The present invention relates to methods of assembling unitized curtain wall units and power generating systems within a building shell, particularly units which house such as photovoltaic modules.
It has been long been considered desirable to integrate photovoltaic (or PV) devices and systems into commercial and residential buildings. To date, however, such systems have been generally limited to conventional roof-top based systems which have limited photovoltaic capability and little aesthetic appeal. Conventional roof-top based systems are limited in photovoltaic capability because, among other reasons, the modules which make up these conventional systems are connected in series which effectively lowers the productivity of the entire system to that of the least productive of the modules. Conventional roof-top based systems also depend upon racking systems which do not afford a practical method to integrate photovoltaic elements into a vertical building face in an attractive and safe manner. Shading by building elements, equipment, and other constraints severely limit the area available for PV deployment.
Clearly it would be desirable to incorporate PV devices in a larger area of a building structure, and in a more visually appealing fashion. In a recent attempt at such an endeavor, a building in New York City incorporated PV elements in vertical façade assemblies that were actually physically separate from the main structure, and configured as artistic elements. The project was in fact a failure due to the inability of the system designer to overcome regulatory restrictions on the incorporation of electrical elements into this type of structure. Thus, while the panels are still attached to the side of the building, they have not been utilized to generate useful PV power.
“Unitized” curtain wall systems are those which can be preassembled and glazed as units (i.e., the glass or other surface material installed) off site and progressively installed section by section on a building. One advantage of the unitized curtain wall approach is that the labor is performed in an off site, controlled, manufacturing environment. Unitized systems are suitable for mid to large projects, i.e. high-rise buildings (four stories or more), those with significant repetition of their components, and/or projects in locations that have higher seismic design requirements. Frame units for unitized curtain walls are typically configured as one module (glazing or glass unit) wide by one story in height. These pre-glazed frames are typically placed on bunks consisting of about 6 units each and hoisted by a tower crane to their respective floors where they are installed, often by utilizing a small mobile hoist from the floor above.
The unitized curtain wall systems also typically include a pressure equalized rain screen, which counteracts the forces that cause water infiltration, such as surface tension, capillary action, gravity, kinetic energy, and pressure differential. Unitized curtain wall systems are in wide spread use and gaining commercial popularity across for the country because of their ease of integration, reasonable cost, schedule-friendly capabilities and aesthetic beauty and high performance.
Photovoltaic modular panels have been integrated into curtain wall glass for building integrated photovoltaics, as seen in U.S. Publication Serial No. 2008/0163918 incorporated by reference herein. Nonetheless the design described is optimized only for amorphous type solar cells, and is not conducive to ease of construction because it is not configured for efficient inter-modular connection. Nor does such design compensate for shading, a problem that severely impairs the performance of conventional series-connected solar panels particularly in articulated applications like building enclosures. As is well known, in conventional PV approaches shading degrades the performance and power output (or yield) of the shaded module or unit. When shading falls on one or more of the conventional series-connected solar panels, the series connected modules degrade in overall performance to that of the lowest yield in the string. Finally the prior art also fails to address the lack of overall Underwriters Laboratory certification or UL approval. UL certification of the framing system is an essential element to enable PV projects to be approved under applicable building and safety regulations, and thus is a key element to enable widespread adoption. Many commercially available modules are UL Approved to UL 1703, but no framing systems related to Building Integrated Photovoltaics (UL Category QHZQ) are commercially available today
WO 2006/123335 incorporated by reference herein suffers from similar deficiencies, in that inter-module connections (in particular those between each individual solar module and those adjacent left and right) are depicted in great detail. However, this system is connected in series, without individual module management. In addition, the array construction method lacks inter-module conduits or passages suitable for routing wiring. Moreover, the modules are connected to each other only in a lateral (left and right) fashion; there is no teaching of vertical connection. For this reason any vertical connections must be accommodated through additional structures, such as tracks, tubes or strips that are not integrated into the curtain wall framing members. U.S. Pat. Nos. 6,646,196 incorporated by reference herein shows a similar set up, and suffers similar deficiencies. These additional runs add cost and complexity to installation, reduce operational efficiency, raise maintenance costs and complexity, and potentially increase susceptibility to failure.
An object of the present invention, therefore, is to reduce and/or overcome the aforementioned limitations of the prior art.
A first aspect of the invention concerns a building integrated power generating system;
Another aspect of the invention concerns a building integrated power generating system that is UL/regulatory compliant;
A further aspect concerns integrating control management units into such power generating system;
Yet another aspect concerns a building integrated power generating system that is implemented in both vision and spandrel areas of a building façade;
Other aspects include unitized curtain wall units that are adapted for photovoltaic energy conversion modules;
Still other aspects cover electrical isolation, electrical conduits and grounding features of such unitized curtain wall units and associated building integrated power generating systems;
Another aspect of the invention covers integrated wireways/raceways used with the unitized curtain wall units;
Further aspects concern methods of assembling/manufacturing such unitized curtain wall units and building integrated photovoltaic conversion systems;
Other aspects include methods of operating the conversion modules, the control modules, and an entire power generating array integrated within a building shell;
Finally, other aspects of the inventions will be apparent to those skilled in the art from the detailed disclosure that follows.
It will be understood from the Detailed Description that the inventions can be implemented in a multitude of different embodiments. Furthermore, it will be readily appreciated by skilled artisans that such different embodiments will likely include only one or more of the aforementioned aspects or objects of the present inventions. Thus, the absence of one or more of such characteristics in any particular embodiment should not be construed as limiting the scope of the present inventions. While described in the context of a power generating array within a building façade, it will be apparent to those skilled in the art that the present teachings could be used in any number of applications.
The present invention preferably incorporates mono and/or poly silicon crystalline cells used for converting solar energy into electrical energy, such as those offered by Suntech Power Holdings Co. Ltd. (Suntech) directly into standardized curtain wall products, such as those offered by Architectural Glass and Aluminum Co, Inc (AGA) of Alameda California. The AGA curtain wall products are well-known durable exterior façades. The end result is a solar power generation system that also, much in the same manner as conventional curtain wall, functionally and aesthetically encloses a building.
By incorporating solar energy directly in the construction process for a building, the cost of implementing such green capability is greatly reduced. The cost of operating such buildings also goes down dramatically as a result of net energy savings by reducing the need for lighting using Daylighting Techniques and by controlling the solar heat gain and envelope U-value to reduce the energy needed for heating, ventilation and air-conditioning systems (HVAC).
The invention also has applicability, however, to retrofitting/re-cladding existing buildings to include solar capability, particularly when such structures include mechanical screening surrounding their rooftop. The invention can be used in such instances to both beautify and increase the functionality of such otherwise unaesthetic and nonfunctional architectural features.
Before delving into the specifics of the present invention, it is useful to describe and understand the characteristics of unitized curtain walls. Unitized curtain walls are an extremely popular form of building façade used throughout the world.
The main defining characteristic of unitized curtain walls are that they are substantially (and usually entirely) preassembled off site in units and, after transport to the project site, hung or fastened onto on the building's structural slab edges. The unitized curtain wall does not typically function as a structural support element for the building. The final installation of these pre-assembled units into the integrated whole results in a “unitized” curtain wall system.
Off-site pre-assembly of the units is far preferable to onsite because operations can be done far more efficiently—at a dedicated facility by skilled personnel—with much lower cost and with higher speed and throughput. Off-site assembly also leads to higher quality work with better seals, stronger bonds, and fewer errors, and further enables assembly bench testing prior to transportation and installation.
In contrast conventional stick built curtain wall systems require that the aluminum or metal frames for the glazing be field-assembled at the jobsite according to the specific architectural requirement. The labor for such solutions is costly, and the quality of such an installation is difficult to control from one unit to the next. Moreover, because stick built curtain wall frames are not manufactured in a controlled factory environment, before they can be UL certified, they must be field inspected, one by one, for approval. Such one by one field inspection is less preferable than the present invention, because the one by one approach consumes longer time and runs the risk that inspection, even after the expense of transport and assembly on site, will fail to result in certification. Prior building integrated PV curtain walls, such as that mentioned in New York City above, suffered these very failures.
Unlike stick built approaches, curtain wall unitized panels are typically prefabricated as standardized 4′-8′ width×10′-15′ height units made up of different cladding materials (stone, painted aluminum, glass, opaque-glass, etc.) depending on the desired aesthetic/look the Architect is trying to achieve. A common form factor is five feet wide by thirteen and a half feet tall. The shop pre-assembly of the different materials into a unit, among other things, allows for:
A unitized curtain wall unit is typically made up of the following major parts/components:
It will be understood by those skilled in the art that this is a simplified description, and not intended to be an exhaustive list. The components may vary from those described. Moreover not every curtain wall unit will require such components, and some units may in fact use other components without deviating from the spirit of the present teachings and techniques.
The labor and assembly process associated with curtain wall units is also divided into separate phases which allows for more optimized costing associated with the various activities and better predictability of scheduling.
Fabrication Labor: typically includes all the labor involved in making or cutting/shaping each of the constituent framing and support parts of the curtain wall unit and then pre-assembling all the parts into the pre-assembled units designed for installation at the particular project. Since the curtain wall units are assembled typically in a dedicated facility, consistency and quality can be better controlled and optimized.
Installation Labor: typically includes the labor involved in attaching the support brackets/structures to the building, laying out, hoisting, and hanging the curtain wall units on the building, mating and aligning all the units and taking up tolerances, completing the necessary electrical connections, adding final seals, insulation and any interior finish trim that needs to be coordinated with finish material (like ceilings or sheetrock) that are typically provided by others. Because the on-site assembly method of the unitized curtain wall units is effectively identical and because all of the units have a common method for mating and attachment, the skill sets of the assemblers can be standardized and more easily controlled as well.
The present invention aims to enable unitized curtain wall systems to deliver energy production capability—more specifically photovoltaic functionality similar to a rooftop PV installation. That is, a system that primarily functions to generate electricity from solar power once the entire set of parts are assembled, and also performs the same aesthetic cladding function as prior art curtain wall systems. The difference here, of course, is that the power generation must be as compatible as possible with the requirements of a PV curtain wall unit, including resistance and compliance with various regulations concerning heat/conductive/insulation properties, air/water infiltration, wind load resistance and seismic considerations.
To accomplish this, a photovoltaic (PV) curtain wall unit includes the following (in addition to some or all of the standard components noted earlier):
Photovoltaic Panels: for a wall-system application, these are preferably glazable PV panels—and so can be thought of as a direct material replacement for the opaque glazed spandrel and/or vision material in the curtain wall unit—although there are some differences between these materials that are accommodated/designed for as shown in the present embodiments. Other types of panels/energy conversion devices can of course be used, and in this respect the invention is effectively panel-device agnostic. Varying cell density, photovoltaic materials, opacity, and aesthetic look can be adjusted as needed to meet the desired appearance, aesthetics and requirements.
Inverters/module management units/controls: these typically convert and optimize electricity generated by PV panels into grid compliant power. Preferably, the inverters/module management units/controls are provided locally and individually, at each curtain wall unit, to allow the PV wall system to more efficiently generate electricity from solar power. As mentioned, there is frequently greater variability in light exposure from one portion of a vertical building surface to another than there is on a typical rooftop installation. As a result, for BIPV applications, it is preferable that local controls account for self or site shading of each individual wall unit/panel and eliminate or reduce the otherwise typical impact from shading in which one shaded unit/module degrades the performance of the entire string of modules in the affected series. Shading can result from shadows cast by trees, other buildings, dust accumulation, and even birds, planes, and window cleaners. These conditions occur frequently on vertical curtain wall environments, and it is therefore important that the integrated PV curtain wall system include necessary controls and methods to mitigate and/or avoid this deleterious impact. In addition, these inverter/control elements should be easily accessible for maintenance and yet preferably be hidden from view of the occupants of the space as well as from viewers of the building exterior for both safety and aesthetic purposes. Finally, it preferable that of the above components should be rated UL or equivalent, and outdoor rated to accommodate for building construction conditions.
Wiring: wiring is preferably accommodated to carry power (and preferably control signals, where necessary) all the way from the PV panels to the grid without adding additional architectural complexity. Ideally, the wiring will be effectively invisible in the installation condition. In the preferred embodiment means are provided from each PV panel, through the curtain wall unit, to transport the generated electricity in a safe and controlled way through the entire wall array and ultimately to the interior of the building. Similar to the needs of the local inverter/controls, the wiring in a curtain wall system should preferably be done efficiently (i.e., preferably few wires for a long array run helps limit the size of the code required raceway (or other required wiring passage)), in an aesthetically pleasing manner (which, in a curtain wall system typically means hidden from view) while being protected from damage and accessible for maintenance. It will be appreciated that in other power generating applications involving other energy conversion devices, other types of tubing/conduits, etc., can be employed to transport other energy related materials, including heated/cooled fluids, etc. between modules and other parts of a circulation system within a building structure.
Accordingly, unlike previous applications of PV technology on a vertical wall, each PV curtain wall unit of the present invention can be sold, delivered and installed as a complete unit. Each PV curtain wall unit is preferably preassembled off site and transported to the building as a prefabricated module, allowing this new application to not only be simply, quickly hung on the building, but also, as panels, wiring, inverters and controls have also been prefabricated into a series of connected code-rated raceways attached to or formed by the unit framing, each unit can be simply, quickly and efficiently connected, coupled or plugged as needed into its neighboring units.
In an electrical generation system each unit is preferably linked to a common grounding mechanism using methods well known in the art.
As described above, one main purpose of the invention is to provide a photovoltaic power from a unitized curtain wall system. The units assembled according to the teaching of the invention will preferably be connected or linked in a manner that accumulates the electricity generated by each unit in the manner described above. The electricity so accumulated is connected to the building's primary electrical system and grid tied as appropriate, using methods known in the art. It is possible that the electricity in the system may be harnessed to run existing mechanical systems within the building envelope such as shading devices, window treatments, or blinds. This implementation thus allows a solar energy system to be installed as part of a building façade with the same ease and minimal additional labor cost.
In a conventional rooftop system, PV panels, wiring, controls, rack/support, etc. are all assembled on site and then plugged into the inverter/storage mechanisms. In the case of a preferred unitized PV curtain wall as described herein the PV curtain wall units are preferably each ‘plug and play’—each unit mates into and is electrically coupled to its adjacent unit to form the solar array. In turn, the solar array is electrically connected into the balance of the building electrical system. In this respect therefore, the inventions better achieve the functionality of a conventional rooftop system, but do so on the vertical sides of the building. Because a typical high rise building has 7-12 times greater wall than rooftop space, the present invention allows far greater harvest of solar energy.
In a preferred embodiment the invention is used preferably in cladding at least a substantial vertical portion of a building structure 100 as seen in a partial elevation drawing in
A preferred unitized curtain wall structure covering a building facade includes a number of separate curtain wall elements 105 preferably constituted of aluminum, although it will be understood that other suitable materials may be used, such as steel, fiberglass, or other composite materials. In this instance the curtain wall structure is shown as a combination of vision areas and spandrel areas, but it will appreciated that these could be separate components or utilized in varying combinations. The curtain wall units 105 can be configured as desired to extend across multiple stories in a continuous strip of spandrel and vision areas. While the elements 105 are shown as separate components it will be appreciated that larger “units” in the form of multiple curtain wall elements could be assembled off-site in some instances.
The curtain wall elements 105 are further adapted to preferably include a photovoltaic (PV) module 120 and/or other energy conversion device. Such devices could include capability for converting other forms of electromagnetic energy, potential energy, kinetic energy, thermal energy and/or chemical energy including photochemical energy. For example, thermionic, piezoelectric and/or mechanical devices could be integrated for harnessing heat/wind/rain energy). Other examples will be apparent to those skilled in the art, and it is expected that other conversion devices will be adapted for use with the present invention. Because of their physical structure the curtain wall elements 105 can be easily adapted (mechanically/physically) to house/integrate different types of such conversion devices (which tend to be smaller than such elements) using the principles set out herein. It will be understood that the conversion devices can be spatially arranged as part of the curtain wall elements in any convenient fashion appropriate for the particular installation. Furthermore as shown in
In addition, in some instances well-known solar thermal energy collectors/plates could be embedded instead or in addition within the curtain wall elements for heating a conductible fluid, air or some other medium for transporting heat energy. Other well-known solar thermal support elements such as mirrors, lenses and other concentrators (not shown) could be used of course to increase the heat concentration, and conventional heat storage devices (not shown) can be incorporated to store heat energy.
The PV module used in the preferred embodiment can be any one of a variety of virtually any commercially available PV module, including preferably a crystalline solar cell/module offered by Suntech Power. The PV module can include any number of conveniently and conventionally interconnected individual solar cell devices, such as described in the aforementioned prior art references. As is known in the art, the photovoltaic technology utilized by the PV module may be based on any suitable photovoltaic conversion technology, including for example, thin film, dye tinted, fullerene based, polycrystalline, or monocrystalline. The specifics of the solar cell/module (or other energy conversion device) are not material to the present invention; however regardless of their specific photovoltaic conversion technology the PV modules must be suitable to physically integrate them within the unitized curtain wall units. Accordingly, a wide variety of existing and contemplated technologies can be accommodated, thus making the invention PV module “agnostic,” which further enhances the commercial potential for the invention.
Conventional vision material or, in this case, glass panels 115 are also shown in
A linked solar array or assembly of PV curtain wall elements 105, 105′, 105″ etc. is thus shown mated together, cladding or enclosing a structure, preferably extending both horizontally and vertically across multiple floors. The elements 105 are preferably sized to be compatible with conventional building elements to further increase their integration potential. This arrangement is also useful for increasing the overall solar energy potential coverage for up to nearly 100% of the wall area of a structure. In contrast, typical rooftop systems only allow for a limited percentage of an overall surface area.
Specifically, as seen in
The framing members of the preferred embodiment are unique in that they form both vertical and horizontal conduits/channels for inter-module connectivity, including preferably, power lines, control signal lines, and reporting lines. In some applications as noted earlier it may be desirable to transport other fluids, gasses, etc. to and between modules using appropriate channels. Further, in some applications the desired control and reporting information flowing to and from the PV module 110 may be transported using wiring or wireless technology, thus obviating the need for the separate control signal and reporting lines.
The curtain wall units 105 are engineered using conventional techniques so that they are adequately resistant to water, pressure and other physical influences that might be attendant to a particular locale. Those skilled in the art will appreciate that the specific physical implementation can be varied from site to site in accordance with local building code, geological and weather based parameters.
Framing member 150 further preferably includes an opening allowing the PV leads 140 (or other flexible conduit/piping for transporting fluids/gasses) to be routed to a management module or control circuit 135 preferably situated in a power/control raceway 130. Again, to the extent other types of materials are transported, the opening can be varied accordingly.
Power/control raceway 130 is preferably attached to the solar array after installation of the curtain wall units on the building using any of the techniques known in the art. Nonetheless it can be preassembled as well in some instances. The management module 135 is preferably a unit designed for individual and group control of PV modules such as sold by TIGO Energy under the name Energy™ Module Maximizer-EP (MM-EP) and/or modules as described in US Patent Publication Nos. 20080097655 and 20090120485 incorporated by reference herein. There are many other power topologies accommodated, including but not limited to, Enphase, Solar Edge, Solar Magic, or Enecsys. The management module can be used to selectively monitor, troubleshoot, activate or de-activate portions of a building's solar array system, including on a side by side, floor by floor, or individual basis such as might be needed for accommodating window cleaning or maintenance as examples.
The management module is part of a control circuit that preferably optimizes power output of each module that it is connected to, and delivers module-level data for operational management and performance monitoring and/or control. The TIGO unit in particular uses dynamic module balancing which manages the energy harvest and sends information for reporting and control. The modules can be connected in a variety of known methods, depending on system needs.
The benefits of such module specific control/transmission/communication within a building structure is that they allow for greater efficiency in power collection and more effective elimination of prior art losses caused by shading by other external elements (trees, other buildings, dirt, etc.) and inherent mismatches in PV modules. These problems have heretofore greatly limited efficiencies of solar arrays in horizontal, vertical, or inclined configurations, particularly in densely built areas. Furthermore since such management modules 135 are UL rated to UL 1741, they can be used in preferred embodiments of the invention in which an entire solar array for a building is effectively compliant as constructed with UL (and other safety organization, such as Canadian Standards Association (CSA), InterTec North America (ETL), Tuv Rheinlan (TUV)) requirements because it consists of elements which are each previously certified.
The other advantage of the preferred TIGO management module is the improved safety of the solar array during operation. In particular, during an emergency, for example, the high voltage wiring in the preferred embodiment can be shut off, thus preventing accumulation of voltage and limiting voltage exposure to the open-circuit voltage (Voc) of a single module 110, generally no more than a normally non lethal level of approximately 60V. More advantageously this function can be activated with a safety button or via a remote management console or a network such as the Internet (not shown) for maximum flexibility. This function can also be tied into the buildings existing safety system so it can be automatically activated in the case of an emergency. Consequently the system can be installed, maintained or approached by personnel (including fire or other emergency personnel) without exposure to voltage levels which, in some topologies of conventional arrays typically exceed 400 volts during peak operation.
Finally, because each PV module 110 can be controlled individually by the management modules, it is possible to link and interconnect longer runs of PV modules that span more than one face of the building. While the present description presents the TIGO unit as an example it should be understood that the invention is not limited to any particular control module.
While the management modules 135 are shown within the power/control raceway 130, it is expected that future generations of integration modules will continue to shrink in size and therefore can be placed in a variety of locations. For example it will be apparent that they can be located in other areas of the curtain wall element 105″, including directly on the PV module 110 or directly within the framing members, the wiring channels, or potentially embedded in PV Modules 110. However, it should be noted that there is a benefit in most cases to locating the management modules within the power/control raceways because in this way, the signal lines are better isolated and easily routed between pairs of adjacent management modules.
The opening for the PV module leads 140 preferably includes a grommet 145 on the inboard vertical surface of the horizontal framing member 150. This allows for the PV module leads (or other conduits, tubes, etc.) 140 to exit the framing member 150 and enter the power/control raceway 130 in a safe and secure fashion, and in a manner that resists aging, corrosion, and damage from movement that may be cause by earthquakes, wind, etc. Skilled artisans will appreciate that the additional space shown within framing member 150 that is not used in the embodiment shown in
Again, one preferred aspect of the present invention is to ensure UL and/or CSA/TUV/ETL compliance. The curtain wall units 105 and power/control raceways 130 of the preferred embodiment further serve such aim by including the capacity to handle regulatory rated cabling, and with mountings (i.e., appropriate hole sizing, grommets and other tethering/tieing mechanism) and cable runs/shielding that allow for appropriate separation of different types of signal cables, such as high and low power lines, that are also designed to satisfy applicable regulations.
Note as shown in
The rest of the curtain wall unit 105″ is shown with conventional vision material elements 115, and various gaskets—for example, wedge gasket 165, and bed gasket 170, to help in securing and isolating the PV module 110 from the curtain wall unit 105′. Note that these same types of gaskets are also shown but not annotated specifically in the deep glazing pocket region 125. The gaskets are preferably comprised of materials that are UL rated for this purpose and may vary from installation to installation.
In particular it can be seen that the PV modules 110 are preferably insulated and isolated by a set of gaskets 165, 170 as noted before in
The main feature of
An additional structure, namely an integral vertical wiring management clip 160 is also included as part of the curtain wall unit 105″. This clip effectively behaves as a vertical conduit to accept, manage and integrate the power and signal cables from PV modules 110, allowing them to be interconnected in a vertical orientation as well. Thus, as seen in
Note that the shape and form of the clip 160 is illustrated in the preferred embodiment as a solid rectangular box structure in
As with the other elements of the curtain wall unit 105″ the vertical wiring management clip 160 is preferably constructed in a UL compliant manner to permit installation of the units without additional regulatory approval or accompanying delays.
The power/control raceway 130 is another feature unique to the present invention. Though similar in function to existing technology, the power/control raceway 130 is unique in that it may also be used for multiple purposes: as a conduit to carry the management module-management module cabling 165 (or other tubing/conduits), to contain management module 135, and to serve as an interior architectural trim piece. While not shown in
Returning to
The power/control raceway 130, as with the other curtain wall elements, is in the preferred embodiment is to be rated for Underwrites Laboratories (UL) or similar organization compliance and is made of aluminum or some other cost effective materials.
The management modules 135 are located in the power/control raceway 130 and manage/control/communicate with the individual PV modules. These management modules preferably optimize power output per each PV module and exchange operational management and performance monitoring data, allowing remote manipulation/management of the array.
The PV module leads 140 are coupled between the PV modules and the management modules to transmit generated power and communicate other status information to and from the modules. It will be understood that the particular coupling, wiring, etc., is expected to vary between different types PV modules or energy conversion devices.
Management module to module cabling 165 carries the accumulated power to a management unit 680 (See
Returning to
Note that a portion of the vertical framing members 155 can be seen in
An electrical diagram showing the main preferred components of a solar power generation system is shown in
As seen in
In the preferred embodiment, management unit 680 is in turn preferably coupled to a DC disconnect 685. As noted above, DC disconnect may preferably be activated either manually or electronically to isolate power to the output of the individual PV module. The output of this DC disconnect is preferably coupled to an inverter 690 which converts the DC generated voltage into an AC voltage in a well-known manner. Note that the management unit 680 is shown outside of the curtain wall unit 105, but it could be included within that unit without departing from the scope of the present invention.
The preferred embodiment includes a monitoring system 692 can be used to evaluate the performance of the individual PV modules 610 through interrogation of their respective management modules 635. The monitoring system includes conventional computing equipment and software for coordinating data exchanges, calculations, etc., with the management unit and management modules as is known in the art. Preferably the computing system is a server that is Internet accessible for remote access.
The output of the array is preferably connected to the building electrical system, typically in the main distribution area, where it can be used to offset consumption of electrical power or feed power into the utility grid. In some instances the array can offer other DC and AC outlets for charging electrical devices, transportation vehicles, etc. The form of the output, including voltage levels, current levels, etc., can be tailored as needed for any particular application. Furthermore if desired a conventional electrical storage system 691 can be employed in some cases to provide back-up power if desired. Again it will be understood that the support elements for a particular power generation system will vary according to the energy conversion devices used, and
At steps 715 and 720 the PV module leads are then preferably routed both horizontally and vertically as needed through framing members 150 and 155 respectively integrated within the curtain wall units 105. This allows for flexible interconnection of adjacent PV modules in the solar array.
During step 725 the PV module leads 140 are preferably connected to management modules 135 through connectors contained in horizontal framing member 150. At step 730 the individual management modules are also preferably electrically coupled together using the management-module-to-management module cabling 165 in the power/control raceway 130.
The grounding can be achieved during any one or more of the above steps in the manner known in the art. At this point the entire assembly, consisting of unitized curtain wall elements interconnected to form a solar array, is also completely safe and preferably UL compliant.
At step 735 the integration module 135 outputs are preferably connected to one or more management unit 680 as described earlier. At step 740, the electrical power can then be conveniently transferred to the building electrical distribution system, or made available through other outputs for other applications (charging). It will be apparent the above steps do not have to be performed in the sequence noted, and that the actual assembly process will likely include other obvious variants of the above.
To summarize, it can be seen that the invention implements a new type of PV capable curtain wall unit that has been specifically designed and engineered to be a power generator, but accomplishes a dual purpose: to enclose the building aesthetically as part of the outermost exterior shell enveloping the bulk of the building façade. Summing up, in the preferred embodiment, this is achieved by, among other things:
As such, virtually all of the components of conventional curtain wall units are adapted to deliver solar generated power as part of a PV system which is constituted substantially within an exterior aesthetic shell.
Unlike prior art systems, preferred embodiments of the invention thus efficiently achieve UL compliance as built because:
Embodiments of the invention can also be used for an existing building or structure which can be retrofitted or re-clad to incorporate other variants of the invention. Moreover in some instances, the PV modules can be integrated into curtain wall units in an array suitable for mounting on mechanical screening or other vertical faces (not shown) typically found on a building or structure. By utilizing such previously unproductive space, the invention can add value to existing properties by making them more cost-effective, attractive to environmentally conscious tenants, and so on.
As alluded to above the present invention can also be used with additional PV enhancement devices, such as solar concentrators, solar trackers (active and passive) and the like (not shown). Particularly in the spandrel areas, where appearance is not as critical, the integration of solar concentrators/trackers within the curtain wall elements could be used to greatly increase the collection of solar flux, by altering a radiation path to make it more incident to the elements, or adjusting the orientation of the elements themselves.
While not explicitly shown or described herein, the details of the various software routines, executable code, firmware, etc., required to effectuate the functionality discussed above in the management modules, management units and monitoring systems are not material to the present invention, and may be implemented in any number of ways known to those skilled in the art. Such code, routines, etc. may be stored in any number of forms of machine readable media.
The above descriptions are intended as merely illustrative embodiments of the proposed inventions. It is understood that the protection afforded the present invention also comprehends and extends to embodiments different from those above, but which fall within the scope of the present claims.
The present application claims the benefit under 35 U.S.C. §119(e) of the priority date of Provisional Application Ser. No. 61/099,437 filed Sep. 23, 2008 and Provisional Application Ser. No. 61/114,410 filed Nov. 13, 2008, both which are hereby incorporated by reference. The application is further related to the following applications, all of which are filed on this same date and incorporated by reference herein: Building Integrated Power Generating System; Ser. No. ______ (attorney docket number 2009-1);UL Compliant Building Integrated Photovoltaic Conversion System; Ser. No. ______ (attorney docket number 2009-2);Method of Operating Building Integrated Photovoltaic Conversion System Ser. No. ______ (attorney docket number 2009-3);Building Integrated Photovoltaic Conversion System Implemented With Integrated Control Management Units Ser. No. ______ (attorney docket number 2009-4);Building Integrated Photovoltaic Conversion System Implemented In Both Vision and Spandrel Areas Ser. No. ______ (attorney docket number 2009-5);Unitized Curtain Wall Module Adapted for Integrated Photovoltaic Conversion Module Ser. No. ______ (attorney docket number 2009-6);Unitized Building Integrated Photovoltaic Conversion Module Ser. No. ______ (attorney docket number 2009-7);Unitized Building Integrated Photovoltaic Conversion Module Adapted With Electrical Isolation and Grounding Ser. No. ______ (attorney docket number 2009-8);Unitized Building Integrated Photovoltaic Conversion Module Adapted With Electrical Conduits Ser. No. ______ (attorney docket number 2009-9);Integrated Electrical Conduit for Solar PV System; Ser. No. ______ (attorney docket number 2009-10);Electrical Raceway for Building Integrated Solar PV System; Ser. No. ______ (attorney docket number 2009-11)
Number | Date | Country | |
---|---|---|---|
61099437 | Sep 2008 | US | |
61114410 | Nov 2008 | US |