The present application claims priority under the Paris Convention from Japanese Application 2006-028883 filed on Feb. 6, 2006, the contents of which are hereby incorporated by reference into this application.
The present invention relates to a method of building a boiler frame and more specifically to a method of building a boiler frame of a large scale boiler for a thermal power plant.
A boiler frame of a large scale boiler for a thermal power plant is a gigantic construction with a height of 60 to 100 meters. As a method of building a boiler frame, it is common to attach unit parts (such as braces, medium beams, small beams, joists, gratings, handrails etc.) respectively to the designated positions by lifting and carrying them to each respective floor, after the completion of building an overall framework with steel supporting posts and large beams. However, this type of serial construction process requires a large part of the construction work to be done at a high altitude, and also requires a large amount of labor and time for transportation of the unit parts with a crane. As a result, the efficiency of the operation decreases, while the construction costs as well as the required time for completing the construction increases.
In order to reduce the construction costs, the opportunity to adopt a block construction method has recently been implemented. A Japanese Patent No. 2,932,818 discloses one example of the block construction method. With the block construction method, posts, large beams, brace, medium beams, small beams, joists, gratings, handrails etc. are all pre-fabricated to be a specific block unit at an internal assembly factory, and the blocks are stacked at the construction site by a crane.
In the case of the block construction method, the blocks are pre-fabricated at the internal assembly factory on the ground where the efficiency of the operation is high. With the block construction method, the required time for completing the construction has become shorter since the assembling and stacking processes of each block from the lower floor to the higher floor can be implemented in conjunction at the same time.
However, the conventional block construction method is not without its problems. A high load-lifting height crane for lifting the blocks at the construction site is required and the weight and size of the blocks are limited by the capacity of the crane. Moreover, the construction is often forced to be suspended due to bad weather conditions. Operating the crane in an area with strong wind or falling snow would deem it to be too dangerous to continue the operation.
The objective of the invention is to provide a method of building a boiler frame with minimum usage of a high load-lifting height crane, with less restriction of block weight and size, and with improved efficiency of operation in a bad weather, by improving the problems identified in the above prior art.
In order to achieve the objective, the method of building a boiler frame according to the present invention connects tops of multiple of steel supporting posts established in advance with beams, and temporally fixes a floor unit of upper floor at the lower middle floor. A multi-floor unit is formed by connecting a lower floor unit to the temporally fixed upper floor unit. Then, the boiler frame is build by repeating operations that the temporally fixation is released, the multi-floor unit is lifted, and then each floor unit is fixed to its designated floor.
Furthermore, it is possible that the method of building a boiler frame includes a first step installing a lifting jack on top of a linked beam connected between tops of multiple of steel supporting posts, while the supporting posts that are a part of the boiler frame are being extended to a top floor level, and a top floor unit is temporally fixed to the height corresponding to an intermediate floor; a second step for forming a multi-floor unit by connecting a lower floor unit designed to become lower than the top floor together on the ground while a traction device suspended from the lifting jack is lifting the top floor unit; a third step for connecting the multi-floor unit formed in the second step with the top floor unit, wherein the multi-floor unit is lifted by the lifting jack; a fourth step for temporally fixing a lower side floor unit to an intermediate floor position of the steel supporting posts, and disengaging the lower side floor unit from the multi-floor unit; and a fifth step for releasing the temporally fixing of the top floor unit and jacking up a multi-floor unit consisting of the top floor unit and at least one of lower floor units, and permanently fixing each floor unit of the multi-floor unit to respective designated positions. The lifting jack is desirable to be a center-hole type jack.
According to the method of present invention, each floor unit can be fixed to each designated floor position in a condition of securing the strength of a steel frame assembly structure by temporally fixing a floor unit to a intermediate floor of multiple of steel supporting posts, after lifting a heavily loaded multiple floor unit as a whole with a lifting jack or other devices. Furthermore, this method significantly reduces the need for working at high altitudes since the multiple of floor units are assembled on the ground side at the second step.
Therefore, according to the present invention, the usage of the high load-lifting height crane is minimized and each pre-fabricated floor unit are fixed to the designated floor sequentially with high efficiency and safely. And a method of building a boiler frame is achieved with the reduced restriction to the weight and size of the floor unit as a block since the usage of the high load-lifting height crane is not necessary after the second step and with the improved operability even in a bad weather.
Together with the drawings attached, an embodiment of the present invention is explained.
Boiler frame 10 consists of a center portion 12 with boiler furnace walls X and cage walls Y etc., a front potion 14 with a coal bunker X, a rear portion 16 with a pre-heating device, and a side portion 18 to become a operation maintenance area for equipments deployed in the center portion 12 with small devices and a pipeline.
Within the construction of the boiler frame 10, especially the side portion 18 is the most suitable place for applying the method of building a boiler frame according to the present invention. The side portion 18, for example, reaches the height of 75 meters with nine floors. With the quadripartite side portion 18, the method of building a boiler frame according to the present invention is applicable to each of the quadrants. In the case that the method of building a boiler frame according to the present invention is applied to one quadrant of the side portion 18 will be explained in this specification.
The longer sides of the large beams 24 have lifting posts 32 protruded outside to be used when the 9th floor unit F9 is lifted by lifting jacks 38. When 9th floor unit F9 is fixed temporarily to an intermediate floor as shown with FIG. 4(1), after the lifting posts 32 are engaged with lifting ropes suspended from a crane, the 9th floor unit F9 is suspended and transported toward the position where blackest B7 are located. Then the four corners of the 9th floor unit F9 are fixed to the brackets B7 temporarily. With this temporally attachment of the 9th floor unit F9, the strength of the frame beam structure significantly improves.
As explained later, the structure of each floor unit F8-F2 is similar to that of the 9th floor unit F9, and floors 26, handrails 28, lifting parts 32, pipelines are made in the internal assembly factory respectively, then to be carried to the construction site at respective designated timing.
At the first step, each steel supporting post 20 is extended toward the top floor from the status indicated in
Accordingly, the fixation of lower floor side floor units can be done relatively freely with its convenience.
During the seventh step, while the suspension rods 42 suspended from the jacks 38 are connected with and jacking up the 5th floor unit F5, the 4th floor units and the lower floors are connected sequentially on the ground floor in the same way as the second step. As a result, a multi-floor unit is formed by connecting the 5th floor unit F5, the 4th floor unit F4, and the 3rd floor unit F3 as shown in FIG. 11(1).
Then after jacking up the multi-floor unit as a whole with the lifting jacks 38, each floor unit is fixed to the designated floor respectively. It is possible to remove the linking devices 44 and 48 that are used for forming the multi-floor unit after each floor unit is fixed the designated position; however, the linking devices 44 and 48 can be designed to form a part of the frame structure as well. Additionally, braces 50 can be attached in between each floor unit for reinforcing the frame structure at an appropriate timing. Then, the series of frame building operation with respect to the side portion 18 is completed after removing the lifting jacks 38, the suspension portions 32 shown in
As explained in details, according the method of building a boiler flame in this embodiment, after the multi-floor unit F8-F6 connected on the grand floor as a whole is lifted up by the lifting jack 38 during the second step, each floor unit F3-F5 is fixed to the designate floor position respectively. In the same way, after the multi-floor unite F5-F2 is jacked up with the lifting jack 38, each floor unit is fixed to the designated floor position respectively. The pre-fabricated floor units, when made in a factory with an environment designed for maximum output on the ground are fixed to the respective designated floors efficiently. Furthermore, the restrictions of weight and size for the floor units F9-F2 are relaxed and also the method of building a boiler frame where the efficiency of the operation is influenced by a bad weather is no longer a problem, since there is no need to use the high load-lifting height crane in the second step and after.
Moreover, during the first and fourth step, the heavily loaded multi-floor unit can be jacked up since the steel frame structure is reinforced by the temporary fixation of the floor unit F9 or the floor unit F6 in the intermediate floor location of the steel supporting posts 20. As a result, a safe and efficient method of building a boiler frame is achieved.
In the embodiment explained in the case of one floor of the floor unit F9 or the floor unit F6 alone is fixed to the steel supporting posts 20 temporarily. However, it should be born in mind that the present invention is not limited to the features in the embodiment and therefore multiple of floor can be fixed temporarily while building the boiler frame as needed.
Moreover, the embodiment is based upon the side portion 18 that is a portion of the whole boiler frame. However, it should be born in mind that this invention is not limited to the embodiment and is applicable to other portion of the boiler frame structure without any restriction.
While the invention herein disclosed has been described by means of specific embodiments and applications thereof, numerous modifications and variations can be made thereto by those skilled in the art without departing from the scope of the invention set forth in the claims.
Number | Date | Country | Kind |
---|---|---|---|
2006-028883 | Feb 2006 | JP | national |
Number | Name | Date | Kind |
---|---|---|---|
3053015 | Graham | Sep 1962 | A |
Number | Date | Country |
---|---|---|
2932818 | Aug 1993 | JP |
Number | Date | Country | |
---|---|---|---|
20080028722 A1 | Feb 2008 | US |