METHOD OF CONTINUOUS CASTING OF BEAM BLANK

Information

  • Patent Application
  • 20120073779
  • Publication Number
    20120073779
  • Date Filed
    December 02, 2011
    13 years ago
  • Date Published
    March 29, 2012
    12 years ago
Abstract
A method of continuous casting a beam blank adapted for impact absorption is disclosed. The method includes: introducing molten steel into a continuous casting mold from a tundish through an immersion nozzle to perform non-oxidation casting, wherein the immersion nozzle is disposed at one side of the continuous casting mold forming both side flanges of a beam blank, and the molten steel is introduced into the continuous casting mold through the immersion nozzle. The method is advantageous in that it is possible to produce steel adapted for low-temperature impact absorption, and productivity is improved due to the increase of the number of consecutive heats of continuous casting.
Description
TECHNICAL FIELD

The present disclosure relates to a method of continuous casting of a beam blank.


BACKGROUND ART

Continuous casting is a series of processes for producing cast products, such as billets, blooms, beam blanks and slabs, by continuously introducing molten steel into a mold having a predetermined shape.


In a continuous casting system, about 20% of the liquid molten steel solidifies while passing through a mold, and then 80% of the remaining liquid molten steel completely solidifies while passing through a strand, thus being made into solid cast products.


SUMMARY

An aspect of the present invention is to provide a method of continuous casting a beam blank adapted for impact absorption, in which non-oxidation casting can be conducted when aluminum (Al) is added in order to produce a beam blank adapted for impact absorption.


An aspect of the present invention provides a method of continuous casting a beam blank adapted for impact absorption, the method including: introducing molten steel into a continuous casting mold from a tundish through an immersion nozzle to perform non-oxidation casting, wherein the immersion nozzle is disposed at one side of the continuous casting mold forming both side flanges of a beam blank, and the molten steel is introduced into the continuous casting mold through the immersion nozzle.


The immersion nozzle may be a straight-type immersion nozzle whose molten steel outlet opens downward.


Mold powder, including CaO in an amount of 32.7˜33.7 wt %, SiO2 in an amount of 29.3˜30.3 wt %, Al2O3 in an amount of 8.90˜9.90 wt %, Na2O in an amount of 1.8˜2.8 wt %, F in an amount of 1.10˜2.10 wt % and C in an amount of 15.6˜16.6 wt % as main components, may be supplied to an inner wall of the continuous casting mold. Compound continuous-continuous casting may be conducted without drawing a cast piece after molten steel stays in the continuous casting mold and then the tundish is replaced.


The tundish may be replaced within 5 minutes.


The level of the molten steel staying in the continuous casting mold may be maintained to range 25˜35%.


A connecting rod may be provided in the molten steel at a location opposite to the location where the immersion nozzle is disposed in the continuous casting mold after mold powder is removed.


The introduction rate of the molten steel in the continuous casting mold after replacing the tundish may be maintained at 0.55˜0.7 m/min.


According to embodiments of the present invention, molten steel is introduced into a continuous casting mold from a tundish through an immersion nozzle, and the immersion nozzle is disposed at one side of the continuous casting mold forming both side flanges of a beam blank.


Thus, it is possible to prevent molten steel from reoxidizing and to prevent the immersion nozzle from clogging, so that it is possible to produce steel adapted for low-temperature impact absorption, and the time taken to install a connecting rod in a tundish at the time of replacing the tundish is shortened.


Further, according to embodiments of the present invention, a straight-type immersion nozzle whose molten steel outlet opens downward is employed, and thus the life span of the immersion nozzle is increased, and the reduced number of consecutive heats of continuous casting is compensated as open nozzles are not used.


Further, according to embodiments of the present invention, compound continuous-continuous casting, in which continuous casting is conducted without drawing a cast piece after molten steel stays in a continuous casting mold and then a tundish is replaced, is used.


Therefore, embodiments of the present invention are advantageous in that high-quality steel adapted for low-temperature impact absorption can be produced, and continuous casting time can be shortened, so that the number of consecutive heats of continuous casting increases, thereby improving productivity.





Description of Drawings


FIG. 1 is a sectional side view showing a continuous casting system provided with open nozzles according to Comparative Example of in Table 1.



FIG. 2 is a plan view showing a continuous casting system provided with open nozzles according to the Comparative Example of Table 1.



FIG. 3 is a sectional side view showing a continuous casting system provided with an immersion nozzle according to the Example of Table 1.



FIG. 4 is a sectional side view showing a continuous casting system provided with an immersion nozzle and a connecting rod according to the Example of Table 1.



FIG. 5 is a plan view showing a continuous casting system provided with an immersion nozzle and a connecting rod according to the Example of Table 1.





DESCRIPTION OF ESSENTIAL ELEMENTS IN THE DRAWINGS




  • 1: ladle


  • 3: tundish


  • 5: open nozzle


  • 7: continuous casting mold


  • 9: immersion nozzle


  • 11: connecting rod


  • 13: connection part

  • m, M: molten steel.



Embodiments

Hereinafter, embodiments of the present invention will be described in detail with reference to the accompanying drawings.


In the method of continuous casting a beam blank adapted for impact absorption according to embodiments of the present invention, as shown in FIG. 3, the molten steel having undergone a refining process is introduced into a tundish 3 from a ladle 1, and then the molten steel (m) charged in the tundish 3 is introduced into a continuous casting mold 7 through an immersion nozzle 9.


The immersion nozzle 9 is used in order to produce steel adapted for low-temperature impact absorption.


Since steel adapted for low-temperature impact absorption includes aluminum (Al), as shown in FIG. 1, when molten steel (m) is introduced into a continuous casting mold 7 through open nozzles 5, the molten steel stream is exposed to atmosphere, and thus the molten steel is thoroughly reoxidized.


Due to the reoxidation of molten steel, the open nozzles 5 are clogged, and a large-size product is formed on the surface thereof with gaseous defects because its rolling ratio decreases.


Therefore, in order to prevent molten steel from reoxidizing at the time of producing steel adapted for low-temperature impact absorption, as shown in FIG. 3, an immersion nozzle 9 whose end is located in a continuous casting mold 7 is used. The immersion nozzle 9 serves to inhibit the contact between molten steel (m) and atmosphere when the molten steel (m) is introduced into the continuous casting mold 7 from the tundish 3, so that non-oxidizing casting can be performed.


As shown in FIGS. 3 to 5, the immersion nozzle 9 is disposed at one side of the continuous casting mold 7 forming both side flanges of a beam blank, and molten steel (m) is introduced into the continuous casting mold 7 through the immersion nozzle 9. Due to the position of the immersion nozzle 9, at the time of replacing the tundish 3 to perform continuous casting, the time for installing a connecting rod in the continuous casting mold 7 is shortened, and thus the time for continuous casting is reduced. In this case, the uniform solidification of molten steel is not influenced by the position of the immersion nozzle.


In order to improve the life span of the immersion nozzle 9, a straight-type immersion nozzle whose molten steel outlet is opened downward is employed as the immersion nozzle 9. Since the inner diameter of the straight-type immersion nozzle is larger than that of a hole-type immersion nozzle having a molten steel outlet whose lower side is opened, it is not clogged, and its life span is improved. Due to the improvement in the lifespan of the straight-type immersion nozzle, the time it takes to replace the straight-type immersion nozzle is shortened, and thus the number of consecutive heats of continuous casting increases.


In the case of a hole-type immersion nozzle, rapid corrosion occurs around holes formed in the lower portion thereof, so that the life span thereof is decreased, and the number of consecutive heats of continuous casting decreases. Further, due to the decrease in the life span thereof, the frequency of replacing a tundish increases.


Mold powder is supplied to the inner wall of the continuous casting mold 7 into which molten steel (m) is introduced. Mold powder is used to keep molten steel warm, to prevent the reoxidation of molten steel, to separate and float inclusion and to accelerate the lubrication between a solidified shell and a mold.


Mold powder includes CaO, SiO2, Al2O3, Na2O, F, and C.


When a straight-type immersion nozzle is employed, mold powder includes CaO in an amount of 32.7˜33.7 wt %, SiO2 in an amount of 29.3˜30.3 wt %, Al2O3 in an amount of 8.90˜9.90 wt %, Na2O in an amount of 1.8˜2.8 wt %, F in an amount of 1.10˜2.10 wt %, and C in an amount of 15.6˜16.6 wt %, as main components. Mold powder may further include components having melting characteristics, such as fluorite, soda ash and the like, in addition to the main components.


The total amount of mold powder including fluorite, soda ash and the like in addition to the main components is set 100 wt %.


Among the components of mold powder, CaO, SiO2 and Al2O3 participate in the separation and levitation of inclusion and the reoxidation of molten steel, and Na2O and F serve to adjust the viscosity and melting point of mold powder, accelerate the lubricating action and maintain heat transfer uniform. Further, C serves to adjust the melting rate of mold powder and keep molten steel warm.


When mold powder consists of the above components, the quality of a beam blank is improved, and the generation rate of seams is minimized. Seams are cracks generated parallel to the rolling direction.


Meanwhile, in the method of continuous casting a beam blank adapted for impact absorption according to embodiments of the present invention, compound continuous-continuous casting is employed. The compound continuous-continuous casting is a method of conducting continuous casting without drawing a cast piece after molten steel (m) stays in a continuous casting mold 7 and then a tundish 3 is replaced by another tundish.


For the convenience of explanation, terms of a beam blank and cast piece are used together.


In the compound continuous-continuous casting, the time it takes to replace a tundish 3 can be shortened compared to general continuous-continuous casting in which continuous casting is performed after a cast piece is drawn, a dummy bar is mounted, a mold is sealed and then a tundish is replaced. When the time it takes to replace a tundish 3 is shortened, continuous casting time is also shortened.


In compound continuous-continuous casting, the time it takes to replace a tundish 3 is set to less than 5 minutes. The reason for this is that, when the time it takes to replace a tundish 3 is more than 5 minutes, the end of the connection part of cast pieces is lifted up, so that there is the danger of causing an accident in the equipment and the problem of deteriorating the quality of a product.


The introduction rate of molten steel (m) introduced into the continuous casting mold 7 through the immersion nozzle 9 is 0.25˜0.5 m/min for the first continuous casting cycle, and is 0.55˜0.7 m/min for the second continuous casting cycle in which the tundish 3 is replaced to the final continuous casting cycle. In this case, the temperature drop of molten steel attributable to the replacement of the tundish is avoided, thus preventing the end of the connection part of cast pieces from being lifted up.


As shown in FIG. 4, in the compound continuous-continuous casting, the level of molten steel (m) staying in the continuous casting mold 7 is 25˜35%. In this case, the level of molten steel (M) newly introduced into the continuous casting mold 7 after replacing the tundish 3 is maintained to be 65˜75%, thus easily connecting cast pieces.


In the compound continuous-continuous casting, the molten steel (m) staying in the continuous casting mold 7 exists in a state in which its temperature drops to some degree, and the molten steel (M) newly introduced into the continuous casting mold 7 after replacing the tundish 3 in a state in which its temperature is high because its temperature does not drop. Therefore, when the level of molten steel (M) newly introduced into the continuous casting mold 7 after replacing the tundish 3 becomes high, cast pieces are easily connected.


When the level of molten steel (m) staying in the continuous casting mold 7 is less than 25% or more than 35%, cast pieces cannot be easily connected, and thus the end of the connection part of cast pieces can be lifted up.


When the level of the cast piece staying in the continuous casting mold 7 is less than 25%, the cast piece goes out of the continuous casting mold 7 before the outer circumference of a connection part 13 has solidified, and thus the connection between cast pieces becomes poor. Further, when the level thereof is more than 35%, the cast piece is rapidly cooled, and thus the connection between cast pieces becomes poor.


As shown in FIGS. 4 and 5, in order to connect the molten steel (m) staying in the continuous casting mold 7 to the molten steel (M) newly introduced into the continuous casting mold 7 after replacing the tundish 3, a connecting rod 11 is provided therebetween. In embodiments, the connecting rod 11 be provided at both ends thereof with grooves in order to easily connect the molten steel (m) staying in the continuous casting mold 7 with the molten steel (M) newly introduced into the continuous casting mold 7.


The connecting rod 11 is provided in the molten steel (m) at a location opposite to the location where the immersion nozzle 9 is disposed in the continuous casting mold 7 after mold powder is removed. In this case, the connecting rod 11 can be rapidly provided, thus decreasing the time waiting for continuous-continuous casting. The connecting rod 11 is provided, and then the molten steel (M) is introduced into the continuous casting mold 7.


Mold powder is removed in order to easily connect the molten steel (m) staying in the continuous casting mold 7 with the molten steel (M) newly introduced into the continuous casting mold 7.


When the connecting rod 11 is provided without removing the mold powder, the molten steel (m) staying in the continuous casting mold 7 is not easily connected with the molten steel (M) newly introduced into the continuous casting mold 7 because of the lubrication action of the mold powder.


Mold powder may be removed by stripping off it using a tool or by firing it using oxygen.


As such, the molten steel (M) continuously introduced into the continuous casting mold 7 is primarily cooled in the continuous casting mold 7, and is then formed at the outer circumference thereof with a solidification shell, and is simultaneously formed into a cast piece. This cast piece is discharged from the continuous casting mold 7, and is then transferred along a plurality of strands. The cast piece transferred along the plurality of strands is secondarily cooled by spraying cooling water to be completely solidified into a beam blank.


Meanwhile, the secondarily-cooled cast piece is straightened. In this case, in order to prevent the end of the connection part 13 of this cast piece from warping, cooling water is sprayed in a direction opposite to the warpage thereof. Cooling water is sprayed using a small-size spray (mist spray) provided at the lower portion of a simple guide. When done in this way, the phenomenon of the end of the connection part 13 of this cast piece being lifted up is prevented using the properties that metals expand or contract depending on temperature. Here, the simple guide is a pinch roll for guiding the secondarily-cooled cast piece to be straightened.


When a beam blank is formed through the above procedures, the connecting part 13, the quality of which is relatively low, is cut off, and only the remaining part of the beam blank is rolled into a desired product.


For reference, in the drawings, for the convenience of explanation, the size of the continuous casting mold 7 was exaggerated, and the reference numerals of molten steel were classified into “m” and “M”. Here, the reason why the reference numerals of molten steel were classified into “m” and “M” is only that the molten steel (m) staying in the continuous casting mold 7 is distinguished from the molten steel (M) newly introduced into the continuous casting mold 7, not that the components of the molten steel (m) are different from those of the molten steel (M).


The following Table 1 shows the change in the number of consecutive heats of continuous casting depending on the use of an open nozzle or an immersion nozzle.











TABLE 1





Class.
Comparative Example
Example







Kind of nozzle in
Open nozzle (molten steel is
Immersion nozzle (molten


tundish
introduced into continuous
steel is introduced into



casting mold through two open
continuous casting mold



nozzles using a semi-open
through one immersion



nozzle)
nozzle)


Production
Production of steel adapted for
Production of steel adapted



impact absorption is impossible -
for impact absorption is



open nozzle is clogged by the
impossible



reoxidation of molten steel


Number of
Average 50
Average 22


consecutive heats of


continuous casting


Replacing tundish
Replacing compound tundish
Replacing compound




tundish


Quality of final
Gaseous defects (TIP cracks,
Quality of rolled product is


rolled product
seams) occur on the surface of
improved by the prevention



rolled product
of gaseous defects









In Comparative Example, the molten steel having undergone a refining process is introduced into a tundish 3 from a ladle 1, and then the molten steel (m) charged in the tundish 3 is introduced into a continuous casting mold 7 through open nozzles 5 (refer to FIG. 1), and, in Example, the molten steel (m) charged in the tundish 3 is introduced into a continuous casting mold 7 through an immersion nozzle 9 (refer to FIG. 3). Here, the reference numeral “11” designates a position at which a connecting rod is provided in molten steel.


As shown in Table 1, it can be ascertained that, in continuous casting, when the molten steel charged in the tundish is introduced into the continuous casting mold through the immersion nozzle, the number of consecutive heats of continuous casting decreases, but it is possible to reduce nozzle clogging caused by the reoxidation of molten steel, and thus steel adapted for impact absorption can be effectively produced.


The following Table 2 shows the generation rate of seams according to the components of mold powder.


For reference, the mold powder of Comparative Example is mold powder when open nozzles are used, and the mold powder of Example is mold powder when an immersion nozzle is used.












TABLE 2






Comparative




Class.
Example
Example
comparison



















Mold powder
basicity
1.20
1.11




(CaO/SiO2)



CaO (wt %)
34.10
33.20



SiO2 (wt %)
28.36
29.80



Al2O3 (wt %)
11.80
9.40



Na2O (wt %)
0.1
2.3



F (wt %)
1.84
1.60



C (wt %)
15.26
16.1



viscosity
12.9
10.2



(poise,



1300° C.)



melting point
1256
1260



(° C.)


Quality of
seams (%)
6.5
2.8
3.7 percent


final rolled



points


product



reduced









From Table 2, it can be presumed that the generation rate of seams is decreased when the mold powder of the Example was used compared to when the mold powder of the Comparative Example was used.


The following Table 3 shows the change in the number of consecutive heats of continuous casting depending on the type of an immersion nozzle.












TABLE 3






Comparative




Class.
Example
Example
comparison







Type of immersion nozzle
hole type
straight type



Number of consecutive
8
22
14


heats of continuous casting









From Table 3, it can be presumed that, when a straight-type immersion nozzle is used, the life span thereof is increased, and thus the number of consecutive heat of continuous casting increases.


Therefore, it can be ascertained that the problem of decreasing the number of consecutive heats of continuous casting can be avoided as open nozzles are not used and the straight-type immersion nozzle is employed.


The following Table 4 shows the change in the time it takes to replace a tundish depending on the conditions of continuous-continuous casting.












TABLE 4





Class.
Comparative Example
Example
comparison







Continuous
general continuous-
compound continuous-



casting
continuous casting
continuous casting



(tundish is replaced
(tundish is replaced



after cast piece is drawn
without drawing cast



and then dummy bar is
piece after cast piece



mounted)
stays in continuous




casting mold)


Tundish replacing
80
 5
−75


time (min)


Introduction rate
 0.5
30


of molten steel


(m/min)


Level of molten
70


steel in continuous


casting mold (%)


Simple guide

small-size spray is




provided at lower




portion of simple guide


Loss of
 6.5
  2.0


connection part of


cast piece


Lifting up of end
non occurrence
non occurrence


of connection part


of cast piece









From Table 4, it can be presumed that, in the compound continuous-continuous casting, the time it takes to replace a tundish is shortened, and thus the continuous-continuous casting time can be shortened, and that it is possible to prevent the end of the connection part of a cast piece from being lifted up when the introduction rate of molten steel in the continuous casting mold and the level of molten steel in the continuous casting mold are adjusted and a small-size spray is additionally provided at a simple guide to spray cooling water.


Further, it can be presumed that, in compound continuous-continuous casting, there is decreased damage to the connection part (front end and rear end of cast piece) of a cast piece, thus increasing the recovery rate thereof.


As described above, according to embodiments of the present invention, the reoxidation of molten steel is prevented by using an immersion nozzle, the problem of decreasing the number of consecutive heats of continuous casting can be avoided as open nozzles are not used and the straight-type immersion nozzle is employed, and continuous-continuous casting time is shortened by applying compound continuous-continuous casting.


Further, the problem of lifting up the end of connection part of a cast piece, which can occur during compound continuous-continuous casting, is prevented by adjusting the level of molten steel staying in the continuous casting mold and by adjusting the introduction rate of molten steel in the continuous casting mold after replacing a tundish.


Therefore, when the method of continuous casting a beam blank adapted for impact absorption according to embodiments of the present invention is used, it is possible to produce steel adapted for low-temperature impact absorption, the quality of a product is made excellent by preventing the gaseous defects of expandable materials, and productivity is improved due to the increase in the number of consecutive heats of continuous casting.


Although embodiments of the present invention have been disclosed for illustrative purposes, those skilled in the art will appreciate that various modifications, additions and substitutions are possible, without departing from the scope and spirit of the invention as disclosed in the accompanying claims.

Claims
  • 1. A method of continuously casting molten steel into a beam blank, the method comprising: introducing molten steel from a tundish into a mold through a nozzle comprising an outlet which is disposed in the mold; andcooling the molten steel to form a beam blank,wherein the mold comprises two flange forming regions to shape two flanges of the beam blank, wherein the outlet is located in a first one of the two flange forming regions such that the outlet is immersed in the molten steel disposed in the first region.
  • 2. The method of claim 1, wherein the outlet of the nozzle is open downward.
  • 3. The method of claim 1, further comprising, prior to introducing molten steel from a replaced tundish, placing a connecting rod in a second one of the two flange forming regions.
  • 4. The method of claim 3, wherein the connecting rod comprising a portion immersed in the molten steel from the tundish and another portion immersed in the molten steel from the replaced tundish.
  • 5. The method of claim 3, further comprising, prior to placing the connecting rod, removing mold powder.
  • 6. The method of claim 1, wherein casting is performed without drawing a cast piece while the molten steel from the tundish stays in the mold prior to the introduction of the molten steel from the replaced tundish into the mold.
  • 7. The method of claim 6, wherein the rate of introducing the molten steel in the mold from the replaced tundish ranges from 0.55 m/min to 0.7 m/min.
  • 8. The method of claim 1, wherein the level of the molten steel staying in the mold is maintained from 25% to 35% while the molten steel from the tundish stays in the mold prior to the introduction of the molten steel from the replaced tundish into the mold.
  • 9. The method of claim 1, further comprising supplying mold powder to the mold, wherein the mold powder comprises CaO in an amount of 32.7˜33.7 wt %, SiO2 in an amount of 29.3˜30.3 wt %, Al2O3 in an amount of 8.90˜9.90 wt %, Na2O in an amount of 1.8˜2.8 wt %, F in an amount of 1.10˜2.10 wt % and C in an amount of 15.6˜16.6 wt %.
  • 10. The method of claim 1, further comprising, prior to introducing molten steel from a replaced tundish, removing mold powder.
Priority Claims (1)
Number Date Country Kind
10-2009-0130460 Dec 2009 KR national
RELATED APPLICATION

This application is a continuation application under 35 U.S.C. §365(c) of International Application No. PCT/KR2010/004128, filed Jun. 25, 2010 designating the United States. This application further claims the benefit of the earlier filing date under 35 U.S.C. §365(b) of Korean Patent Application No. 10-2009-0130460 filed Dec. 24, 2009. This application incorporates herein by reference the International Application No. PCT/KR2010/004128 and the Korean Patent Application No. 10-2009-0130460 in their entirety.

Continuations (1)
Number Date Country
Parent PCT/KR2010/004128 Jun 2010 US
Child 13310662 US