The present disclosure relates generally to assembling and constructing busways, and, more particularly, to systems and methods of assembling or constructing busways with enhanced thermal performance, dielectric integrity, and mechanical strength.
A typical busway contains multiple busbar conductors sandwiched together and installed within a metal housing to form the busway. Each busbar conductor can carry a different phase of electrical current (sometimes referred to as a pole) or a neutral current and therefore must be dielectrically insulated from adjacent busbar conductors to prevent cross-phase electrical shorts and from the grounded metal busway housing to prevent ground faults. The busway can be of a feeder type, for long straight runs of electrical current, or a plug-in type, which allows for the connection of plug-in or bolt-on devices to branch circuits. Busways carry massive amounts of electrical current and get hot as a result. Thus, thermal management of a busway is an important consideration because heat reduces the overall current-carrying efficiency of the busway as some of the energy carried by the busbars is dissipated and lost as heat before it reaches an intended electrical load. Another important consideration is the mechanical integrity of the busway, especially during a short circuit event, where electromagnetic or electro-dynamic forces produced during a short circuit event operate to repel the conductors away from one another, compromising the electrical and mechanical integrity of the busbars and the busway housing. Busway designers have struggled to balance increasing the busway's mechanical strength while improving its thermal performance, all the while making the busway smaller, lighter, stronger, and more efficient.
Moreover, some busbars are coated on all exposed surfaces with a dielectric epoxy powder, which is allowed to cure, but during the curing process, tiny pinholes can appear at random places through the cured epoxy coating that expose the metal busbar. These holes can be responsible for creating undesired current paths from the busbar conductor when energized to the grounded busbar housing, so they need to be plugged. But first, any holes that exist need to be located, which is a labor-intensive process that involves, in one known dielectric test, sweeping an energized brush across the entire surface of both sides of the epoxy coating of an energized busbar while monitoring for a leakage current to identify a hole in the coating. Once a hole is discovered, the epoxy around the discovered hole can be drilled to make it larger, and then an epoxy is manually applied to the drilled hole and allowed to cure. This discovery and curing process can take up to an hour or more per busbar per busway. The integrity of all dielectric interfaces between energized conductors and energized and grounded surfaces must be maintained to ensure that no unintended current paths exist in the busway.
What is needed is an improved system and method of assembling a busway that yields an optimum level of mechanical strength and thermal performance and has unassailable dielectric integrity between and among grounded and energized conducting surfaces. Aspects of the present disclosure address these and other needs.
A busway, as that term is understood by persons familiar with electrical distribution systems, is disclosed in which an epoxy is provided between an outer surface of an insulated busbar conductor and an inner surface of a housing of the busway. The housing has multiple pieces, such a top, a bottom, and two opposing sides, which collectively surround the busbar conductors of which there can be three or four, for example, depending on the number of poles. Each busbar conductor has an elongate shape and is coated with or surrounded by a dielectric, such as an epoxy powder coating. It should be understood that a “busbar conductor” as used herein can include the dielectric coating around the metal portion of the busbar conductor. Uncured epoxy is applied to an inner surface of a piece of the housing, such as the top piece of the housing, and optionally spread evenly across the inner surface. A first of the busbar conductors is installed into the housing and abuts the inner surface of the piece of the housing. More uncured epoxy is applied over an exposed surface of the first busbar conductor and optionally spread evenly across the exposed surface along the elongate length of the first busbar conductor. A second of the busbar conductors is installed into the housing over the first busbar conductor. Additional busbar conductors are installed into the busway housing in the same manner such that between each adjacent pair of busbar conductors, a thin layer of uncured epoxy is present. Finally, uncured epoxy is applied over an exposed surface of the topmost busbar conductor, and another piece of the housing, such as the bottom piece, is installed over the busbar conductors.
The uncured epoxy has a low viscosity, and a cure time that slightly exceeds the time to install all of the busbar conductors into the busway housing. When applied in a thin layer, the epoxy improves thermal performance by reducing thermal contact resistance by displacing air and bonding the two surfaces together. The epoxy is applied in a thin layer so the additional thermal resistance due to its presence is negligible to the busway. Then, the epoxy cures quickly once the assembly of the busway has been completed. The quantity of uncured epoxy applied to a surface of a housing piece or a busbar conductor is sufficient to completely coat the surface without an excess amount of epoxy running into spaces at the edges of the busbar conductors.
In another implementation, uncured epoxy is applied only between the topmost busbar conductor and an inner surface of a first piece of the busway housing (e.g, the top piece) and between the bottommost busbar conductor and an inner surface of a second piece (e.g., the bottom piece) of the busway housing. No epoxy is applied between adjacent busbar conductors. When the busbar conductors are coated with a dielectric material, the probability that two busbar conductors will have respective holes that are aligned is very low, so it is not as important to apply the epoxy between adjacent busbar conductors. However, when the busway housing is uncoated (with a dielectric), if there are any holes in the busbar conductors that face the housing, a direct pathway for electrical current would exist between the exposed energized busbar conductor and the grounded busway housing.
Once all of busbar conductors have been installed into the busway housing and the epoxy has been applied between the outermost busbar conductors and the adjacent inner surfaces of the busway housing, an external pressure is applied to squeeze the busbar conductors together. This action causes the epoxy, which has not fully cured yet, to flow or coat the entire surface to which it was applied. Excess epoxy may ooze out of the sides of the busbar conductors, but an optimal amount of epoxy is applied to minimize any oozing of excess epoxy. The epoxy is allowed to cure, which preferably occurs within minutes after the conductors are pressed together. The pressure is conventionally applied to flatten the busbar conductors into a straight and true configuration, but the pressure now has the added benefit of squeezing the epoxy over the entirety of the surface to which it was applied.
The foregoing and additional aspects and implementations of the present disclosure will be apparent to those of ordinary skill in the art in view of the detailed description of various embodiments and/or aspects, which is made with reference to the drawings, a brief description of which is provided next.
The foregoing and other advantages of the present disclosure will become apparent upon reading the following detailed description and upon reference to the drawings.
Although this detailed description will be described in connection with certain aspects and/or implementations, it will be understood that the present disclosure is not limited to those particular aspects and/or implementations. On the contrary, the present disclosure is intended to cover all alternatives, modifications, and equivalent arrangements included within the scope of the invention as defined by the appended claims. The application of the aspects of the present disclosure can be extended to any device of any size and rated voltage per pole, when all active poles are already used in one polarity.
Referring now to
Although three busbar conductors 120a,b,c are shown in
The terms top and bottom when referring to the housing 102 are interchangeable and are not intended to convey any specific orientation relative to earth. The top piece 104 opposes the bottom piece 106, and the two side pieces 108, 110 are arranged between the top and bottom pieces 104, 106. Depending on the orientation of the busway 100 when installed, the side pieces 108, 110 can actually be arranged in a top and bottom orientation relative to earth. Alternately, if the busway 100 is installed upside down, the bottom piece 106 is actually on top (relative to earth) compared to the bottom of the busway 100. Thus, the terms “top,” “bottom,” and “side” of the housing are not intended to limit the disclosure to a specific orientation in space.
In some configurations, the busbar conductor 120a can be referred to as the topmost or outer conductor, and the busbar conductor 120c can be referred to the bottommost or outer conductor, meaning that the topmost or bottommost or outer conductors are adjacent to only one other conductor. The busbar conductor 120b can be referred to as an inner or middle conductor, meaning that it is sandwiched between two other conductors, which can be another inner or middle conductor or an outer conductor. For example, in a four-pole configuration, four busbar conductors are stacked on top of one another to form two outer busbar conductors and two inner busbar conductors.
The electrically insulating coats 122a,b,c that surround the respective busbar conductors 120a,b,c can be made from any electrically insulating material, such as, for example, an epoxy powder. The busbar conductors 120a,b,c are elongate, generally rectangular in shape, and can have rounded edges as shown in the cross-sectional view of
A flowable dielectric material is applied as described in more detail below between each of the conductors 120a,b,c and between the outermost conductors 120a,c and an inner surface of the top and bottom pieces 104, 106 of the housing 102 to form dielectric layers or interfaces 124a,b,c,d. When the dielectric material is initially applied as an uncured epoxy adhesive, in one non-limiting example, once the epoxy cures, the material forms the layers 124a-d, which improves the mechanical integrity of the busway 100. During short circuit events, one or more of the busbar conductors 120a,b,c will be repelled away from the energy of the short circuit, compromising the structural and mechanical integrity of the housing 102. When the dielectric material is an epoxy that cures to form an adhesive layer between and among conducting surfaces, such as the exposed metal on the inside of the busway housing 102 or pinholes that can form randomly across the surfaces of the insulating coats 122a,b,c, the adhesive layers enhance the mechanical integrity of the busway 100 and its ability to withstand short circuits and other electrical faults without compromising the mechanical structure of the busway 100. Additionally or alternately, the epoxy operates to provide a reliable dielectric separation between and among adjacent energized and grounded surfaces, such as by plugging or covering any holes that might have formed during curing of the insulating coats 122a,b,c. Additionally or alternately, the epoxy operates to improve the thermal performance of the busway 100, as explained in more detail below in connection with
The busway 100 shown in
As stated above,
Temperature measurements were taken along a second busway having epoxy-powder-coated busbar conductors only and without any of the flowable dielectric material according to the present disclosure. The second curve 404 represents the temperature rises measured on the second busway, and compared to the first curve 402, these temperature rise measurements show a marked reduction in the temperature along the entire length of the second busway. No measurement exceeded 48 degrees Celsius.
Finally, temperature measurements were taken along a third busway having insulated busbar conductors and a dielectric material as disclosed herein applied between each busbar conductor and between the outermost busbar conductors and the top and bottom housing pieces of the busway, such as described and illustrated in connection with
A first insulated busbar conductor (such 120a shown in
The first busbar conductor (e.g., 120a, 122a) is installed into the housing 102 such that the major flat surface of the first insulating coat (e.g., 122a) abuts the inner surface of the first piece (e.g., 104) of the housing 102 (504). In a non-limiting example, the busway 100 can be assembled “upside down,” with the top piece 104 being laid down first, followed by the busbar conductors, and finally the bottom piece 106 (512) (and optionally the side pieces 108, 110) before being compressed together to form an enclosed busway 100 (516). Of course, the busway 100 can also be assembled “right side up,” with the bottom piece 106 being laid down first, followed by the busbar conductors, and finally the top piece 106 (and optionally the side pieces 108, 110). Again, whether the assembly starts with the top piece 104 or with the bottom piece 106 is not an essential feature of the present disclosure.
In an aspect of the present disclosure, only one busbar conductor 120a, 122a needs to be installed into the busway housing 102. The second piece (e.g., 106) of the housing 102 is installed over the first busbar conductor (512), and then a pressure is applied to compress the first piece of the housing 102 and the first conductor together to cause the applied dielectric material to be interposed between the inner surface and the outer surface of the first insulating coat (516). For example, the applied dielectric material can flow uniformly across the interface between the aforementioned inner and outer surfaces. Finally, the applied dielectric material (e.g., epoxy) is allowed to cure and form an adhesive layer between all surfaces where it was applied (518).
As mentioned above, it is not essential to apply the dielectric material between adjacent pairs of busbar conductors due to the reduced likelihood that a pinhole through an insulating coat of one busbar conductor will align with a corresponding pinhole through an insulating coat of another busbar conductor. However, when the housing pieces 104, 106 are electrically conductive, the dielectric material is applied between the inner surfaces (facing an interior space of the housing 102) of the housing pieces and the busbar conductor(s) that abut against those inner surfaces to ensure that any pinholes formed in the insulating coat of the installed busbar conductor(s) are plugged or covered by the dielectric material, eliminating any unintended current paths between an energized conductor and the grounded housing 102, for example.
However, it is contemplated that if desired a dielectric material can be applied between intermediate pairs of busbar conductors (506) to enhance the mechanical strength of the busway 100. For example, in
Optional side pieces, such as 108, 110, are installed on opposite sides of the first and second pieces 104, 106 to form an enclosed busway housing 102 (514). A pressure is applied to compress the first and second pieces (together with the stacked busbar conductors therebetween) together (516). The pressure is configured to eliminate any bending in the busbar conductors and to flatten them into straight, level runs of conductors and to squeeze the epoxy (e.g., 124a-d) so that it spreads out uniformly between the surfaces to which it was applied. Without limiting the scope of the present disclosure, exemplary pressure values can range from 5-50 psi depending on the size and number of the busbar conductors. A small amount of excess epoxy may “ooze” out of the edges of stacked busbar conductors, and the amount of dielectric material applied is configured to minimize any such excess epoxy. Excess epoxy can be removed prior to curing, or allowed to remain as an additional dielectric interface between the stacked busbar conductors and the side pieces 108, 110 of the housing 102. The epoxy can be selected such that it has a cure rate that accommodates the assembly time but then rapidly cures thereafter. For example, a cure rate of no more than 30 minutes allows sufficient time to assemble the busway and compress the housing pieces together, but then cures quickly thereafter. All of the epoxy is allowed to cure and form an adhesive layer between adjacent surfaces where it was applied (e.g., at the interfaces indicated by reference numbers 124a-d in
Alternately, instead of assembling the busway by stacking the conductors into the housing and then compressing the housing together with the conductors, the busbar conductors can be stacked independently of the housing pieces and then compressed together before being inserted as a stack into the housing 102.
The assembly methods described herein can be carried out without identifying any holes in the insulating coats of any busbar conductor, and without having to repair any such holes that formed during application of the respective insulating coats on the busbar conductors. Any such holes that formed in an insulating coat are filled or covered by the dielectric material, such as 124a,b,c,d. This assembly eliminates the need to check the insulating coats on the busbar conductors prior to installing them into the busway housing, drastically reducing the assembly time and ensuring the dielectric integrity of the assembled busway 100.
The dielectric material, e.g., 124a-d, can be applied according to a pattern to a surface. The pattern is configured to ensure that the dielectric material spreads out and forms a uniform layer across the entire surface to which it is applied once a pressure is applied either by the weight of another busbar or by an externally applied pressure. The amount of flowable dielectric material is applied at a uniform rate along most or the entirety of the length of the busbar conductor. The pattern can be applied manually by a human installer or automatically using a nozzle that dispenses a bead of epoxy at a uniform rate. The pattern can be or include a single straight line (or when applied manually as straight as a steady human hand can apply) running along the center of most or all of the length of a busbar conductor. Alternately, the pattern can be or include a pattern of non-intersecting occurrences of the dielectric material spaced along at least most of the length of the major flat surface. Examples of non-intersecting occurrences include a dot-like pattern, or multiple substantially parallel lines running along most of or all of the length of the major flat surface of a busbar conductor across most of a width of the major flat surface. Alternately, the pattern can be or include a cross pattern having multiple lines that intersect one another at least once along the at least most of the length of the major flat surface of a busbar conductor.
While some of the examples herein use an epoxy as the dielectric material, such as 124a-d, 224a-d, and 324a-e, in other aspects, the dielectric material is not an epoxy but is still flowable. For example, grease can be a suitable dielectric material that is flowable, but is not an adhesive.
Words of degree, such as “about”, “substantially”, and the like are used herein in the sense of “at, or nearly at, when given the manufacturing, design, and material tolerances inherent in the stated circumstances” and are used to prevent the unscrupulous infringer from unfairly taking advantage of the invention disclosure where exact or absolute figures and operational or structural relationships are stated as an aid to understanding the inventive aspects disclosed herein.
While particular implementations and applications of the present disclosure have been illustrated and described, it is to be understood that the present disclosure is not limited to the precise construction and compositions disclosed herein and that various modifications, changes, and variations can be apparent from the foregoing descriptions without departing from the spirit and scope of the invention as defined in the appended claims.
Number | Name | Date | Kind |
---|---|---|---|
3202756 | Stanback | Aug 1965 | A |
3726988 | Davis | Apr 1973 | A |
3956574 | Weimer | May 1976 | A |
4804804 | Hibbert et al. | Feb 1989 | A |
5442135 | Faulkner et al. | Aug 1995 | A |
5686169 | Hassall et al. | Nov 1997 | A |
5854445 | Graham | Dec 1998 | A |
20020193035 | Wei et al. | Dec 2002 | A1 |
20040069527 | Vanhoutte | Apr 2004 | A1 |
20070178723 | Kataoka et al. | Aug 2007 | A1 |
20080196924 | Beulque | Aug 2008 | A1 |
20090145625 | Bhathija et al. | Jun 2009 | A1 |
Entry |
---|
Square D; Distribution Equipment Fundamentals; Terms and Concepts Fundamental to the Understanding of Square D Distribution Equipment and its Application; Dated 1989; pp. 1, 3 and 91-98 (10 pages). |
Number | Date | Country | |
---|---|---|---|
20140116617 A1 | May 2014 | US |