Claims
- 1. Method of completing a well comprising the steps of:
- dividing the borehole into an upper and a lower annular area by running a packer actuated vent assembly downhole to a tubing string with the vent thereof being in the open position; connecting a bar actuated vent assembly in underlying relationship respective to the packer actuated vent assembly; connecting a jet perforating gun below the bar actuated vent assembly;
- setting the packer and using the setting action for closing the open vent of the packer actuated vent assembly;
- communicating the tubing interior with the lower annular area by dropping a bar downhole through the tubing string until the bar arrives at the bar actuated vent assembly, whereupon the downward motion of the bar is arrested and the dissipated energy used for opening the bar actuated vent assembly;
- detonating the jet gun by allowing the bar to continue to fall down through the tool string, arresting the downward motion of the bar and using the dissipated energy for detonating the shaped charges of the jet gun;
- whereupon, the casing is perforated and production flows through the perforations, up the lower annulus into the port of the bar actuated vent assembly into the tool string, and up the tubing to the surface of the ground.
- 2. A method of completing a well comprising the steps of:
- lowering a packer, an open vent assembly, a closed vent assembly, and perforating gun into a well on the end of a tubing string;
- flowing of well fluids into the tubing string through the open vent assembly as the tubing string is lowered;
- setting the packer;
- closing the open vent assembly to fluid flow;
- removing a portion of the well fluids from inside the tubing string;
- opening the closed vent assembly for the flow of production;
- detonating the perforating gun;
- perforating the well to permit production to flow into the well; and
- flowing the production through the closed vent assembly, which has been opened, and into the tubing string to the surface.
- 3. A method of completing a well comprising the steps of:
- lowering a packer, an open vent assembly, and a closed vent assembly into a well on the end of a tubing string;
- permitting the flow of well fluids into the tubing string through the open vent assembly as the tubing string is lowered into the well;
- setting the packer;
- closing the open vent assembly to fluid flow;
- removing a predetermined portion of the well fluids from inside the tubing string to achieve a predetermined underbalance on the well;
- opening the closed vent assembly for the flow of production fluids;
- backsurging the perforations of the producing well; and
- flowing the production through the closed vent assembly, which has been opened, and into the tubing string to the surface.
- 4. A method of completing a well comprising the steps of:
- lowering a packer, an open vent assembly, a closed vent assembly, and perforating gun into a well on the end of a tubing string;
- permitting the flow of well fluids into the tubing string through the open vent assembly as the tubing string is lowered into the well;
- locating the perforating gun adjacent the pay zone to be perforated;
- displacing the well fluids in the tubing string by pumping a lighter fluid into the tubing string and circulating the well fluids out through the open vent assembly;
- setting the packer;
- closing the open vent assembly to fluid flow;
- opening the closed vent assembly for the flow of production fluids;
- detonating the perforating gun to perforate the well to permit production fluids to flow into the well; and
- flowing the production fluids through the closed vent assembly, which has been opened, and into the tubing string to the surface.
- 5. A method of completing a well comprising the steps of:
- lowering a packer, an open vent assembly, a closed vent assembly, and perforating gun into a well on the end of a tubing string;
- permitting the flow of well fluids into the tubing string through the open vent assembly as the tubing string is lowered into the well,
- circulating fluids through the tubing string and into the casing annulus through the open vent assembly;
- setting the packer;
- closing the open vent assembly to fluid flow;
- swabbing the tubing string substantially dry;
- opening the closed vent assembly for the flow of production fluids;
- detonating the perforating gun to perforate the well and permit production fluids to flow into the well; and
- flowing the production fluids through the closed vent assembly, which has been opened, into the tubing string and to the surface.
- 6. A method of completing a well comprising the steps of:
- lowering a packer, an open vent assembly, a closed vent assembly, and perforating gun into a well on the end of a tubing string;
- permitting the flow of well fluids into the tubing string through the open vent assembly as the tubing string is lowered into the well;
- locating the perforating gun adjacent the formation to be perforated;
- displacing the well fluids in the tubing string by pumping nitrogen down the tubing string;
- setting the packer;
- closing the open vent assembly to fluid flow;
- bleeding a portion of the nitrogen from the tubing string to create a predetermined hydrostatic head in the tubing string;
- opening the closed vent assembly for the flow of production fluids;
- detonating the perforating gun to perforate the well and permit production fluids to flow into the well; and
- flowing the production fluids through the closed vent assembly, which has been opened, and into the tubing string to the surface.
- 7. A method of completing a well comprising the steps of:
- lowering a packer, open vent assembly and perforating gun into the well on the end of a tubing string;
- permitting the flow of well fluids into the tubing string through the open vent assembly as the tubing string is lowered into the well;
- setting the packer;
- closing the open vent assembly to fluid flow;
- removing a portion of the well fluids from inside the tubing string to collapse a vertical frangible disc mounted in the tubing string to permit the flow of production fluids into the tubing string;
- detonating the perforating gun to perforate the well and permit production fluids to flow into the well; and
- flowing the production fluids through the flow path created by the collapsed vertical frangible disc and into the tubing string to the surface.
Parent Case Info
This is a continuation of application, Ser. No. 512,233 filed July 11, 1983, now abandoned.
US Referenced Citations (3)
Number |
Name |
Date |
Kind |
3112795 |
Keithahn |
Dec 1963 |
|
4040485 |
Vann et al. |
Aug 1977 |
|
4299287 |
Vann et al. |
Apr 1981 |
|
Continuations (1)
|
Number |
Date |
Country |
Parent |
512233 |
Jul 1983 |
|