The object of the invention is a method in the manufacture of an elevator, which elevator is preferably an elevator applicable to passenger transport and/or to freight transport and to be installed in a building.
In connection with so-called jump-lifts, the bottom part of an elevator hoistway is taken into use already before the building has been completed. In this case the top part of the elevator hoistway can be constructed at the same time as an elevator moving in the bottom part of the elevator hoistway already serves people on the lower floors of the building. Generally in jump-lifts the elevator car moving in the lower parts of the elevator hoistway is supported and moved during construction-time use with a hoisting machine supported on a platform in the elevator hoistway. The installation work in the parts of the elevator hoistway above this machine room platform is performed from a movable platform or corresponding in the elevator hoistway, which installation work comprises, among other things, the installation of guide rails and electrification in the elevator hoistway. When the elevator hoistway under construction above the machine room platform has reached a sufficient stage of completion, the completed part of the elevator hoistway can be taken into use. In this case a jump-lift is performed, wherein the machine room platform is raised to a higher level in the elevator hoistway. A worksite crane used in the construction of the building has conventionally been used for the lifting. One problem with this type of arrangement is that the worksite crane is not always available when needed. Another problem is that the elevator hoistway must be open at its top end so that the hook of the worksite crane that is on the roof of the building can be lowered into the hoistway. When the elevator hoistway has reached its final height, a machine room has conventionally been built at the end of the elevator hoistway and after that the final machinery of the elevator has been brought there. Thus to support the final machinery it has been necessary to construct a structure above the elevator hoistway from scratch. Another problem has been that a separate final machinery has been needed in addition to the construction-time machinery. Otherwise the final phase would have been complex and slow to perform, and the time during which the elevator is out of use would be long.
The weight of the machine room platforms combined with the weight of the parts of the elevator supported by the machine room has increased owing to, among other things, buildings that are taller than before. Owing to the very great travel heights of modern elevators, the machine size and rope masses, among other things, are so great that the hoisting capacity needed to perform the last jump-lifts is large. For the same reason, the support needed for the lifting must be robustly made. Finding advantageous support, particularly in the final phase of the manufacturing process, has been a problem, and it has been necessary to use complex solutions or a worksite crane.
The aim of the invention is to eliminate the aforementioned drawbacks, among others, of prior-art solutions. More particularly the aim of the invention is to produce an improved method in the manufacture of an elevator. The aim of the invention is further to produce one or more of the following advantages, among others:
The invention is based on the concept that the parts of the construction-time (e.g. during jump-lifts) platform, more particularly its support structure, that supports the machinery of the elevator, are used for forming the structure that supports the machinery of the final machine room of the elevator (. In this case preferably also the construction-time machinery is transferred into the space reserved for the final machine room from a position disposed lower in the elevator hoistway, while being supported by the platform that supports the construction-time machinery, more particularly by the support structure of said platform. Some advantages, among others, are the speeding up of the process because the additional need for supporting support structures in the manufacturing of the machine room decreases, the need to disassemble a temporary machine room platform decreases, and the solution brings material savings.
In one basic embodiment of the concept according to the invention, in the method in the manufacture of an elevator the parts of the platform, more particularly its support structure, are used for forming the structure that supports the machinery of the final machine room of the elevator, which platform has earlier been in its position in a position disposed lower in the elevator hoistway, and which platform was used in the aforementioned lower disposed position for supporting the machinery. Some advantages, among others, are the speeding up of the process because the additional need for supporting support structures in the manufacturing of the machine room decreases, the need to disassemble a temporary machine room platform decreases, and the solution brings material savings.
In a more refined embodiment of the concept according to the invention in the method in the manufacture of an elevator the machinery for moving the elevator car is transferred into the space reserved for the final machine room from a position disposed lower in the elevator hoistway, while being supported by the platform that supports the machinery, more particularly by the support structure of said platform, and the parts of the platform, more particularly its support structure, that supports the machinery are used for forming the structure that supports the machinery of the final machine room of the elevator. The advantages are those mentioned above.
In a more refined embodiment of the concept according to the invention, which embodiment is preferably according to one or more of the embodiments presented in the preceding, when it is in the aforementioned lower position the machinery has been in its position in the elevator hoistway supported by the platform, more particularly by the support structure of said platform, and the machinery has been used to move the elevator car below it for serving passengers. One advantage is a more efficient conversion of the jump-lift into the final elevator than before.
In a more refined embodiment of the concept according to the invention, which embodiment is preferably according to one or more of the embodiments presented in the preceding, in the method the elevator is used for serving passengers before the final travel height of the elevator is reached, and in the method a platform that supports the machinery of the elevator is moved with a plurality of jump-lifts in progressive steps upwards in the elevator hoistway, and when the platform that supports the machinery has been moved to the top part of the elevator hoistway with the aforementioned plurality of jump-lifts, the machinery of the elevator is transferred into the space that is an extension of the elevator hoistway and is reserved for the final machine room of the elevator by lifting the aforementioned platform that supports the machinery, e.g. said platform being as it is or partly disassembled. One advantage is a more efficient conversion of the jump-lift into the final elevator than before.
In a more refined embodiment of the concept according to the invention, which embodiment is preferably according to one or more of the embodiments presented in the preceding, when the machinery has been transferred into the space reserved for the final machine room, the aforementioned platform that supports the machinery is supported in its position, and the structure that supports the machinery of the final machine room of the elevator is formed at least partly from the support structure of the platform. One advantage is a more efficient conversion of the jump-lift into the final elevator than before. The method is reliable and simple. It is not necessary to form from scratch a new and separate structure capable of the supporting, but instead the old structures can be used.
In a more refined embodiment of the concept according to the invention, which embodiment is preferably according to one or more of the embodiments presented in the preceding, the support structure is lifted through from the aperture leading into the space that is an extension of the elevator hoistway and is reserved for the final machine room, after which the support structure is lowered to rest on the load-bearing structures of the building, preferably to rest on the top surfaces comprised in the load-bearing structures. One advantage is a more efficient conversion of the jump-lift into the final elevator than before. The method is reliable and simple. It is not necessary to form from scratch a new and separate structure capable of the supporting, but instead the old structures can be used. By lifting this way, the machinery supported by the support structure comprised in the platform can at the same time be lifted into the space reserved for the final machine room. Nevertheless, the machinery does not necessarily need to be lifted at the same time.
In a more refined embodiment of the concept according to the invention, which embodiment is preferably according to one or more of the embodiments presented in the preceding, and the structure that supports the machinery of the final machine room of the elevator is formed at least partly from the support structure of the aforementioned platform that supports the machinery such that the space above, and possibly also reaching to the sides of the support structure forms the space of the final machine room and the space below the support structure forms the final elevator hoistway. In this way a conventional machine room can be formed.
In a more refined embodiment of the concept according to the invention, which embodiment is preferably according to one or more of the embodiments presented in the preceding, the platform that supports the machinery comprises a support structure, which can be transferred between a contracted and (in the lateral direction) extended position, and in that the machinery is lifted while being supported by the platform into the space reserved for the final machine room by lifting the support structure through from the aperture leading into the space that is an extension of the elevator hoistway, such that the support structure is in the contracted position, after which the support structure is transferred to the extended position, in which position the support structure extends to over the load-bearing structures, and the support structure is lowered to rest on the aforementioned load-bearing structures. One advantage is a more efficient conversion of the jump-lift into the final elevator than before. The method is reliable and simple.
In a more refined embodiment of the concept according to the invention, which embodiment is preferably according to one or more of the embodiments presented in the preceding, in the extended position the support structure extends to over a load-bearing structure on at least two opposite sides of the aperture. The method is reliable and simple.
In a more refined embodiment of the concept according to the invention, which embodiment is preferably according to one or more of the embodiments presented in the preceding, after the support structure has been lowered to rest on the aforementioned load-bearing structures, casting is performed, in which casting the aperture/apertures between the elevator hoistway and the space are filled with casting material, such as with e.g. concrete-based casting material. In this way a conventional machine room can be formed, the floor of which is safe. The casting can be performed e.g. after the machinery has been transferred into the space reserved for the final machine room, if that is the procedure being followed.
In a more refined embodiment of the concept according to the invention, which embodiment is preferably according to one or more of the embodiments presented in the preceding, the casting is performed by casting the casting material onto a plate placed at the point of the aforementioned aperture/apertures, the top surface of which plate is preferably below the top surface of the floor of the space reserved for the final machine room. Thus reinforcing the structure that supports the machinery and converting said structure to be safe is simple and fast.
In a more refined embodiment of the concept according to the invention, which embodiment is preferably according to one or more of the embodiments presented in the preceding, the space reserved for the final machine room comprises a floor, on which it is possible to walk, which floor preferably comprises the aforementioned aperture O, and which space reserved for the machine room is preferably essentially wider than the elevator hoistway in at least one lateral direction. Thus the working is safe and a conventional machine room is formed.
In a more refined embodiment of the concept according to the invention, which embodiment is preferably according to one or more of the embodiments presented in the preceding, the platform is lifted with a hoisting device, which takes the vertical support force needed for lifting from a structure of the space reserved for the machine room, preferably such that the support force can be taken from higher than the level of the top surface of the floor of the space (M) reserved for the machine room, preferably from the roof and/or walls of the space reserved for the machine room and/or from an additional support structure arranged in the space reserved for the machine room, which additional support structure is preferably supported on the floor. Thus the support structure of the platform can be brought into its position in the space M by pulling from above. The advantage of pulling is the simplicity of the lifting. When the support point of the lifting is above, higher than the floor level of the space M, sufficient pulling upwards is easy. By lifting this way, the machinery supported by the support structure comprised in the platform can at the same time be lifted into the space M reserved for the final machine room. Nevertheless, the machinery does not necessarily need to be lifted at the same time.
In a more refined embodiment of the concept according to the invention, which embodiment is preferably according to one or more of the embodiments presented in the preceding, the casting forms a level, the top surface of which is on essentially the same level as the top surface of the floor of the machine room. In this way a safe (e.g. the danger of tripping is eliminated) and aesthetic structure is formed, when the casting and the floor together form a level.
In a more refined embodiment of the concept according to the invention, which embodiment is preferably according to one or more of the embodiments presented in the preceding, the aforementioned load-bearing structure is a part of the floor of the space reserved for the final machine room or an additional support structure supported on the floor or a wall structure of the top part of the elevator hoistway. The floor is a simple and supportive support point for supporting the support structure directly or indirectly via an additional support structure. A wall structure of the top part of the elevator hoistway, on the other hand, enables simple supporting below the top surface of the floor.
In a more refined embodiment of the concept according to the invention, which embodiment is preferably according to one or more of the embodiments presented in the preceding, the points (surfaces B) of the aforementioned load-bearing structures, resting on which the support structure is supported are level with the top surface of the floor of the space reserved for the final machine room or above said top surface. One advantage, among others, is that the support structure is more isolated from the building with respect to vibration. Likewise it is simple to perform the casting under the support structure and to form a conventional machine room in which metal support structures are above the floor level.
In a more refined embodiment of the concept according to the invention, which embodiment is preferably according to one or more of the embodiments presented in the preceding, the points (surfaces B) of the aforementioned load-bearing structures, resting on which the support structure is supported are below the top surface of the floor of the space (M) reserved for the machine room. One advantage is the low space consumption of the machine room and the low quantity of parts rising from the floor level (aesthetic appeal, reduced risk of tripping).
In a more refined embodiment of the concept according to the invention, which embodiment is preferably according to one or more of the embodiments presented in the preceding, the casting and the floor of the space reserved for the final machine room form an essentially uniform flat top surface. Waterproofness, safety and sound insulation, inter alia, improve.
In a more refined embodiment of the concept according to the invention, which embodiment is preferably according to one or more of the embodiments presented in the preceding, the casting (C) forms at least partially the roof structure of the final elevator hoistway. One advantage is that the structure is safe and a conventional machine room that is observed to be good is achieved despite the exceptional method.
In a more refined embodiment of the concept according to the invention, which embodiment is preferably according to one or more of the embodiments presented in the preceding, in the casting the free spaces or apertures (which sort of extend through from the platform) connecting the space above the support structure and the space below the support structure below the machinery at the point of the elevator hoistway are filled with casting material. In this way vertical space usage is efficient. Little casting material is used.
In a more refined embodiment of the concept according to the invention, which embodiment is preferably according to one or more of the embodiments presented in the preceding, before the machinery of the elevator is transferred into the space that is an extension of the elevator hoistway and is reserved for the final machine room by lifting the platform that supports the machinery, the working platform that is above the machinery is removed from being in connection with the platform that supports the machinery. In this case, one advantage is the lightening and simplification of the next lift and easier usage of the space. Particularly advantageous in this case is that the platform is lifted with a hoisting device that takes the vertical support force needed for lifting from a structure of the space reserved for the machine room with one of the methods mentioned in the application. Likewise, in this way with the arrangement the structure 18 can be lifted sufficiently high.
In a more refined embodiment of the concept according to the invention, which embodiment is preferably according to one or more of the embodiments presented in the preceding, before the machinery of the elevator is transferred into the space that is an extension of the elevator hoistway and is reserved for the final machine room by lifting the platform that supports the machinery, a part of the frame of the platform that supports the machinery, preferably at least those parts of the frame of the platform that supports the machinery that are above the machinery, preferably such that the total height of the platform that supports the machinery essentially decreases, is removed from being in connection with the platform that supports the machinery. In this case, one advantage is the lightening and simplification of the next lift and easier usage of the space. Particularly advantageous in this case is that the platform is lifted with a hoisting device that takes the vertical support force needed for lifting from a structure of the space reserved for the machine room with one of the methods mentioned in the application. Likewise, in this way with the arrangement the structure 18 can be lifted sufficiently high.
In a more refined embodiment of the concept according to the invention, which embodiment is preferably according to one or more of the embodiments presented in the preceding, before the machinery of the elevator is transferred into the space that is an extension of the elevator hoistway and is reserved for the final machine room by lifting the platform that supports the machinery, some parts are removed from being in connection with the platform that supports the machinery, preferably at least one or more of the following:
The advantage of disassembly is that the volume (e.g. height) decreases and the structure becomes lighter. In this case the lifting into the machine room becomes easier from the viewpoint of the hoisting capacity and space requirement. Particularly advantageous in this case is that the platform is lifted with a hoisting device that takes the vertical support force needed for lifting from a structure of the space reserved for the machine room with one of the methods mentioned in the application. Likewise, in this way with the arrangement the structure 18 can be lifted sufficiently high. The whole method is simplified and the hoisting device to be used can be the same with which the installation platform 15 was moved in the earlier phases.
In a more refined embodiment of the concept according to the invention, which embodiment is preferably according to one or more of the embodiments presented in the preceding, after each aforementioned jump-lift the platform that supports the machinery is supported in its position in the elevator hoistway supported by the support structure of the platform that supports the machinery, which support structure extends to rest on the top surface of a load-bearing structure of the building on at least two opposite sides of the elevator hoistway. Thus the same strong support structure can be used for a number of needs (for forming the final support structure and as a platform supporter) without substantial modifications to the support structure.
In a more refined embodiment of the concept according to the invention, which embodiment is preferably according to one or more of the embodiments presented in the preceding, after each aforementioned jump-lift the platform that supports the machinery is supported in its position in the elevator hoistway and between consecutive lifts the machinery that is on the platform is used to move the elevator car below the platform for serving passengers of the building. An advantage is that an effective jump-lift is achieved.
In a more refined embodiment of the concept according to the invention, which embodiment is preferably according to one or more of the embodiments presented in the preceding, the support structure comprises a support means that is movable in the lateral direction of the support structure between a contracted and an extended position on at least two sides of the support structure, which two sides are opposite to each other. One advantage is the efficiency, reliability and suitability to the method owing to the good adaptability of the structure.
In a more refined embodiment of the concept according to the invention, which embodiment is preferably according to one or more of the embodiments presented in the preceding, that when the structures of the platform (4) are converted into the final load-bearing structure of the machinery, at least a part of the movable support means of the support structure are permanently locked into the extended position, e.g. by welding or bolting them to be immovable in relation to the support structure. One advantage is an improvement in the reliability and the safety of the structure.
In a more refined embodiment of the concept according to the invention, which embodiment is preferably according to one or more of the embodiments presented in the preceding, in the method the machinery that has been in use between jump-lifts is used as the final machinery of the elevator for moving the elevator car of the final elevator. One advantage is the minimal need to replace parts and a faster conversion phase, and essentially the same machinery structure from the start to the end of the method, which structure does not need altering in between.
In a more refined embodiment of the concept according to the invention, which embodiment is preferably according to one or more of the embodiments presented in the preceding, the aforementioned machinery preferably forms an entity, which comprises at least an electric motor and preferably also a traction sheave, and preferably in addition also a drive of the electric motor.
In a more refined embodiment of the concept according to the invention, which embodiment is preferably according to one or more of the embodiments presented in the preceding, the machinery is supported on a support structure via vibration damping, which vibration damping preferably comprises dampers placed between the support structure (18) and the frame of the machinery, preferably at least passive dampers such as e.g. rubber dampers. The supporting is according to this both during jump-lifts and in the final elevator. One advantage is a noise-free and supportive structure from the start to the end of the method, which structure does not need altering in between.
In a more refined embodiment of the concept according to the invention the space reserved for the machine room is a space that is enclosed at the top being bounded by a roof.
In a more refined embodiment of the concept according to the invention the space reserved for the machine room is a space with a floor.
In a more refined embodiment of the concept according to the invention, which embodiment is preferably according to one or more of the embodiments presented in the preceding, in jump-lifts the platform 4 is lifted while being supported by the structure 6 upwards in the elevator hoistway 1, which structure 6 can be supported on the wall structures of the elevator hoistway and can be moved, and the lift is performed with a hoisting means (9,10) arranged to act between the structure 6 and the platform 4, which structure 6 is preferably above the platform 4. One advantage is also that a worksite crane of the building is not needed for this so-called climbing jump-lift method either, and the method can be performed essentially fully without a worksite crane of the building. Thus also essentially the entire method can be performed with the same means.
Some inventive embodiments are also presented in the descriptive section and in the drawings of the present application. The inventive content of the application can also be defined differently than in the claims presented below. The inventive content may also consist of several separate inventions, especially if the invention is considered in the light of expressions or implicit sub-tasks or from the point of view of advantages or categories of advantages achieved. In this case, some of the attributes contained in the claims below may be superfluous from the point of view of separate inventive concepts. The features of the various embodiments of the invention can be applied within the framework of the basic inventive concept in conjunction with other embodiments. Each embodiment can also singly and separately from the other embodiments form a separate invention.
In the following, the invention will be described in detail by the aid of some examples of its embodiments with reference to the attached drawings, wherein
The arrangement according to
The elevator arrangement comprises a second support structure 14 in the elevator hoistway above the support structure 6, and second hoisting means for lifting the support structure 6 in the elevator hoistway while it is being supported on the second structure 14. The second hoisting means comprise a second hoisting device 21, which is preferably arranged to lift the support structure and/or an installation platform by means of a rope 22 with the lifting ratio of 1:1 or 2:1. The second hoisting means can also be arranged to move a working platform 15 in the elevator hoistway 1 that is under construction in the part of the elevator hoistway 1 between the structure 14 and the structure 6.
When it is desired to perform the next jump-lift, the structure 6 is lifted upwards in the elevator hoistway with the second hoisting means 21 that are connected to the structure. The amount of rope 10 needed in this case is released from the reel 23. For the purpose of a jump-lift, the platform 4 is suspended from the structure 6 via at least one hoisting device 9 and rope 10 comprised in the hoisting means, and the platform 4 is hoisted upwards in the elevator hoistway with a lifting ratio of 1:x, where x is greater than 1. In other words, the platform 4 that is at other times supported on the building is moved to be supported by the hoisting means and lifted. X is preferably some value between 4-12, preferably 6, 7, 8, 9 or 10, even more preferably 6, 8 or 10, most preferably of all 8. In the method the vertical support force needed for lifting is taken from the building by means of the structure 6 that is supported on the wall structures of the elevator hoistway.
After each jump-lift the platform 4 supporting the machinery 5 is supported in its position in the elevator hoistway supported by the support structure 18 of the platform that supports the machinery, which support structure extends to rest on the top surface of a load-bearing structure of the building on at least two opposite sides of the elevator hoistway. For this purpose the platform 4 comprises support means 8. For this purpose also the wall 20 can preferably comprise pockets that open towards the elevator hoistway extending inside the vertical projection of the wall, or alternatively load-bearing beams.
The platform that supports the machinery comprises at least an upper beam 19 and a lower beam 7, which are rigidly fixed in relation to each other and which enable the lifting of the entire supporting platform 4 at one time as a unit with the apparatuses (e.g. the machinery 5 for moving the car 3) inside it. The elevator hoistway 1 is formed inside the building and is vertical and can comprise e.g. concrete walls 20. The guide rails (not shown) of the elevator car in the part of the elevator hoistway 1 below the supporting platform 4 are already fixed to the walls of the elevator hoistway. Above the structure, where the elevator hoistway is unfinished, the work to install the car guide rails can be performed from a working platform 15. With the method, the elevator under construction will come to form the final elevator of the building after the building is completed.
According to the invention when the platform 4 has been lifted with jump-lifts to the top parts of the elevator hoistway, preparations are made for lifting the platform 4 into the space reserved for the final machine room. In this case some parts, preferably at least one or more of the following, are removed from being in connection with the platform 4 that supports the machinery:
These parts can be removed from being in connection with the platform 4 e.g. via the landing apertures. In this case the structure of the platform becomes lighter and smaller for the next phases of the method. At least the support structure 18, to which the machinery 5 is fixed, is left and not disassembled from the platform. The removal of the parts is not however necessary.
Next the platform 4, which thus in this phase comprises at least a support structure 18, is suspended from a hoisting device 21 that is higher than the platform for lifting the platform 4 e.g. in the manner presented by
The lifting of the machinery is performed by lifting it while it is being supported by the support structure 18 comprised in the platform 4 into the space (M) reserved for the final machine room by lifting the support structure (18) through from the aperture (O) leading into the space (M) that is an extension of the elevator hoistway (1) and is reserved for the final machine room, after which the support structure (18) is lowered to rest on the load-bearing structures of the building in the position presented by
The lifting of the platform 4 that supports the machinery 5 is advantageous to perform with a hoisting device 21, which takes the vertical support force needed for lifting from a structure of the space (M) reserved for the machine room, preferably such that the support force can be taken from higher than the level of the top surface of the floor of the space (M) reserved for the machine room. This structure is in the figures a roof structure of the space (M) reserved for the final machine room, but other preferred alternatives are the walls and/or an additional support structure arranged in the space (M) reserved for the final machine room, which additional support structure is preferably supported on the floor F. In this way a sufficiently reliable lifting point that will bear the load to be moved can be guaranteed. Likewise, in this way with the arrangement the structure 18 can be lifted sufficiently high. By means of the aforementioned additional support structure the point of support can be raised above the floor level of the machine room.
The structure (F,C,B,18 in the figures) that supports the machinery of the final machine room M2 of the elevator is formed at least partly from the support structure (18) of the aforementioned platform that supports the machinery such that the space above (and possibly also reaching to the sides of) the support structure 18 forms the space of the final machine room M2 and the space below the support structure 18 forms the final elevator hoistway.
To facilitate the supporting of the support structure 18 on the load-bearing structure B, the support structure 18 can be transferred between a contracted and an extended position, and that the machinery 5 is lifted while being supported by the platform 4 into the space M by lifting the support structure 18 through from the aperture (O) leading into the space (M) such that the support structure is in the contracted position, after which the support structure is transferred to the extended position, in which position the support structure (18) extends to over the load-bearing structures, and the support structure is lowered to rest on the aforementioned load-bearing structures. With this arrangement it is easy to fit the support structure through from the aperture O. The support structure extends in the extended position to over a load-bearing structure B of the machine room on at least two opposite sides of the aperture, in which case the supporting can be quickly and simply formed to be reliable.
After the support structure has been lowered to rest on the aforementioned load-bearing structures, casting is performed, in which casting the aperture/apertures between the elevator hoistway and the space M are filled with casting material (C), such as with e.g. concrete-based casting material. A plate P is used for the casting, which plate is placed horizontally below the top surface of the floor F of the space M at the point of the elevator hoistway and the casting material is poured onto the plate and said material is allowed to harden. This is advantageous to perform such that the casting C forms a level, the top surface of which is on essentially the same level as the floor surface of the machine room. This is advantageous to perform such that the casting and the floor of the machine room form an essentially uniform flat top surface, such that no vertical gaps remain between them, which improves the integration, safety, strength, sound insulation, waterproofness and aesthetics of the structures.
In the embodiment presented by
As presented with dashed lines in
It is obvious to the person skilled in the art that the invention is not limited to the embodiments described above, in which the invention is described using examples, but that many adaptations and different embodiments of the invention are possible within the frameworks of the inventive concept defined by the claims presented below. It is therefore obvious, e.g. that during a jump-lift the elevator car can be lifted along with the platform that supports the machinery, or it can be locked in the elevator hoistway. It is also obvious that the casting that is presented is not necessary.
Number | Date | Country | Kind |
---|---|---|---|
20090389 | Oct 2009 | FI | national |
This application is a continuation of International Application Number PCT/FI2010/050835 filed on Oct. 22, 2010 and claims priority to Finnish Application Number FI 20090389 filed on Oct. 23, 2009, the entire contents of each of which are hereby incorporated herein by reference.
Number | Name | Date | Kind |
---|---|---|---|
3519101 | Sieffert | Jul 1970 | A |
5000292 | Chapelain et al. | Mar 1991 | A |
6805222 | St. Pierre et al. | Oct 2004 | B2 |
7624848 | Fischer | Dec 2009 | B2 |
20070045207 | Kollory | Mar 2007 | A1 |
20070170014 | Woronoff | Jul 2007 | A1 |
20070181381 | Jungbauer et al. | Aug 2007 | A1 |
Number | Date | Country |
---|---|---|
2694279 | Feb 1994 | FR |
54108331 | Aug 1979 | JP |
54108331 | Aug 1979 | JP |
3264482 | Nov 1991 | JP |
4243786 | Aug 1992 | JP |
05171811 | Jul 1993 | JP |
8133636 | May 1996 | JP |
9278325 | Oct 1997 | JP |
WO-0007923 | Feb 2000 | WO |
WO 2004052767 | Jun 2004 | WO |
WO-2006010782 | Feb 2006 | WO |
Entry |
---|
Formal translation, JP 03 264482 A, FLS, Inc., Aug. 2012, pp. 1-13. |
EPO Machine Translation, FR2694279A1, Jul. 19, 2012, pp. 2. |
AIPN, Machine Translation, JP 05 171 811 A, Mar. 30, 2015, pp. 1-3. |
International Search Report. |
Number | Date | Country | |
---|---|---|---|
20120272612 A1 | Nov 2012 | US |
Number | Date | Country | |
---|---|---|---|
Parent | PCT/FI2010/050835 | Oct 2010 | US |
Child | 13453603 | US |