Claims
- 1. A method of simultaneously conducting well operations at a first underwater well and a second underwater well from a moveable platform floating upon the surface of a body of water, said platform having;
- well operations equipment thereon, and
- anchor cable length adjustment means carried by said platform and being operable to regulate the length and tension of anchor cables operatively engaged to said anchor cable length adjustment means, said anchor cables depending downward from said anchor cable length adjustment means through said body of water to discrete anchors arranged in an array at the bottom of said body of water, said platform thereby operatively connected to said anchors by said anchor cables and anchored in a first vertical position, said first vertical position defined by a substantially vertical relationship between said platform and an area defined within the perimeter formed by the anchors of said anchor array, said method of simultaneously conducting well operations at said first underwater well and said second underwater well including the steps of;
- operatively engaging a marine riser between said floating platform and well equipment disposed upon the bottom of said body of water positioned at said first underwater well located substantially beneath said floating platform,
- laterally displacing and bending a portion of said marine riser by moving said floating platform from said first vertical position to a second vertical position defined by a substantially vertical relationship between said platform and said second underwater well by adjusting the length of said anchor cables, and
- lowering well operations equipment means into contact with the bottom of said body of water at said second underwater well, said well operations equipment means operatively engaged to the lower end of conduit means that depend downwardly from said floating platform, the upper end of said conduit means operatively engaged to the lower end of conduit means that depend downwardly from said floating platform, the upper end of said conduit means operatively engaged to said floating platform.
- 2. The method of claim 1 including, prior to the step of lowering well operations equipment means into contact with the bottom of said body of water, the steps of;
- assembling the well operations equipment means on said floating platform from said well operations equipment;
- attaching said well operations equipment means to the lower end of said conduit means;
- lowering said well operations equipment means vertically downward through said body of water by extending said conduit means downward through said body of water.
- 3. The method of claim 1 wherein the step of laterally displacing said floating platform to a second vertical position further includes the step of;
- defining said second vertical position substantially vertically above said area defined within the perimeter formed by the anchors of said anchor array.
- 4. The method of claim 1 wherein the step of lowering well operations equipment means into contact with the bottom of said body of water further includes the step of;
- carrying a well conductor which forms a portion of the well operations equipment means at the lower end of said conduit means,
- moving the lower end of said well conductor in a vertically-downward direction from a position adjacent the bottom of the body of water towards said bottom, thereby
- contacting said well conductor in a vertical manner with said bottom.
- 5. A method of simultaneously conducting well operations at a first underwater well and a second underwater well from a platform floating upon the surface of a body of water, said platform having;
- well operations equipment thereon, and
- platform positioning means capable of maintaining said platform in a first vertical position and a second vertical position, said positioning means operatively engaged to said platform, said method of simultaneously conducting said well operations at said first underwater well and said second underwater well including the steps of;
- operatively engaging a marine riser between said floating platform positioned at said first vertical position and well equipment disposed upon the bottom of said body of water positioned at said first underwater well located substantially beneath said floating platform,
- laterally displacing and bending a portion of said marine riser by moving said floating platform from said first vertical position to said second vertical position defined by a substantially vertical relationship between said platform and said underwater well by activation of said platform positioning means, and
- lowering well operations equipment means into contact with the bottom of said body of water at said second underwater well, said well operations equipment means operatively engaged to the lower end of conduit means that depend downwardly from said floating platform, the upper end of said conduit means operatively engaged to said floating platform.
- 6. The method of claim 5 including, prior to the step of lowering well operations equipment means into contact with the bottom of said body of water, the steps of;
- assembling from said well operations equipment the well operations equipment means on said floating platform,
- attaching said well operations equipment means to the lower end of said conduit means,
- lowering said well operations equipment means vertically downward through said body of water by extending said conduit means downward through said body of water.
- 7. The method of claim 5 wherein the step of lowering well operations equipment means into contact with the bottom of said body of water further includes the step of;
- carrying a well conductor which forms a portion of the well operations equipment means at the lower end of said conduit means,
- moving the lower end of said well conductor in a vertically-downward direction from a position adjacent the bottom of the body of water towards said bottom, thereby
- contacting said well conductor in a vertical manner with said bottom.
- 8. A method or simultaneously conducting well operations at a first underwater well and a second underwater well from a moveable platform floating upon the surface of a body of water, said platform having;
- well operations equipment thereon, and
- platform positioning means capable of maintaining said platform in a first vertical position and subsequently moving said platform from said first vertical position to a second vertical position and maintaining said platform in said second vertical position, said first vertical position defined by a substantially vertical relationship between said platform and a location on the bottom of said body of water, said positioning means operatively engaged to said platform,
- said method of simultaneously conducting said well operations at said first underwater well and said second underwater well including the steps of;
- operatively engaging a marine riser between said floating platform and well equipment disposed upon the bottom of said body of water positioned at said first underwater well located substantially beneath said floating platform,
- laterally displacing and bending a portion of said marine riser by moving said floating platform from said first vertical position to said second vertical position defined by a substantially vertical relationship between said platform and said location for said second underwater well upon said bottom of said body of water by activation of said platform positioning means, and
- lowering well operations equipment means into contact with the bottom of said body of water at said location for said second underwater well, said well operations equipment means operatively engaged to the lower end of conduit means that depend downwardly from said floating platform, the upper end of said conduit means operatively engaged to said floating platform.
- 9. A method of simultaneously conducting well operations at a first underwater well and at a second underwater well from a platform floating upon the surface of a body of water, said method including the steps of;
- providing a vertically-oriented marine riser operatively engaged between said platform, and said first underwater well disposed vertically below said platform upon the bottom of said body of water,
- moving said platform from said vertical position above said first underwater well, thereby
- laterally displacing and bending a portion of said marine riser,
- positioning said platform vertically above said second underwater well,
- lowering well operations equipment means from said floating platform downward into contact with said second underwater well, and
- placing said first underwater well and said second underwater well in fluid communication with said platform.
- 10. A method of simultaneously conducting well operations at a first well and at a second well from a platform floating upon the surface of a body of water, said method including the steps of;
- positioning said floating platform above said first well,
- operatively engaging a first marine riser between said floating platform and said first well thereby initiating well operations at said first well,
- moving said platform away from above said first well, movement of said platform laterally displacing and bending a portion of said first marine riser, and
- initiating well operations at said second well by use of well operations equipment means lowered downwardly from said floating platform into contact with the bottom of said body of water.
- 11. A method of simultaneously conducting well operations at a first well and at a second well from a platform floating upon the surface of a body of water, said method including the steps of;
- positioning said floating platform above said first well,
- operatively engaging a first marine riser between said floating platform and said first well thereby initiating well operations at said first well,
- moving said platform away from above said first well, movement of said platform laterally displacing and bending a portion of said first marine riser, and
- operatively engaging a second marine riser between said floating platform and said second well thereby initiating well operations at said second well.
- 12. A method of simultaneously conducting well operations at a first well and at a second well from a platform floating upon the surface of a body of water, said method including the steps of;
- positioning said floating platform in said body of water at a first vertical position,
- drilling a first well below said floating platform by use of well operations equipment means lowered downwardly from said floating platform into contact with the bottom of said body of water, thereby initiating well operations at said first well,
- preparing said first well to produce well fluids to said platform by operatively engaging a first marine riser between said first well and said platform,
- moving said platform away from above said first well to a second vertical position, movement of said platform laterally displacing and bending a portion of said first marine riser, and
- drilling a second well below said floating platform, thereby initiating well operations at said second well.
- 13. A method of simultaneously conducting well operations at a first well and at a second well from a platform floating upon the surface of a body of water, said method including the steps of;
- positioning said floating platform in said body of water at a first vertical position,
- drilling a first well below said floating platform, by use of well operations equipment means lowered downwardly from said floating platform into contact with the bottom of said body of water, thereby initiating well operations at said first well,
- preparing said first well to produce well fluids to said platform by operatively engaging a first marine riser between said first well and said platform,
- moving said platform away from above said first well to a second vertical position above said second well, movement of said platform laterally displacing and bending a portion of said first marine riser, and
- operatively engaging a second marine riser between said floating platform and said second well, thereby initiating well operations at said second well.
Parent Case Info
This is a continuation of application Ser. No. 790,711, filed Oct. 24, 1985, now abandoned.
US Referenced Citations (11)
Foreign Referenced Citations (1)
Number |
Date |
Country |
2097358 |
Nov 1982 |
GBX |
Continuations (1)
|
Number |
Date |
Country |
Parent |
790711 |
Oct 1985 |
|