The present invention relates generally to a method and means of collecting oil from a reservoir overlying a water aquifer or basement rock using a manned tunnel.
There are situations where oil in the ground overlies water or a basement rock and can be recovered by unconventional means.
An example of such a situation is a layer of light oil overlying water in a shallow loose or lightly cemented sand deposit. For example, if the sand is a sand dune area adjacent to a large body of water such as a lake or an ocean, the layer of oil can be formed by an oil spill which collects and floats on the water table but under the surface of the sand dune. The oil spill can result, for example, from a breach or leak in an underground pipeline that goes undetected for a period of time.
Another example of such a situation is a layer of heavy oil or bitumen in a shallow lightly cemented oil sand deposit overlying either a layer of water or lying directly on a basement rock. Such situations occur in many shallow heavy oil or bitumen deposits (that is, oil sands deposits under no more than a few hundred meters of overburden). In some cases, production of heavy oil by cold flow may be feasible. In other cases, the heavy oil or bitumen may have to be mobilized by injection of steam or diluent.
While it may be possible to drill wells from the surface or to strip off the overburden to recover the hydrocarbon of interest, there may be surface restrictions preventing these approaches. For example, the hydrocarbon deposit may be under a lake, a river valley, a town, a protected wildlife habitat, a national park or the like.
There remains, therefore, a need for a method and means to recover the oil from above the underlying aquifer or basement rock by methods that minimize surface disturbance.
These and other needs are addressed by the present invention. The various embodiments and configurations of the present invention are directed generally to installing a lined barrier excavation, preferably straddling a liquid hydrocarbon/water interface, where the tunnel forms a physical barrier along all or a substantial portion of the length of the liquid hydrocarbon deposit and can collect the liquid hydrocarbon.
In a first embodiment of the present invention, a method for recovering a liquid hydrocarbon is provided that includes the steps:
(a) forming a barrier excavation along a substantial length of a subsurface liquid hydrocarbon-water interface;
(b) positioning a liner in the excavation, the liner being substantially impervious to the passage of the liquid hydrocarbon and water;
(c) forming a plurality of recovery ports at selected intervals along a length of the tunnel liner, the recovery ports passing through the liner and being in communication with an external subsurface formation; and
(d) recovering a portion of the liquid hydrocarbon through at least some of the recovery ports.
In a second embodiment, a system for removing a liquid hydrocarbon includes:
(a) a tunnel extending along a length of a subsurface interface between a liquid hydrocarbon and water;
(b) a liner positioned in the tunnel, the liner being substantially impervious to the passage of liquid hydrocarbons and water; and
(c) a plurality of recovery ports at selected intervals along a length of the tunnel liner, the recovery ports passing through the liner and being in communication with an external subsurface formation comprising the liquid hydrocarbon and water.
In one configuration, each of the recovery ports includes a first section comprising a main shut off valve and one or more additional sections comprising at least one of a viewing port to determine visually a type and/or composition of fluid entering the port; a sampling tap to collect a sample of a recovered fluid; and a sensor to determine, by measurement, a type and/or composition of the fluid entering the port.
In another embodiment, a method is provided that includes the steps of:
(a) providing a barrier excavation along a substantial length of a subsurface a liquid hydrocarbon-water interface, the barrier excavation comprising a liner in the excavation, the liner being substantially impervious to the passage of the liquid hydrocarbon and water, and a plurality of recovery ports at selected intervals along a length of the tunnel liner, the recovery ports passing through the liner and being in communication with an external subsurface formation; and
(b) at a first time interval, selecting a first set of recovery ports positioned at a first location along the tunnel;
(c) determining which of members of the first set of recovery ports are currently in communication with the liquid hydrocarbon and which of members of the first set are not currently in communication with the liquid hydrocarbon; and
(d) opening the members of the first set of recovery ports that are currently in communication with the liquid hydrocarbon and not the members of the first set of recovery ports that are not currently in communication with the liquid hydrocarbon.
In one configuration, the tunnel has numerous ports installed in the side of the liner to which the oil flows toward as it migrates downward along the approximate dip of the formation. These ports can be independently operated to preferentially drain off the oil and collect the oil in a controlled manner for recovery.
The tunnel can also be used for biosparging, which is blowing air or oxygen at low flow rate into the water below the oil to “polish” remaining low concentrations of hydrocarbons by (1) giving oil-eating bacteria oxygen an opportunity to work and (2) volatilizing light fractions. If the air or oxygen is blown at a high enough pressure and/or flow rate, it can strip out the hydrocarbon by volatilization. This technique is called air-sparging. In some cases, bio-sparging would be the preferred technique while in others air-sparging would be the preferred technique.
The following definitions are used herein:
“A” or “an” entity refers to one or more of that entity. As such, the terms “a” (or “an”), “one or more” and “at least one” can be used interchangeably herein. It is also to be noted that the terms “comprising”, “including”, and “having” can be used interchangeably.
In geology, the dip includes both the direction of maximum slope pointing down a bedding plane, which may be a bedding plane within the formation of interest or the basement rock on which the formation of interest lies, and the angle between the maximum slope and the horizontal. A water table within a formation of interest may also have a dip.
A hydrocarbon is an organic compound that includes primarily, if not exclusively, of the elements hydrogen and carbon. Hydrocarbons generally fall into two classes, namely aliphatic, or straight chain, hydrocarbons, cyclic, or closed ring, hydrocarbons, and cyclic terpenes. Examples of hydrocarbon-containing materials include any form of natural gas, oil, coal, and bitumen that can be used as a fuel or upgraded into a fuel. Hydrocarbons are principally derived from petroleum, coal, tar, and plant sources.
Hydrocarbon production or extraction refers to any activity associated with extracting hydrocarbons from a well or other opening. Hydrocarbon production normally refers to any activity conducted in or on the well after the well is completed. Accordingly, hydrocarbon production or extraction includes not only primary hydrocarbon extraction but also secondary and tertiary production techniques, such as injection of gas or liquid for increasing drive pressure, mobilizing the hydrocarbon or treating by, for example chemicals or hydraulic fracturing the well bore to promote increased flow, well servicing, well logging, and other well and wellbore treatments.
A liner as defined for the present invention is any artificial layer, membrane, or other type of structure installed inside or applied to the inside of an excavation to provide at least one of ground support, isolation from ground fluids (any liquid or gas in the ground), and thermal protection. As used in the present invention, a liner is typically installed to line a shaft or a tunnel, either having a circular or elliptical cross-section. Liners are commonly formed by pre-cast concrete segments and less commonly by pouring or extruding concrete into a form in which the concrete can solidify and attain the desired mechanical strength.
A liner tool is generally any feature in a tunnel or shaft liner that self-performs or facilitates the performance of work. Examples of such tools include access ports, injection ports, collection ports, attachment points (such as attachment flanges and attachment rings), and the like.
A manned excavation refers to an excavation that is accessible directly by personnel. The manned excavation can have any orientation or set of orientations. For example, the manned excavation can be an incline, decline, shaft, tunnel, stope, and the like. A typical manned excavation has at least one dimension normal to the excavation heading that is at least about 1.5 meters.
A mobilized hydrocarbon is a hydrocarbon that has been made flowable by some means. For example, some heavy oils and bitumen may be mobilized by heating them or mixing them with a diluent to reduce their viscosities and allow them to flow under the prevailing drive pressure. Most liquid hydrocarbons may be mobilized by increasing the drive pressure on them, for example by water or gas floods, so that they can overcome interfacial and/or surface tensions and begin to flow. Bitumen particles may be mobilized by some hydraulic mining techniques using cold water.
Primary production or recovery is the first stage of hydrocarbon production, in which natural reservoir energy, such as gasdrive, waterdrive or gravity drainage, displaces hydrocarbons from the reservoir, into the wellbore and up to surface. Production using an artificial lift system, such as a rod pump, an electrical submersible pump or a gas-lift installation is considered primary recovery. Secondary production or recovery methods frequently involve an artificial-lift system and/or reservoir injection for pressure maintenance. The purpose of secondary recovery is to maintain reservoir pressure and to displace hydrocarbons toward the wellbore. Tertiary production or recovery is the third stage of hydrocarbon production during which sophisticated techniques that alter the original properties of the oil are used. Enhanced oil recovery can begin after a secondary recovery process or at any time during the productive life of an oil reservoir. Its purpose is not only to restore formation pressure, but also to improve oil displacement or fluid flow in the reservoir. The three major types of enhanced oil recovery operations are chemical flooding, miscible displacement and thermal recovery.
A seal is a device or substance used in a joint between two apparatuses where the device or substance makes the joint substantially impervious to or otherwise substantially inhibits, over a selected time period, the passage through the joint of a target material, e.g., a solid, liquid and/or gas. As used herein, a seal may reduce the in-flow of a liquid or gas over a selected period of time to an amount that can be readily controlled or is otherwise deemed acceptable. For example, a seal between sections of a tunnel may be sealed so as to (1) not allow large water in-flows but may allow water seepage which can be controlled by pumps and (2) not allow large gas in-flows but may allow small gas leakages which can be controlled by a ventilation system.
Steam flooding as used herein means using steam to drive a hydrocarbon through the producing formation to a production well.
Steam stimulation as used herein means using steam to heat a producing formation to mobilize the hydrocarbon in order to allow the steam to drive a hydrocarbon through the producing formation to a production well.
A tunnel is a long approximately horizontal underground opening having a circular, elliptical or horseshoe-shaped cross-section that is large enough for personnel and/or vehicles. A tunnel typically connects one underground location with another.
An underground workspace as used in the present invention is any excavated opening that is effectively sealed from the formation pressure and/or fluids and has a connection to at least one entry point to the ground surface.
A well is a long underground opening commonly having a circular cross-section that is typically not large enough for personnel and/or vehicles and is commonly used to collect and transport liquids, gases or slurries from a ground formation to an accessible location and to inject liquids, gases or slurries into a ground formation from an accessible location.
A wellhead consists of the pieces of equipment mounted at the opening of the well to regulate and monitor the extraction of hydrocarbons from the underground formation. It also prevents leaking of oil or natural gas out of the well, and prevents blowouts due to high pressure formations. Formations that are under high pressure typically require wellheads that can withstand a great deal of upward pressure from the escaping gases and liquids. These wellheads must be able to withstand pressures of up to 20,000 psi (pounds per square inch). The wellhead consists of three components: the casing head, the tubing head, and the ‘christmas tree’. The casing head consists of heavy fittings that provide a seal between the casing and the surface. The casing head also serves to support the entire length of casing that is run all the way down the well. This piece of equipment typically contains a gripping mechanism that ensures a tight seal between the head and the casing itself.
Wellhead control assembly as used in the present invention joins the manned sections of the underground workspace with and isolates the manned sections of the workspace from the well installed in the formation. The wellhead control assembly can perform functions including: allowing well drilling, and well completion operations to be carried out under formation pressure; controlling the flow of fluids into or out of the well, including shutting off the flow; effecting a rapid shutdown of fluid flows commonly known as blow out prevention; and controlling hydrocarbon production operations.
It is to be understood that a reference to oil herein is intended to include low API hydrocarbons such as bitumen (API less than ˜10°) and heavy crude oils (API from ˜10° to ˜20°) as well as higher API hydrocarbons such as medium crude oils (API from ˜20° to ˜35°) and light crude oils (API higher than ˜35°).
As used herein, “at least one”, “one or more”, and “and/or” are open-ended expressions that are both conjunctive and disjunctive in operation. For example, each of the expressions “at least one of A, B and C”, “at least one of A, B, or C”, “one or more of A, B, and C”, “one or more of A, B, or C” and “A, B, and/or C” means A alone, B alone, C alone, A and B together, A and C together, B and C together, or A, B and C together.
The tunnel 110 is preferably formed by a concrete liner but the liner may be formed from other materials such as for example corrugated steel sections. The liner is preferably installed by a soft ground tunnel boring machine such as an earth pressure balance machine or even more preferably by a slurry machine. These machines are known to be able to successfully tunnel in sand or saturated sands under external fluid pressures as high as about 10 to 15 bars, depending on the seal design between the TBM and the liner segments being installed. As can be appreciated, the liner is preferably formed by bolted and gasketed segments which seal the inside of the tunnel from the external fluids and pressures. Alternately, the tunnel liner may be formed by extrusion of concrete as is known in the art. The tunnel liner may be sealed by other known methods such as for example by applying a thin layer of flexible shotcrete to the inside wall of the tunnel liner 110. The tunnel inside diameter is preferably in the range of about 3 to 15 meters depending on the nature of the oil-water interface. The tunnel liner wall thickness is preferably in the range of 40 to 300 mm depending on the depth of the oil-water interface and external fluid pressures. The tunnel barrier is typically long enough to intercept the entire length of the oil layer to be recovered. The tunnel may have a length in the range of about half a kilometer to several kilometers depending on the length of the oil layer 102 or the desired length of the oil layer to be drained.
The tunnel outside diameter 212 is preferably in the range of about 4 to 16 meters depending on the nature of the oil-water interface. The tunnel liner wall thickness 213 is preferably in the range of 40 to 300 mm depending on the depth of the oil-water interface and external fluid pressures. The recovery port diameters are in the range of about 25 mm to about 300 mm depending on the size of the tunnel, the amount of oil to be recovered and the oil recovery rate that can be handled efficiently. The number of recovery ports 211, at any section through the tunnel where oil is to be collected, is in the range of about 5 to about 50 depending on the size of the tunnel and the port diameters. The diameter and spacing of ports around the liner circumference may be uniform or they may be variable in size and spacing depending again on such factors as the size of the tunnel, the amount of oil to be recovered and the oil recovery rate that can be handled efficiently.
The recovery ports 302 are installed around the half circumference of the tunnel liner 301 for various reasons. For example, due to the long tunnel length the position of the oil-water interface 304 will vary along the length of the tunnel due to differences in formation composition and subsurface pressures. The position of the interface 304 at any selected location along the tunnel is therefore frequently unknown. As the oil and/or water is removed from the interface 304, at the selected tunnel location the position of the interface 304 will vary over time. Accordingly, forming a plurality of spaced-apart recovery ports 302 around half of the circumference of the tunnel liner can be important to the effective operation of the tunnel in removing oil from an aquifer or dipping reservoir.
The next section houses a window or viewing port 407 which may optionally be used to determine visually the nature of the fluid entering the recovery port 403. For example, if the fluid is predominantly oil, it will be light brown to black fluid. If the fluid is predominantly water, it will be light brown to clear fluid. If the fluid is predominantly air, it will be a light to clear fluid either with many entrained bubbles or little or no liquid content. The next section houses a sampling tap controlled by a valve 408 and can be optionally used to collect a sample of the recovered fluid 409 for further testing and analysis of the fluid entering the recovery port 403. The next section houses a sensor 410 which may optionally be used to determine, by measurement, the nature of the fluid entering the recovery port 403. Examples of such sensors include hygrometers, infra-red sensors, spectral sensors or specialized flow meters such as for example Coriolis flow sensors. As can be appreciated any combination of the above detection and discrimination methods may be used.
The next section houses a manifold for directing the recovered fluid. If the recovered fluid is oil as determined by visual inspection, sampling or sensor, it is directed to an oil storage facility as shown by arrow 416 by opening valve 415 and closing valves 411 and 413. If the recovered fluid is water as determined by visual inspection, sampling or sensor, it may be directed to a water storage facility as shown by arrow 414 by opening valve 413 and closing valves 411 and 415, or the water may not be recovered by shutting the main valve 406 as well as all other valves 408, 411, 413 and 415. If the recovered fluid is air as determined by visual inspection, sampling or sensor, it may be directed to a surface vent as shown by arrow 412 by opening valve 411 and closing valves 413 and 415, or the air may not be recovered by shutting the main valve 406 as well as all other valves 408, 411, 413 and 415.
As can be appreciated, the recovery port may require a filter or screen to prevent sand from entering along with the recovered fluid represented by arrow 404. Any number of sand filtering techniques may be used such as for example a length of slotted pipe that is capped in the formation. Slotted pipe is typically made from a steel tubing with long narrow slots formed into the tubing wall. The slots are approximately 150 millimeters long and about 0.3 millimeters wide. The narrow width of these slots is dictated by the requirement to prevent sand from entering into the slot when fluids are being collected. Alternately, a screen may be used in the recovery port 403 and may be installed, for example, in the flange assembly 405. The screen mesh would have openings approximately in the range of the slot widths used in the slotted pipe described above.
Along with the description of recovery presented in
The tunnel can also be used for biosparging, which is blowing air or oxygen at low flow rate into the water below the oil to “polish” remaining low concentrations of hydrocarbons by (1) giving oil-eating bacteria oxygen an opportunity to work and (2) volatilizing light fractions. If the air or oxygen is blown at a high enough pressure and/or flow rate, it can strip out the hydrocarbon by volatilization. This technique is called air-sparging. In some cases, bio-sparging would be the preferred technique while in others air-sparging would be the preferred technique. The bio-sparging or air-sparging could be carried out, for example, by closing valves 411, 413 and 415 and then attaching an air or oxygen line to the air removal line (shown with arrow 412). Then by opening valve 411, the bio-asparging or air-asparging treatment could be carried out by injecting air or oxygen at the desired pressure and/or flow rate. As can be appreciated any bio-asparging or air-asparging treatment would be carried out using a port that is below the oil layer 202 and in the water zone 203 as described in
A number of variations and modifications of the invention can be used. As will be appreciated, it would be possible to provide for some features of the invention without providing others. For example, it would be possible to employ the present invention of a physical barrier tunnel with collection ports in a dipping oil reservoir where the tunnel blocks the entire lower end of the producing zone and is used to collect all the oil migrating downward approximately along the dip towards the tunnel barrier. As another example, it would be possible to employ the present invention of a physical barrier tunnel with collection ports in a slightly dipping heavy oil or bitumen reservoir. In the case of some heavy oil deposits, the heavy oil will flow slowly and can be recovered by well-known cold flow production. In other cases, the heavy oil or bitumen may be mobilized by application of thermal techniques (such as for example Steam Assisted Gravity Drain also known as SAGD) or diluent additives (such as for example the VAPEX process). The tunnel can be installed at the bottom of the hydrocarbon deposit on or slightly into the underlying formation to form a physical barrier and used to collect all the mobilized hydrocarbons migrating downward approximately along the dip towards the tunnel barrier.
The present invention, in various embodiments, includes components, methods, processes, systems and/or apparatus substantially as depicted and described herein, including various embodiments, sub-combinations, and subsets thereof. Those of skill in the art will understand how to make and use the present invention after understanding the present disclosure. The present invention, in various embodiments, includes providing devices and processes in the absence of items not depicted and/or described herein or in various embodiments hereof, including in the absence of such items as may have been used in previous devices or processes, for example for improving performance, achieving ease and\or reducing cost of implementation.
The foregoing discussion of the invention has been presented for purposes of illustration and description. The foregoing is not intended to limit the invention to the form or forms disclosed herein. In the foregoing Detailed Description for example, various features of the invention are grouped together in one or more embodiments for the purpose of streamlining the disclosure. This method of disclosure is not to be interpreted as reflecting an intention that the claimed invention requires more features than are expressly recited in each claim. Rather, as the following claims reflect, inventive aspects lie in less than all features of a single foregoing disclosed embodiment. Thus, the following claims are hereby incorporated into this Detailed Description, with each claim standing on its own as a separate preferred embodiment of the invention.
Moreover though the description of the invention has included description of one or more embodiments and certain variations and modifications, other variations and modifications are within the scope of the invention, e.g., as may be within the skill and knowledge of those in the art, after understanding the present disclosure. It is intended to obtain rights which include alternative embodiments to the extent permitted, including alternate, interchangeable and/or equivalent structures, functions, ranges or steps to those claimed, whether or not such alternate, interchangeable and/or equivalent structures, functions, ranges or steps are disclosed herein, and without intending to publicly dedicate any patentable subject matter.
The present application claims the benefits, under 35 U.S.C. §119(e), of U.S. Provisional Application Ser. No. 60/829,599 filed Oct. 16, 2006, entitled “Method of Collecting Hydrocarbons Using a Barrier Tunnel” to Brock and Kobler and Ser. No. 60/864,338 filed Nov. 3, 2006, entitled “Method of Collecting Hydrocarbons Using a Barrier Tunnel” to Brock and Kobler, both of which are incorporated herein by these references. Cross reference is made to U.S. patent application Ser. No. 11/441,929 filed May 25, 2006, entitled “Method for Underground Recovery of Hydrocarbons”, which is also incorporated herein by this reference.
Number | Date | Country | |
---|---|---|---|
60829599 | Oct 2006 | US | |
60864338 | Nov 2006 | US |