The present disclosure relates to the technical field of tunnel construction, in particular to a design method of a buffer layer with critical deformation of a tunnel initial support as a control target.
China is a vast country with rich and diverse landform features. Some tunnel sites are inevitably in bad geology, in which the most common ones are expansive rocks, soft rocks, high ground strain and loess tunnels. In response to such tunnel construction engineering, researchers have designed a variety of construction support methods, which can better guarantee the overall stability of the tunnel according to local conditions. The yielding technology amount of a buffer layer is the most discussed in recent years. This technology can release the deformation amount of surrounding rocks by using its own compression technology, so that the initial support can still play a supporting role under a large load, thus still providing a constant support force while yielding. Different from the traditional New Austrian Tunneling Method construction technology, this technology is widely used in a tunnel composite lining interlayer with large deformation disaster of tunnel surrounding rocks.
With the continuous maturity of the yielding technology of a tunnel buffer layer, the existing research direction has changed from how to construct at first to how to give full play to the optimal yielding effect of the buffer layer, and how to reduce the waste of engineering materials so that the buffer layer reaches the optimal engineering design parameters and the balance between engineering safety and stability and construction cost is achieved on the premise of giving full play to the maximum yielding capacity of the buffer layer and ensuring the overall safety and stability of the tunnel. However, there is no corresponding technical research in the existing buffer layer yielding technology.
Therefore, in view of the existing problems, it is not only of urgent research value, but also of good economic benefit and engineering application potential to develop a buffer layer design method with a critical deformation value under an ultimate bearing capacity of a tunnel initial support as a control target, which is the power and foundation for the completion of the present disclosure.
In order to overcome the shortcomings of the prior art pointed out above, the present inventors have conducted in-depth research on this, and have made the present disclosure after paying a lot of creative work.
Specifically, the technical problem to be solved by the present disclosure is to provide a design method of a buffer layer with critical deformation of a tunnel initial support as a control target, which can achieve the optimal yielding effect of the buffer layer on the premise of meeting the safety of a tunnel initial support structure, reduce the engineering cost of providing the buffer layer to a certain extent, and provide theoretical basis and technical support for safe, green and efficient tunnel construction.
In order to achieve the above purpose, the present disclosure provides the following technical scheme.
A design method of a buffer layer with critical deformation of a tunnel initial support as a control target is provided, wherein the method includes the following steps:
In the present disclosure, as an improvement, the Step (1) includes:
In the present disclosure, as an improvement, the yielding control target of the buffer layer is the relationship between a critical deformation value ωmax of the tunnel initial support and a maximum compression deformation amount HDmax of the tunnel buffer layer.
In the present disclosure, as an improvement, the performance indexes of the buffer layer in the Step (4) include a thickness H′ of the buffer layer and the maximum compression amount HDmax of the buffer layer.
In the present disclosure, as an improvement, the function expression in the state of critical catastrophe instability of the tunnel initial support is calculated as follows:
(1) a total system potential energy V(x) is a sum of bending strain energy V1, system potential energy variation V2 and external load work V3 of the tunnel initial support:
V(x)=V1+V2+V3;
In the present disclosure, as an improvement, the calculation formula of the critical deformation value of the tunnel initial support under the ultimate bearing capacity is as follows:
In the present disclosure, as an improvement, the thickness H′ of the tunnel buffer layer is calculated as follows:
Compared with the prior art, the present disclosure has the following beneficial effects.
(1) The method aims to put forward the critical deformation value of the tunnel initial support under the ultimate bearing capacity, obtain an optimal yielding design parameters of the buffer layer by taking a compression and load transfer mode of the tunnel buffer layer as a link, and give a calculation method.
(2) This method obtains the optimal yielding design of the buffer layer through calculation, so as to give full play to the yield effect of the buffer layer, avoid the waste of engineering materials resulted from a thick buffer layer, improve the overall cost of the engineering, and avoid the lining deformation resulted from a thin buffer layer which brings hidden dangers to the safety of the tunnel, save engineering materials and achieve the corresponding yielding effect on the premise of ensuring the safety and stability of the tunnel.
In order to explain the specific embodiment of the present disclosure or the technical scheme in the prior art more clearly, the drawings needed in the description of the specific embodiment or the prior art will be briefly introduced hereinafter. In all drawings, like elements or parts are generally identified by like reference numerals. In the drawings, elements or parts are not necessarily drawn to actual scale.
Hereinafter, embodiments of the technical scheme of the present disclosure will be described in detail with reference to the attached drawings. The following embodiments are only used to explain the technical scheme of the present disclosure more clearly. Therefore, the embodiments are only used as examples, and cannot be used to limit the scope of protection of the present disclosure.
The present disclosure a design method of a buffer layer with critical deformation of a tunnel initial support as a control target, wherein the method includes the following steps:
Establishing a mechanical model in Step (1) includes the following manners.
1) the longitudinal unit length of the tunnel is taken as the research object of generalization, wherein the cross section of the taken tunnel is in the interval section of 30 degrees of a vault. The tunnel centerline is taken as the symmetry axis, and one side of the symmetry axis is taken to establish a generalized mechanical model.
2) The taken arc-shaped interval section is simplified into a straight line, and the generalized model parameters are determined, including a length L, an inclination angle α, a thickness H of the initial support, an elasticity modulus E of initial support material, an overlying load q of the tunnel, a bulk density γ of tunnel initial support material, a dead load G=γHL, and an axial force N at both ends of the vault. When the tunnel is a non-over-buried tunnel, the axial force N has little influence on the potential function and can be ignored.
After generalizing the model, the variation of potential energy in the model is calculated, and a total system potential energy V(x) is a sum of a changing amount of strain energy of the tunnel initial support structure, that is, bending strain energy, system potential energy variation and external load work:
V(x)=V1+V2+V3; (1)
The bending strain energy, the system potential energy variation and the external load work of the initial support are calculated, respectively.
The calculation of the bending strain energy V1 of the initial support includes the following step.
According to the basic mechanical analysis, the deflection curve equation of the initial support beam model is:
Furthermore, it can be known from elastic mechanics that the bending strain energy of the tunnel initial support is:
The expression is:
Formula (4) is substituted into Formula (3), and ds performs Taylor expansion, ignoring the infinitesimal quantity of a higher order:
The calculation formula of the system potential energy variation V2 is as follows:
The calculation formula of the external load work V3 is as follows:
Formulas (5)-(7) are substituted into Formula (1), and the expression for calculating the available potential function is:
Based on the cusp catastrophe theory, in the potential function expression (8):
4a3+27b2=0 (11)
It can be known according to the catastrophe theory that when the control variables a and b satisfy the bifurcation set equation (11), the critical catastrophe instability if the tunnel initial support system occurs, that is:
The mechanical parameters and the design parameters of the tunnel initial support are substituted into the above formula, and the ultimate bearing capacity qmax of the tunnel initial support is obtained.
Combined with the formula for calculating the maximum deflection of beams fixed at both ends in structural mechanics:
The critical deformation value ωmax of the tunnel initial support under the ultimate bearing capacity is obtained.
The yielding control target of the buffer layer is the relationship between a critical deformation value ωmax of the tunnel initial support and a maximum compression deformation amount HDmax of the tunnel buffer layer.
The performance indexes of the buffer layer in the Step (4) include a thickness H′ of the buffer layer and the maximum compression amount HDmax of the buffer layer.
The function expression in the state of critical catastrophe instability of the tunnel initial support is calculated as follows:
The calculation formula of the critical deformation value of the tunnel initial support under the ultimate bearing capacity is as follows:
The yielding control target of the buffer layer is that the critical deformation value when the initial support of tunnel reaches the ultimate bearing capacity of catastrophe damage is not greater than the maximum compression deformation amount of the tunnel buffer layer, that is:
ωmax≤HDmax.
The parameters of the buffer layer are calculated, and the maximum compression amount of the buffer layer is HDmax:
HDmax=ωmax (18)
The thickness H′ of the tunnel buffer layer is calculated as follows:
The expansive rock tunnel is designed as a double-hole single-track tunnel, and the main support of the tunnel uses a composite lining structure. Refer to the attached table for the section of the lining structure. Parameters of the initial support material are shown in Table 1:
The initial support, which is intercepted as a mechanical model, is calculated to have a length L=69.9 cm and an included angle α=7.5 with the horizontal line.
(1) the ultimate bearing capacity of the tunnel initial support during critical damage is determined.
The tunnel parameters are substituted into the ultimate bearing capacity, which has the following calculation formula:
The ultimate load qmax of the tunnel initial support during catastrophe damage is obtained:
qmax=12.39 Mpa;
The formula is established. Therefore, the ultimate load qmax is effective.
(2) the critical deformation value of the tunnel initial support under the ultimate bearing capacity is determined.
The ultimate bearing capacity qmax is substituted into the maximum deflection calculation formula:
The critical deformation value ωmax of the initial support of tunnel under the ultimate bearing capacity is obtained:
ωmax=5.02 mm
(3) the performance indexes and the design parameters of the tunnel buffer layer are determined.
The material of the buffer layer is polyethylene with an elasticity modulus of 300 MPa and a maximum allowable compression ratio of 5.0%.
He maximum compression amount of the buffer layer is HDmax:
HDmax=ωmax=5.02 mm
The thickness H′ of the tunnel buffer layer is calculated and determined:
To sum up, when the tunnel initial support is in the state of the ultimate bearing capacity during catastrophe damage, the critical deformation value ωmax=5.02 mm. In order to achieve the optimal yielding design and generate economic benefits, the design parameters of the buffer layer are as follows: polyethylene material with an elasticity modulus of 300 MPa is selected as the buffer layer, which has a thickness of 12.15 cm and a maximum allowable deformation amount of 5.02 mm.
Finally, it should be noted that the above embodiments are only used to illustrate the technical scheme of the present disclosure, rather than limit the technical scheme. Although the present disclosure has been described in detail with reference to the above embodiments, those skilled in the art should understand that it is still possible to modify the technical scheme described in the above embodiments or make equivalent substitutions to some or all of the technical features. However, these modifications or substitutions do not make the essence of the corresponding technical schemes deviate from the scope of the technical schemes of various embodiments of the present disclosure, which should be included in the scope of the claims and specification of the present disclosure.
Number | Date | Country | Kind |
---|---|---|---|
202310891832.6 | Jul 2023 | CN | national |
Number | Name | Date | Kind |
---|---|---|---|
20230349799 | Chen | Nov 2023 | A1 |
Number | Date | Country |
---|---|---|
104265323 | Jan 2015 | CN |
104634646 | May 2015 | CN |
206397527 | Aug 2017 | CN |
109026016 | Dec 2018 | CN |
110750820 | Feb 2020 | CN |
111305097 | Jun 2020 | CN |
211342930 | Aug 2020 | CN |
111967080 | Nov 2020 | CN |
113338994 | Sep 2021 | CN |
214303850 | Sep 2021 | CN |
114329701 | Apr 2022 | CN |
114635720 | Jun 2022 | CN |
114996825 | Sep 2022 | CN |
115596466 | Jan 2023 | CN |
110210069 | Apr 2023 | CN |
116066515 | May 2023 | CN |
116429592 | Aug 2023 | CN |
116611156 | Aug 2023 | CN |
116611156 | Aug 2023 | CN |
116167131 | Sep 2023 | CN |
117077244 | Nov 2023 | CN |
117235968 | Dec 2023 | CN |
2007205163 | Aug 2007 | JP |
WO-2018086085 | May 2018 | WO |