Claims
- 1. A method of controlling a refrigeration unit during start up of a logic module, the method comprising:
setting an initial high set point for the refrigeration unit prior to running the logic module; waiting for the refrigeration unit to indicate it has achieved the initial high set point; setting a low set point if no errors are present; waiting for the refrigeration unit to indicate that it has achieved the low set point; and signaling higher-level code that logic module is ready for clocks-on.
- 2. The method of claim 1 further comprising setting one of a high and intermediate set point if the logic module fails to start within a selected period of time.
- 3. The method of claim 1 further comprising setting an intermediate set point prior to said setting a low set point, waiting for the refrigeration unit to indicate that it has achieved the intermediate set point, and signaling higher-level code to commence its self test.
CROSS-REFERENCE TO RELATED APPLICATIONS
[0001] This application is a divisional of U.S. patent application Ser. No. 09/896,610 filed Jun. 29, 2001, the contents of which are incorporated by reference herein in their entirety.
Divisions (1)
|
Number |
Date |
Country |
Parent |
09896610 |
Jun 2001 |
US |
Child |
10385259 |
Mar 2003 |
US |