“Remedial Cleanup, Sand Control and Other Stimulation Treatments,” by A. W.. Coulter, Jr., S. J. Martinez, and K. F. Fischer, Petroleum Engineering Handbook, Howard B. Bradley, Editor-in-Chief, Chapter 56, pp. 56-1 and 56-8, (1987). |
“Sand Control,” by robert M. Pearson, IHRDC Video Library for Exploration and Production Specialists, PE306 Petroleum Engineering, p. 97, (1988). |
“Frac Packs Justify Extra Up-Front Cost,” by Brian Stewart, The American Oil & Gas Reporter, vol. 41, No. 2, pp. 96-101, (Feb. 1998). |
“Frac Packs: A Specialty Option or Primary Completion Technique?,” Hart's Petroleum Engineer International, vol. 70, No. 3 (suppl), pp. 12-15 (Mar. 1997). |
“Frac Packs—State of the Art,” by Robert L. Tiner, John W. Ely, and Richard Schraufnagel, Annu. SPE Tech. Conf. (Denver Oct. 6-9, 1996), pp. 381-390, (SPE-36456; 45 refs). |
“Fracturing, Frac-Packing and Formation Failure Control: Can Screenless Completions Prevent Sand Production?,” by Nobuo Morita, Bob Burton, and Eric Davis, Annu. SPE Tech. Conf. (Denver Oct. 6-9, 1996), pp. 391-402, 1996 (SPE-36457; 5 refs). |
“Frac and Pack Stimulation: Application, Design, and Field Experience From the Gulf of Mexico to Borneo,” by L. P. Roodhart, P. A. Fokker, D. R. Davies, Jacob Shlyapobersky, and G. K Wong, 68th Annual SPE Tech. Conf. (Houston Oct. 3-6, 1993), pp. 507-518, 1993 (SPE-26564; 13 refs). |