1. Technical Field
The technology relates to the field of fluid storage tanks, and more particularly to the fabrication of large above-ground storage tanks that can be used to contain brine, for example, in connection with oil and gas production. 2. Description of the Related Art
There has been an increasing demand for energy world-wide. As a result, many different technologies are being used to meet this demand, and many are under development. Current technologies include, for example, traditional oil and gas production, secondary and enhanced oil and gas recovery techniques, coal production, use of solar panels and wind turbines to generate electricity, production of bio-fuels, use of ocean waves to generate electricity, and the use of nuclear reactors to generate electricity. It is known that in several parts of the world there are large subterranean reservoirs of natural gas, a desirable clean burning fuel, held in relatively impermeable geological formations. The relative impermeability of these formations presents a challenge to the production of these gas reserves because the gas is “tightly held” within the formations and cannot readily flow to a production well.
The technique of hydraulic fracturing of impermeable subterranean formations is being used to produce gas from relatively impermeable formations. Hydraulic fracturing, also known as “fracking” or “hydro-fracking,” is a technology that fractures underground formations creating flow pathways for release of the trapped natural gas and production of that gas for commercial purposes.
During gas production, “brine” containing injected chemicals is produced. This brine must be disposed of in an environmentally acceptable manner. In addition, the fracking operation typically consumes large amounts of water for hydraulic fracturing of the formations. So, before fracking there is a need for short term storage of the hydro-fracking fluid, and after fracking there is a need to store the brine produced.
Brine may be stored above ground in storage tanks for a period of time. There are several different tank designs. However, they should preferably meet criteria of durability and resistance to leaks under the conditions of use, and should be relatively easy and inexpensive to transport and construct. In the case of some above-ground tank designs that require conjoining a series of wall sections, there are significant challenges on site in handling the heavy metal wall sections. Each wall section is hoisted by a crane and guided into place next to other already installed wall sections. In order to join wall sections together, depending upon the nature of the mechanical joining, it is often necessary to get alignment between the wall sections and overlap of the wall edges. Once aligned, the sections are joined together with mechanical connectors. To facilitate joining heavy wall sections together, workers have to manipulate the wall sections into appropriate position relative to each other. The use of manpower in proximity to heavy wall sections, while man-handling the wall sections, poses an issue of potential risk to the worker. In addition, the use of additional manpower to guide the wall sections incurs labor costs.
The following is a summary of some aspects and exemplary embodiments of the present technology, of which a more detailed explanation is provided under the Detailed Description section, here below.
An exemplary embodiment provides a tank wall section having a tank wall body. The tank wall body has a first end that includes a series of spaced apart through holes. The tank wall body also has a second end that includes a series of spaced apart nubs. The nubs are sized, configured and spaced apart to register with the series of spaced apart through holes of a second tank wall section. The two tank wall sections are urged into alignment such that at their respective ends the nubs of one wall section fit into and extend through the through holes of the other wall section. The nubs each have affixing through holes extending from a first side of the nub through to an opposite side of the nub. The affixing through holes are each sized and shaped to receive a retaining pin extending through the first side of the nub and through the opposite side of the nub to thereby couple the tank wall section to a second tank wall section.
Another exemplary embodiment provides a method of connecting a plurality of tank wall sections together to construct a tank wall. The method includes the steps of selecting a first tank wall section having a first end and a second end; aligning the first end of the first tank wall section with a second end of a second tank wall section. In addition, it includes urging the first end of the first tank wall section toward the second end of the second wall section, then aligning the wall sections relative to each other. In the alignment step, mechanical structure proximate the end of one tank wall section engages with cooperating mechanical structure of the other tank wall end. The following steps include fastening the first end of the first tank wall section to the second end of the second wall section.
Another exemplary embodiment provides a tank constructed from a series of tank wall sections joined end to end. The tank wall includes a plurality of tank wall sections. Each tank wall section comprising a tank wall section body. Adjacent tank wall sections are joined together at their respective ends by connectors formed at least in part by cooperating mechanical structure at the ends of the tank walls. Each tank wall section has a tank wall body that has a first end that has a series of spaced apart through holes; and a second end including a series of spaced apart nubs. The nubs of a first tank wall section are configured and spaced apart to register with the series of spaced apart through holes of a second tank wall section. Each of the nubs have an affixing through hole extending from a first side through an opposite side, and a retaining pin is inserted into the affixing through hole. Thus, the tank wall is formed by aligning each of the wall sections with an adjacent wall section, bringing the ends of the wall sections into flush fitting relationship with each other, and inserting the retaining pins into the affixing through holes.
Various embodiments will be described in conjunction with the following drawings which are schematic, not to scale, and wherein like numerals denote like elements, and:
The following provides a detailed description of exemplary embodiments of the tank wall section connectors, methods of using these connectors to make tank walls, and the tank walls constructed with the tank wall connectors. It should be understood that describing examples of these embodiments facilitates an understanding of the inventions, but the exemplary embodiments do not limit the scope of the inventions in any way. The inventions are demarcated only by the claims appended here below.
As a preliminary matter, liquids, such as brine and other fracking fluids, may be stored above ground in large storage tanks for a period of time. These wall sections are fabricated off-site in a machine-shop environment, and are very heavy because the tank wall has to be strong to be able to withstand significant force vectors generated by the mass of liquid in the tank. The wall sections are hoisted with cranes and stacked onto vehicles, like flat bed trucks, to be hauled to the site where the tank is to be constructed. As pointed out above, on site there are significant challenges in handling the heavy metal wall sections and in constructing the tank wall. Each wall section is hoisted by a crane and guided into place next to other already installed wall sections. In order to join wall sections together it is necessary to get alignment between the wall sections and overlap of the wall edges. To facilitate joining the heavy wall sections together, workers have had to manipulate the wall sections into appropriate position relative to each other. The use of manpower in proximity to heavy wall sections, while man-handling the wall sections, poses an issue of potential risk to the worker. In addition, the use of additional manpower to guide the wall sections incurs labor costs.
Exemplary embodiments provide tank walls constructed from a plurality of tank wall sections that are stackable for ease of transporting a plurality of sections one atop the other on a flat bed. Moreover, the exemplary tank wall sections have ends that are configured for ease of alignment with adjacent tank wall sections, through mechanical structure at the first ends that facilitate alignment through registration with cooperative mechanical structure at the second end. Further, the exemplary tank wall sections are conjoined to adjacent tank wall sections with connectors that are rugged, inexpensive to mass produce and very effective and easy to use in the field on-site.
Referring to
Referring to
As pointed out above, the tank wall sections 110 are heavy. To facilitate lifting, transporting and manipulating the tank wall sections, they may be equipped with support receptacles 135, as in the illustrated embodiments. These examples of support receptacles 135 are trapezoidal in shape, but other shapes are also possible. The support receptacles 135 are each secured to the tank wall section with the upper end abutting a cross beam 138 that extends between the three innermost support struts 130. The support receptacles have slots 136 formed in their sides so that lifting plates (not shown), carried at the front end of a lifting crane, of corresponding shape to the support receptacles can slide into the slots 136. This facilitates lifting, transporting, manipulating and aligning the tank wall sections. Further, upon completion of these functions, the tank wall sections may be set down by sliding the lifting plates out of the support receptacles 135.
In the illustrated exemplary embodiments, the tank wall end portions 112, 114 include structure that facilitates conjoining the tank wall sections 110 together to construct a tank wall 115. One tank wall end portion 112 includes a vertically extending bracket 144 (which may be part of outermost wall plate 130) extending out beyond the outermost of struts 130. (In this context, vertical and horizontal refer to the orientation when the tank wall section is in the constructed tank wall.) Bracket 144 includes a series of vertically spaced apart through holes 145. As will become clear later, the size and shape of the through holes 145 should be configured to receive protruding structure, such as nubs of a different tank wall section.
The opposite end portion 114 of tank wall 110 includes a vertically-extending bracket 144 (which may be part of outermost wall plate 130) extending out beyond the outermost of struts 130. The bracket 144 is supplied with a vertical array of nubs 146, spaced, sized and shaped to register with and fit within through holes 145′ of another tank wall section. In addition, the bracket 144, in the illustrated exemplary embodiment, includes three spaced apart elongated nubs 148. These elongated nubs 148 are also spaced, sized and shaped to register with and fit within through holes 145′ of another tank wall section. The elongated nubs, as described here below, also serve to guide those tank wall sections to be conjoined into appropriate alignment for the wall section interconnections to be made.
While the exemplary embodiments depict nubs that appear to be square, other shapes of mechanical structures may also be used, as long as these extend outward (“protrude”) from the tank wall end portion and mechanically engage cooperating mechanical structure on the end of another tank wall section, such that the mechanical structure and the cooperating mechanical structure can be locked together to form a connector. Examples of other shapes include pyramidal shapes, frusto-conical shapes, conical shapes, cylindrical shapes, star-shapes, and the like. Forming the connector may require a locking device, such as a retaining pin, a bolt, a threaded or unthreaded rod, a metal ring, or ring portion, and the like. Generally, the mechanical structure at one tank wall end may be referred to as a “male” connector part, and the cooperating mechanical structure at the end of the other tank wall section may be referred to as a “female” connector part. The male and female connector parts are sized and configured to engage mechanically, for example like the nubs fitting into the through holes, and a locking device, for example like a locking pin, locks the male and female connector parts together to form the connector. A plurality of such connectors arrayed vertically along the ends of the tank wall sections join adjacent tank wall sections together.
It should be clear that as the elongated nubs 148 enter the corresponding through holes 145′ and align the two wall sections, the other nubs 146 also enter their corresponding through holes 145′. To ensure this, the end bracket 144 may be supplied with two or more elongated nubs. The illustrated example of
Notwithstanding the guided engagement illustrated stage-wise in
As shown, the drawdown bracket 160 has a through hole and a bolt 162 passes through the hole and is threaded to a threaded hole in the flat top 154 of the nose 152 of the elongated nub 148. As the bolt 162 is screwed into the threaded hole in the top 154 of the elongated nub, the two end tank wall brackets 144 and 142′ are urged toward each other and into alignment with each other by the pull force of the bolt on end bracket 144, the push force of the clamp 160 on the end bracket 142′, and the guiding provided by the shape of elongated nose 152. The shape of the elongated nose 152 facilitates centering the elongated nose within the through hole 145′ of tank wall end section 142′. Thus, the tank wall clamp, comprised of drawdown bracket 160 and bolt 162, urges the two end brackets 144 and 142′ flush against each other and into alignment with each other, and in the process the other nubs 146 are also forced into alignment with, and are slotted within, through holes 145′ of tank wall section 110′. This flush alignment of all nubs 146, 148 with all through holes 145′ permits the affixing through holes 147 on the nubs 146, 148 to emerge on the outside of the ends of the flush end brackets to receive retaining pins 149, as shown in
While at least one exemplary embodiment has been presented in the foregoing detailed description section, it should be appreciated that many variations exist. It should also be appreciated that the exemplary embodiments are only examples, and are not intended to limit the scope, applicability, or configuration of the claimed inventions in any way. Rather, the foregoing detailed description provides a convenient road map for those of ordinary skill in the art to implement exemplary embodiments. It should be understood that various changes can be made in the function and arrangement of elements described herein without departing from the scope of the patent claims listed below, including the legal equivalents of these patent claims.
This application is a Continuation of U.S. patent application Ser. No. 13/495,842 filed Jun. 13, 2012, which is incorporated herein by reference in its entirety.
Number | Date | Country | |
---|---|---|---|
Parent | 13495842 | Jun 2012 | US |
Child | 13970810 | US |