This application claims priority to Italian Patent Application No. 102022000024477 filed on Nov. 28, 2022, the entire contents of which is hereby incorporated in its entirety by reference
The present invention relates to a method of constructing and launching an offshore semi-submersible platform and to an offshore semi-submersible platform thus constructed.
In general, the offshore semi-submersible platform according to the invention is intended to support plants for generating energy from renewable sources, as well as it can be intended to support auxiliary components for offshore farms which produce energy from renewable sources, such as floating power substations, auxiliary support stations, accommodation for technical personnel, etc., for example.
In particular, such a platform is intended to support an offshore wind generator.
The offshore semi-submersible platform according to the invention can also be used in the oil & gas industry to support plants for the exploitation of hydrocarbon deposits.
Wind farms on seacoasts for exploiting clean renewable energy, extractable from the wind, are a well-known and long-established reality and contribute to the reduction of pollution of various kinds, caused by the indiscriminate use of fossil fuels.
In a context of increasing energy production from renewable sources, production from wind sources plays a fundamental role, for both terrestrial and marine implementations thereof. However, the inconvenience associated with installing wind turbines on land and essentially linked to the impact on the landscape and noise pollution leads to moving such installations away from the most densely crowded areas, which however also appear to be the most energy hungry, moving them on sea on the coastal area, where possible.
The current technology for exploiting wind power in the marine industry is limited by the availability of suitable coasts and by the threshold depths of about 50 m beyond which the current technology of poles or pylons fixed into the seabed is halted.
The availability of suitable sites, as described above, is gradually dying out. Furthermore, the availability of energy to be extracted from the wind is much higher moving off the coast in deeper waters, but also more hostile from the point of view of weather-marine conditions.
On the one hand, moving away from the coast will entail higher costs, but on the other it will ensure enormous wind power potential. For example, in the seas of Northern Europe, the intensity of the wind on the high seas is 35-50% greater than on the coast; this means twice as much energy available, since the latter is proportional to the cube of the wind speed.
Such a situation requires searching for new technical solutions which allow extending offshore wind power farms in areas which, until recently, were considered unusable from the point of view of available technical means and from the economic point of view.
Proposals for floating means of various kinds and shapes have been recently put forward, but, due to various technical/constructional and/or installation and/or maintenance complications, they are generally unattractive from the economic point of view.
It is currently estimated that the cost for installing a wind generator fixed to the seabed is lower than that for installing it on an offshore floater. There is therefore the need to actively seek appropriate technical and production solutions which make floating installations less expensive. According to IEA data, global average upfront capital costs for offshore wind power (including transmission) are projected to significantly decline with respect to today's average by 2030. This is based on the assumed learning rate which sees capital costs decline by 15% each time the installed power doubles.
At the moment there are only a few prototype experiments installed offshore in various parts of the world (Norway, USA, Japan) which aim to demonstrate the effective seakeeping and economic convenience of various design proposals which are conceptually very different from one another.
The technical solutions of the suggested floaters vary according to the depth and the weather-marine conditions which they address.
There are different types of floating wind power platforms inspired by the offshore Oil & Gas industry. These are supported by floating structures, with 6 degrees of freedom, which can be energised by wave loads, wind, and ocean currents. The whole system must then be moored and stabilised using mooring lines, ballast, or large floating areas.
The main concepts for floating platforms are: Spar-Buoy, Tension leg platform (TLP), Barge, and Semi-submersible.
Spar-buoy technology SP (diagrammatically shown in
The technical issues associated with this type of floater are the difficulty of constructing the spar-buoy, which requires shipyards with a great launch depth, and the subsequent complexity of towing it to the final site and completing it with the installation of the turbine on the high seas, activities which are technically difficult and expensive.
Such aspects make the use thereof in wind farms, consisting of a large number of floaters, as provided for by the wind farms soon to be installed, complicated and industrially inefficient.
TLP platforms have a semi-submerged floating structure, anchored to the seabed with taut mooring lines which provide the necessary lateral stability, as diagrammatically shown in
The TLP solution, although it offers attractive efficiency expectations in terms of relative constructional simplicity, on the other hand, is characterised by major difficulties related to the lack of stability thereof during the step of being transferred to the final site and until the moorings are permanently positioned and tensioned.
The costs, times and technical difficulties when mooring on the final site make this type unattractive, considering the large numbers required by the next Wind Farms, which are characterised by large numbers of floaters.
The barge platform B (an example of which is diagrammatically shown in
An interesting quality of this type of floater is the relative simplicity of construction and the low immersion which allow the completion thereof at the shipyard and then a simple towing to the final site as well as an easy mooring to the predisposed lines; furthermore, typical shipbuilding construction also makes the inspection and maintenance step, as well as any restoration work, cost-effective. These features make the barge platform suitable for mass-production with large numbers and with ease of set-up at the construction plant. However, the Barge type is suitable for areas characterised by limited wave motion.
Semi-submersible platforms S are platforms which float semi-submerged on the surface of the sea, as diagrammatically shown in
This results in the need for a large and heavy structure to maintain stability, often made of steel with high structural weight and with manufacturing complexity due to the many welded connections.
In general, a semi-submersible platform is a versatile structure by virtue of the non-extreme immersion, as for the Spar-Buoy, and of the flexibility to adapt to the sea conditions of the site. However, these platforms are the most complex from a constructional point of view and therefore require more time and higher costs to be manufactured as compared to the others. For a shipyard, this type of hull presents some executive difficulties due to the fragmentation of the components, mainly pipes, when compared with typical shipbuilding carpentry constructions based on preferably plane reinforced metal sheets. Such a geometry also makes the inspection and maintenance step, as well as any restoration work, complex.
Similarly to the Spar-buoy type, the operational and launching immersions do not usually allow the construction of the floater to be completed on land even in the case of semi-submersible platforms (size and weight). This limits the size of the platform, which limit is essentially imposed by the potential of the shipyard and industrial opportunities.
The construction of a semi-submersible platform generally occurs in water with the aid of support barges which are sunk at the time of launching, thus allowing the platform to be launched. As the size of the platform increases, the size of the barges increases proportionally.
In any case, beyond the aforesaid operational limits during the construction step, the features of the semi-submersible platform make it suitable for being constructed in series, with large numbers and with a relative ease of set-up at the construction plant.
Due to the specific conditions of the marine installation site and the weather-marine situations (wind intensity, wave period and height), one type of floater can be more convenient than another one. Each structure has advantages and disadvantages thereof, which make it preferable depending, for example, on the depth of the sea or the distance from the coast (for some platforms the greatest difficulty is transport to the site).
In any case, in addition to the performance features of each individual type of floater, it will also be necessary to take into consideration, in the immediate future, the industrialization qualities, so as to meet market demands, which will require a large number of wind power floaters within a short time.
In the light of the features of the floating platforms known up to now, in the field of floating wind power platforms, the need to have a floater which meets the following needs is strongly felt:
Given the above, the most promising type of platform for meeting such needs is the semi-submersible platform.
As already highlighted, these platforms are the most complex from a constructional point of view and therefore require more time and higher costs to be manufactured as compared to the others. For a shipyard, this type of hull presents some executive difficulties due to the fragmentation of the components, mainly pipes, when compared with typical shipbuilding carpentry constructions based on preferably plane reinforced metal sheets.
Similarly to the Spar-buoy type, the operational and launching immersions do not usually allow the construction of the floater to be completed on land even in the case of semi-submersible platforms (size and weight). This limits the size of the platform, which limit is essentially imposed by the potential of the shipyard and industrial opportunities.
In the field of floating platforms, the need is thus strongly felt to have a method of constructing an offshore semi-submersible platform which allows overcoming the current operational limits in terms of maximum size of the platform, significantly reducing construction times and costs, without however affecting the performance of the platform itself.
In particular, such a construction method needs to be capable of being industrialized to allow the production and assembly of a large number of large units (wind turbines of 10 MW and more) in short times, compatible with the investment costs of large wind farms planned for the near future.
Such a need is currently completely unmet.
Therefore, it is the main object of the present invention to eliminate or at least mitigate the drawbacks of the above-mentioned prior art, providing a method of constructing and launching an offshore semi-submersible platform which allows overcoming the current operational limits in terms of maximum size of the platform, significantly reducing construction times and costs, without however penalizing the performance of the platform itself.
It is a further object of the present invention to provide a method of constructing and launching an offshore semi-submersible platform which allows carrying out welding operations in a dry environment while operating below the water level, in a simply implementable and operatively reliable manner.
The technical features of the invention according to the aforesaid objects can be clearly found in the contents of the claims hereinbelow and the advantages thereof will become more apparent from the following detailed description, given with reference to the accompanying drawings which show one or more embodiments thereof merely given by way of non-limiting example, in which:
For simplicity of disclosure, the offshore semi-submersible platform constructed according to the constructing and launching method will be described first, and the method according to the invention will be described afterwards.
With reference to the accompanying drawings, an offshore semi-submersible platform according to the invention has been indicated as a whole by 1.
Here and in the following description and the claims, reference will also be made to the platform 1 in a use condition. In this sense, therefore, any reference to a lower or higher position, to a horizontal or vertical direction, or to an emerged or immersed condition must be understood.
Semi-submersible platform means a floating structure of the semi-submersible type designed to support plants of various types; in general, a semi-submersible platform can be provided with one or more bridges which are not necessarily continuous, as well as it can be free of bridges.
According to a general embodiment of the invention, the offshore semi-submersible platform 1 comprises a plurality of floating columns 110, 120, 130, 140.
On the top of one of said floating columns 110, 120, 130, 140 a tower can be installed for supporting a bladed wind generator. Alternatively, resting on the top of said floating columns 110, 120, 130, 140, one or more bridges can be created for supporting plants of various types.
In general, the offshore semi-submersible platform according to the invention is intended to support plants for generating energy from renewable sources, as well as it can be intended to support auxiliary components for offshore farms which produce energy from renewable sources, such as floating power substations, auxiliary support stations, accommodation for technical personnel, etc., for example.
In particular, such a platform is intended to support an offshore wind generator.
The offshore semi-submersible platform according to the invention can also be used in the oil & gas industry to support plants for the exploitation of hydrocarbon deposits.
Each of said floating columns 110, 120, 130, 140 is connected to at least one other of said floating columns by means of at least one lower structural connection arm 111, 121, 131, 141, 151, 161 which is placed connecting between the two columns near their bases 110b, 120b, 130b, 140b.
Preferably, each of the lower structural connection arms 111, 121, 131, 141, 151, 161 is arranged at least partially below the launching waterline LWL of the platform itself (as shown in
Alternatively, each of the lower structural connection arms 111, 121, 131, 141, 151, 161 can be arranged above the launching waterline LWL of the platform itself.
Waterline means the level of immersion in water of the platform. The waterline of a semi-submersible platform is variable depending on the load condition of the platform itself. In general, at least three waterlines can be identified: launching; transiting; operating. Each of them is variable within a certain range; therefore, waterline relates to an average value. The shallowest waterline is the launching one, i.e., when the platform load is generally the minimum possible to facilitate the launching operations, net of possible ballast. The deepest waterline is the operating one, i.e., when the load of the platform is generally comprised within the nominal sizing range, in this case being the platform fully operational. The intermediate waterline is the transiting one, i.e., when the load of the platform is generally higher with respect to that at launching, but minimised to facilitate movement operations in water from the construction and launching site to the installation site.
In the offshore submersible platform 1, the fact that the lower structural connection arms 111, 121, 131, 141, 151, 161 are at least partially below the launching waterline LWL of the platform itself means that the lower structural arms are never completely emerged from water and generally, in operational conditions, they are completely immersed in water.
Advantageously, if the lower arms are tubular and therefore internally hollow, the fact that the lower structural connection arms 111, 121, 131, 141, 151, 161 are at least partially below the launching waterline LWL of the platform itself allows to add buoyancy to that offered by the columns.
In accordance with a first aspect of the invention, each of said lower structural connection arms 111, 121, 131, 141, 151, 161 has a welding junction zone 511, 521, 531, 541, 551, 561 placed in an intermediate position between the respective two columns.
The aforesaid intermediate position can correspond to the centreline position or to any position between the two columns.
In accordance with a second aspect of the invention, in said junction zone 511, 521, 531, 541, 551, 561, axial alignment means 400 are present between the two portions 111a and 111b, 121a and 121b, 131a and 131b, 141a and 141b, 151a and 151b, 161a and 161b of said structural arm, extending from two adjacent columns.
The presence of welding junction zones and the presence of axial alignment means at such junction zones are the traces left by the constructing and launching method according to the invention, as it will be apparent from the following description.
Preferably, as shown in
Each of said upper structural connection arms 112, 122, 132, 142, 152, 162 has a welding junction zone 512, 522, 532, 542, 552, 562 placed in an intermediate position between the respective two columns.
The aforesaid intermediate position can correspond to the centreline position or to any position between the two columns.
In said junction zone 512, 522, 532, 542, 552, 562, axial alignment means 400 are present between the two portions 112a and 112b, 122a and 122b, 132a and 132b, 142a and 142b, 152a and 152b, 162a and 162b of said structural arm, extending from two adjacent columns.
Also in this case, the presence of welding junction zones and the presence of axial alignment means at such junction zones are the traces left by the constructing and launching method according to the invention, as it will be apparent from the following description.
Preferably, as shown in the accompanying Figures, the lower connection arms 111, 121, 131, 141, 151, 161 are connected to the respective upper connection arms 112, 122, 132, 142, 152, 162 by intermediate structures 600.
Advantageously, said intermediate structures 600 are positioned between the lower and upper arms, spaced from the junction zones.
Preferably, said (lower and upper) connection arms consist of tubular bodies, having a circular or polygonal section.
Preferably, said intermediate structures consist of tubular bodies, having a circular or polygonal section.
According to the embodiments shown in
In accordance with the embodiments shown in
Preferably, the aforesaid axial alignment means 400 consist of:
Advantageously, as shown in
As shown in
Advantageously, each of the columns forming part of said peripheral annular structure 100 is connected to at least two other adjacent floating columns forming part of said annular structure also by means of at least two upper structural connection arms 112, 122, 132 which are placed connecting between the columns at a greater height than that of the respective lower connection arms 111, 121, 131, preferably above the launching waterline LWL of the platform itself. Said upper connection arms give further structural continuity to said peripheral annular structure 100.
Preferably, as shown in
According to an embodiment not shown in the accompanying Figures, the aforesaid peripheral annular structure 100 of polygonal shape can comprise one or more floating columns arranged along the sides of said polygonal shape.
According to the embodiment shown in
The aforesaid peripheral annular structure 100 may not have a polygonal shape, but have a curvilinear shape, for example circular or elliptical.
In accordance with the embodiment shown in
Advantageously, the internal floating column 140 can be structurally connected to one or more columns 110, 120, 130 of said annular structure 100 also by means of one or more upper internal structural connection arms 142, 152, 162, which are placed connecting between the columns at a greater height than that of the respective lower internal connection arms 141, 151, 161, preferably above the launching waterline LWL of the platform itself.
Alternatively, as shown in
Advantageously, the floating columns 110, 120, 130 which are arranged radially about said central column 140 can also be connected thereto by means of upper internal structural arms 142, 152, 162, which are placed connecting between the columns at a greater height than that of the respective lower internal connection arms 141, 151, 161, preferably above the launching waterline LWL of the platform itself.
Preferably, the floating columns and the connection arms, as well as the intermediate structures 600 between the arms and the motion damping structures, if provided, are made of steel.
The method of constructing and launching an offshore semi-submersible platform 1 according to the invention will now be described.
In general, the offshore semi-submersible platform 1, which can be constructed and launched according to the method of the invention, comprises a plurality of floating columns 110, 120, 130, 140, each of which is connected to at least one other of said floating columns by means of at least one lower structural connection arm 111, 121, 131, 141, 151, 161 which is placed connecting between the two columns near their bases 110b, 120b, 130b, 140b.
According to the invention, the method comprises the operating step a) of creating said semi-submersible platform 1 in a dry environment by dividing it into a plurality of sub-assemblies 11, 12, 13, 14, each of which comprises:
Semi-arm means one of the two end portions into which a structural connection arm can be divided.
The single sub-assembly can also comprise two or more floating columns. In this case, the respective connection arms between the columns of the same sub-assembly are already made directly in a dry environment.
Advantageously, implementation in a dry environment can occur on land (for example on a quay B) or on a sinkable barge.
As shown in
The method then comprises the operating step c) of separately launching in water the individual sub-assemblies 11, 12, 13, 14 which float independently by virtue of the respective floating column 110, 120, 130, 140.
Advantageously, the launch of the sub-assemblies can be carried out by means of any method adapted for the purpose, such as by masonry basin flooding, floating basin immersion, or immersion from an inclined slipway (if the operating steps conducted in a dry environment are conducted on land) or sinking barges (if the operating steps conducted in a dry environment are conducted on a sinkable barge), for example.
The method then comprises the following operating steps:
Operatively, according to the invention, the temporary thrust boxes 101, 102; 201, 202; 301, 302, 401, 402, 501, 502, 601, 602 have essentially two functions:
According to the invention, dividing the platform 1 into a plurality of self-floating sub-assemblies and the aid of temporary thrust boxes allow to overcome the current operational limits, in terms of maximum size of the platform. The platform is no longer constructed to be launched already complete; conversely, according to the invention, the platform is constructed to be launched in blocks (self-floating sub-assemblies) which are then structurally connected to one another in water. Thereby, there are no limits to the final size of the platform. Such a constructing and launching method does not require changes to the structure of the semi-submersible platform, the performance of which is therefore not penalized. Furthermore, following the method according to the invention, production times and costs are significantly reduced.
Preferably, each of the lower structural connection arms 111, 121, 131, 141, 151, 161 (and therefore the respective semi-arms) is placed connecting between the two columns near their bases 110b, 120b, 130b, 140b, at least partially below the launching waterline LWL of the platform itself (as shown in
Alternatively, each of the lower structural connection arms 111, 121, 131, 141, 151, 161 (and therefore the respective semi-arms) can be arranged above the launching waterline LWL of the platform itself.
Advantageously, the fact that the semi-arms of the lower structural connection arms 111, 121, 131, 141, 151, 161 are at least partially below the launching waterline LWL of the platform itself allows the use of thrust boxes having reduced heights with respect to the case in which the lower arms are positioned above the launching waterline LWL. In the latter case, in fact, the boxes must have a height at least equal to the positioning height of the semi-arms with respect to the launching waterline LWL. Conversely, in the first (preferred) case, the thrust boxes simply have to support the semi-arms which are completely immersed or at least partially immersed at launch and can extend much less in height above the launching waterline LWL.
Preferably, if the lower semi-arms are placed at least partially below the launching line, the method according to the invention includes the following:
By virtue of the method of constructing and launching an offshore semi-submersible platform according to the preferred embodiment of the invention, it is possible for welding to be carried out in a dry environment while operating below the water level, in a manner simple to implement and operatively reliable.
In the (not preferred) case in which the lower semi-arms are placed above the launching line, they are already in an emerged condition. The welding step g) is therefore carried out in a dry environment since the junction zone is naturally located above the water level. Therefore, during step f) of connecting the temporary thrust boxes to each other two-by-two, it is not necessary to create a watertight chamber at the junction zone between the free ends of the respective two semi-arms.
Advantageously, between step f) and step g), a further step of balancing the floatation level can be included (see
Preferably, as shown in the accompanying Figures, in the offshore semi-submersible platform 1 each of said floating columns 110, 120, 130, 140 is connected to said at least one other floating column by at least one further upper structural connection arm 112, 122, 132, 141, 152, 162, which is placed connecting between the two columns at a greater height than that of the respective lower connection arm 111, 121, 131, 141, 151, 161, preferably above the launching waterline LWL of the platform itself.
In particular, each of said sub-assemblies 11, 12, 13, 14 further comprises at least one semi-arm 112a; 112b; 122a; 122b; 132a; 132b; 142a; 142b; 152a; 152b; 162a; 162b of the respective upper connection arm 112; 122; 132; 142; 152; 162 which is already structurally integrated into the column itself and extends cantilevered therefrom with a respective free end 112a′; 112b′; 122a′; 122b′; 132a′; 132b′; 142a′; 142b′; 152a′; 152b′; 162a′; 162b′.
Operatively, the semi-arms 112a; 112b; 122a; 122b; 132a; 132b; 142a; 142b; 152a; 152b; 162a; 162b of the respective upper connection arms 112; 122; 132; 142; 152; 162 of the different sub-assemblies 11, 12, 13, 14 are connected to one another similarly to the semi-arms 111a; 111b; 121a; 121b; 131a; 131b; 141a; 141b; 151a; 151b; 161a; 161b of the respective lower connection arms 111; 121; 131; 141; 151; 161, however, without the direct aid of the thrust boxes, since operations are above the water level. Operatively, in fact, the boxes directly support only the semi-arms of the lower arms, balancing the weight of the latter and therefore of the sub-assembly, without necessarily having to reach the height of the semi-arms of the upper arms.
In the preferred case in which the upper connection arms (and the respective semi-arms) are placed above the launching waterline LWL, the method provides for the semi-arms 112a; 112b; 122a; 122b; 132a; 132b; 142a; 142b; 152a; 152b; 162a; 162b of the respective upper connection arms 112; 122; 132; 142; 152; 162 of the different sub-assemblies 11, 12, 13, 14 being connected to one another similarly to the semi-arms of the respective lower connection arms 111; 121; 131; 141; 151; 161, however, without the aid of the watertight chamber defined between the thrust boxes, since operations are above the water level.
Advantageously, in the platform 1, the lower connection arms 111; 121; 131; 141; 151; 161 are connected to the respective upper connection arms 112; 122; 132; 142; 152; 162 by intermediate structures 600. Said intermediate structures 600 are installed on said sub-assemblies 11, 12, 13, 14 in a dry environment (preferably on land or on a sinkable barge), in general before the launching step c).
Preferably, said sub-assemblies are made so that said intermediate structures 600 are positioned between the semi-arms of the lower and upper arms spaced from the free ends of the semi-arms themselves, so as not to interfere with the connection operations between sub-assemblies.
Preferably, said connection arms consist of tubular bodies, having a circular or polygonal section.
Preferably, said intermediate structures consist of tubular bodies, having a circular or polygonal section.
According to the embodiments shown in
In accordance with the embodiments shown in
Preferably, the aforesaid axial alignment means 400 consist of:
Advantageously, as shown in
Advantageously, each temporary thrust box 101, 102; 201, 202; 301, 302 is provided with a coupling portion 700 for interconnection with another thrust box.
Operatively, as shown in
Preferably, as shown in
As shown in
Each of said sub-assemblies 11, 12, 13 comprises at least one of the floating columns 110, 120, 130 forming part of said annular structure and at least two semi-arms 111a; 111b; 121a; 121b; 131a; 131b of the respective lower connection arms 111; 121; 131 which are already structurally integrated in the column itself and extend cantilevered therefrom with respective free ends 111a′; 111b′; 121a′; 121b′; 131a′; 131b′.
Advantageously, each of the columns forming part of said peripheral annular structure 100 is connected to at least two other adjacent floating columns forming part of said annular structure also by means of at least two upper structural connection arms 112, 122, 132 which are placed connecting between the columns at a greater height than that of the respective lower connection arms 111, 121, 131, preferably above the launching waterline LWL of the platform itself. Said upper connection arms give further structural continuity to said peripheral annular structure 100.
In this case, each of said sub-assemblies 11, 12, 13 additionally comprises at least two semi-arms 112a; 112b; 122a; 122b; 132a; 132b of the respective upper connection arms 112; 122; 132 which are already structurally integrated into the column itself and extend cantilevered therefrom with respective free ends 112a′; 112b′; 122a′; 122b′; 132a′; 132b′.
Preferably, as shown in
According to an embodiment not shown in the accompanying Figures, the aforesaid peripheral annular structure 100 of polygonal shape can comprise one or more floating columns arranged along the sides of said polygonal shape.
According to the embodiment shown in
In this case, each of said sub-assemblies 11, 12, 13 comprises one of the three floating columns 110, 120, 130 and at least two semi-arms 111a; 111b; 121a; 121b; 131a; 131b of the respective lower connection arms 111; 121; 131 which are already structurally integrated in the column itself and extend cantilevered therefrom with respective free ends 111a′; 111b′; 121a′; 121b′; 131a′; 131b′.
Advantageously, again in accordance with the embodiment shown in
In this case, each of said three sub-assemblies 11, 12, 13 additionally comprises at least two semi-arms 112a; 112b; 122a; 122b; 132a; 132b of the respective upper connection arms 112; 122; 132 which are already structurally integrated into the column itself and extend cantilevered therefrom with respective free ends 112a′; 112b′; 122a′; 122b′; 132a′; 132b′.
The aforesaid peripheral annular structure 100 may not have a polygonal shape, but have a curvilinear shape, for example circular or elliptical.
In accordance with the embodiment shown in
Said at least one internal floating column 140 is part of a sub-assembly 14 comprising at least one or more semi-arms of internal lower structural connection arms.
Advantageously, the internal floating column 140 can be structurally connected to one or more columns 110, 120, 130 of said annular structure 100 also by means of one or more upper internal structural connection arms 142, 152, 162, which are placed connecting between the columns at a greater height than that of the respective lower internal connection arms 141, 151, 161 above the waterline of the platform itself.
In this case, the sub-assembly 14 with said at least one internal floating column 140 comprises at least one or more semi-arms of internal upper structural connection arms.
Alternatively, as shown in
In this case, the sub-assemblies into which the platform is divided comprise:
Advantageously, the floating columns 110, 120, 130 which are arranged radially about said central column 140 can also be connected thereto by means of upper internal structural arms 142, 152, 162, which are placed connecting between the columns at a greater height than that of the respective lower internal connection arms 141, 151, 161, preferably above the launching waterline LWL of the platform itself. In this case, the central sub-assembly 14 also comprises a plurality of semi-arms of the respective upper connection arms, while each of the peripheral sub-assemblies 11, 12, 13 comprises at least one semi-arm of the respective upper connection arm.
The invention provides several advantages, some of which have already been described.
The method of constructing and launching an offshore semi-submersible platform according to the invention allows to overcome the current operational limits in terms of maximum size of the platform, thus significantly reducing construction times and costs, without however affecting the performance of the platform itself.
By virtue of the fact that the semi-submersible platform is divided into self-floating sub-assemblies, which can be installed separately, the platform can be assembled directly in water. Thereby the final size of the platform is no longer tied to the overall size of the shipyard or to the availability of barges suitably sized for transport, launch and a possible assembly.
The method of constructing and launching an offshore semi-submersible platform according to the invention allows welding to be carried out in a dry environment while operating below the water level, in a manner simple to implement and operatively reliable.
The method according to the invention therefore allows to seize the technical and economic opportunities characterised by:
Therefore, the invention thus devised achieves the pre-set objects.
Obviously, in the practice thereof, it may also take different shapes and configurations from that disclosed above, without departing from the present scope of protection.
Moreover, all details may be replaced by technically equivalent elements, and any size, shape, and material may be used according to needs.
Number | Date | Country | Kind |
---|---|---|---|
102022000024477 | Nov 2022 | IT | national |