2016 | JP | national |
Filing Document | Filing Date | Country | Kind |
---|---|---|---|
PCT/JP2016/088674 | 12/26/2016 | WO | 00 |