This application claims priority from Canadian Patent Application 2,688,392 filed 9 Dec. 2009 entitled METHOD OF CONTROLLING SOLVENT INJECTION TO AID RECOVERY OF HYDROCARBONS FROM AN UNDERGROUND RESERVOIR, the entirety of which is incorporated by reference herein.
The present invention relates generally to in-situ viscous recovery of hydrocarbons. More particularly, the present invention relates to the use of a cyclic solvent-dominated recovery process (CSDRP) to recover in-situ hydrocarbons including bitumen.
At the present time, solvent-dominated recovery processes (SDRPs) are rarely used to produce highly viscous oil. Highly viscous oils are produced primarily using thermal methods in which heat, typically in the form of steam, is added to the reservoir. Cyclic solvent-dominated recovery processes (CSDRPs) are a subset of SDRPs. A CSDRP is typically, but not necessarily, a non-thermal recovery method that uses a solvent to mobilize viscous oil by cycles of injection and production. Solvent-dominated means that the injectant comprises greater than 50% by mass of solvent or that greater than 50% of the produced oil's viscosity reduction is obtained by chemical solvation rather than by thermal means. One possible laboratory method for roughly comparing the relative contribution of heat and dilution to the viscosity reduction obtained in a proposed oil recovery process is to compare the viscosity obtained by diluting an oil sample with a solvent to the viscosity reduction obtained by heating the sample.
In a CSDRP, a viscosity-reducing solvent is injected through a well into a subterranean viscous-oil reservoir, causing the pressure to increase. Next, the pressure is lowered and reduced-viscosity oil is produced to the surface through the same well through which the solvent was injected. Multiple cycles of injection and production are used. In some instances, a well may not undergo cycles of injection and production, but only cycles of injection or only cycles of production.
CSDRPs may be particularly attractive for thinner or lower-oil-saturation reservoirs. In such reservoirs, thermal methods utilizing heat to reduce viscous oil viscosity may be inefficient due to excessive heat loss to the overburden and/or underburden and/or reservoir with low oil content.
References describing specific CSDRPs include: Canadian Patent No. 2,349,234 (Lim et al.); G. B. Lim et al., “Three-dimensional Scaled Physical Modeling of Solvent Vapour Extraction of Cold Lake Bitumen”, The Journal of Canadian Petroleum Technology, 35(4), pp. 32-40, April 1996; G. B. Lim et al., “Cyclic Stimulation of Cold Lake Oil Sand with Supercritical Ethane”, SPE Paper 30298, 1995; U.S. Pat. No. 3,954,141 (Allen et al.); and M. Feali et al., “Feasibility Study of the Cyclic VAPEX Process for Low Permeable Carbonate Systems”, International Petroleum Technology Conference Paper 12833, 2008.
The family of processes within the Lim et al. references describe embodiments of a particular SDRP that is also a cyclic solvent-dominated recovery process (CSDRP). These processes relate to the recovery of heavy oil and bitumen from subterranean reservoirs using cyclic injection of a solvent in the liquid state which vaporizes upon production. The family of processes within the Lim et al. references may be referred to as CSP™ processes.
With reference to
Generally, embodiments of the instant invention relate to: the particular volume of solvent and non-solvent fluid injected in each cycle, the timing of the switch from production to injection, the injection pressure to be used, the production pressure to be used, and to middle and late life operation, all in a CSDRP.
In a first aspect, the present invention provides a method of controlling a cyclic solvent injection and production process to aid recovery of hydrocarbons from an underground reservoir, the method comprising: (a) injecting a volume of fluid comprising greater than 50 mass % of a viscosity-reducing solvent into an injection well completed in the underground reservoir; (b) halting injection into the injection well and subsequently producing at least a fraction of the solvent and the hydrocarbon from the reservoir through a production well; (c) halting production through the production well; and (d) subsequently repeating the cycle of steps (a) to (c); wherein, in at least one subsequent cycle, the in situ volume of fluid injected in step (a) is equal to a net in situ volume of fluids produced from the production well in an immediately preceding cycle plus an additional in situ volume of fluid.
Other aspects and features of the present invention will become apparent to those ordinarily skilled in the art upon review of the following description of specific embodiments of the invention in conjunction with the accompanying figures.
Embodiments of the present invention will now be described, by way of example only, with reference to the attached Figures, wherein:
a, 3b, and 3c show flow charts depicting sub-schemes of the strategy shown in
The term “viscous oil” as used herein means a hydrocarbon, or mixture of hydrocarbons, that occurs naturally and that has a viscosity of at least 10 cP (centipoise) at initial reservoir conditions. Viscous oil includes oils generally defined as “heavy oil” or “bitumen”. Bitumen is classified as an extra heavy oil, with an API gravity of about 10° or less, referring to its gravity as measured in degrees on the American Petroleum Institute (API) Scale. Heavy oil has an API gravity in the range of about 22.3° to about 10°. The terms viscous oil, heavy oil, and bitumen are used interchangeably herein since they may be extracted using similar processes.
In situ is a Latin phrase for “in the place” and, in the context of hydrocarbon recovery, refers generally to a subsurface hydrocarbon-bearing reservoir. For example, in situ temperature means the temperature within the reservoir. In another usage, an in situ oil recovery technique is one that recovers oil from a reservoir within the earth.
The term “formation” as used herein refers to a subterranean body of rock that is distinct and continuous. The terms “reservoir” and “formation” may be used interchangeably.
During a CSDRP, a reservoir accommodates the injected solvent and non-solvent fluid by compressing the pore fluids and, more importantly in some embodiments, by dilating the reservoir pore space when sufficient injection pressure is applied. Pore dilation is a particularly effective mechanism for permitting solvent to enter into reservoirs filled with viscous oils when the reservoir comprises largely unconsolidated sand grains. Injected solvent fingers into the oil sands and mixes with the viscous oil to yield a reduced viscosity mixture with significantly higher mobility than the native viscous oil. Without intending to be bound by theory, the primary mixing mechanism is thought to be dispersive mixing, not diffusion. Preferably, injected fluid in each cycle replaces the volume of previously recovered fluid and then adds sufficient additional fluid to contact previously uncontacted viscous oil. Preferably, the injected fluid comprises greater than 50% by mass of solvent.
On production, the pressure is reduced and the solvent(s), non-solvent injectant, and viscous oil flow back to the same well and are produced to the surface. As the pressure in the reservoir falls, the produced fluid rate declines with time. Production of the solvent/viscous oil mixture and other injectants may be governed by any of the following mechanisms: gas drive via solvent vaporization and native gas exsolution, compaction drive as the reservoir dilation relaxes, fluid expansion, and gravity-driven flow. The relative importance of the mechanisms depends on static properties such as solvent properties, native GOR (Gas to Oil Ratio), fluid and rock compressibility characteristics, and reservoir depth, but also depends on operational practices such as solvent injection volume, producing pressure, and viscous oil recovery to-date, among other factors.
During an injection/production cycle, the volume of produced oil should be above a minimum threshold to economically justify continuing operations. In addition to an acceptably high production rate, the oil should also be recovered in an efficient manner. One measure of the efficiency of a CSDRP is the ratio of produced oil volume to injected solvent volume over a time interval, called the OISR (produced Oil to Injected Solvent Ratio). Typically, the time interval is one complete injection/production cycle. Alternatively, the time interval may be from the beginning of first injection to the present or some other time interval. When the ratio falls below a certain threshold, further solvent injection may become uneconomic, indicating the solvent should be injected into a different well operating at a higher OISR. The exact OISR threshold depends on the relative price of viscous oil and solvent, among other factors. If either the oil production rate or the OISR becomes too low, the CSDRP may be discontinued. Even if oil rates are high and the solvent use is efficient, it is also important to recover as much of the injected solvent as possible if it has economic value. The remaining solvent may be recovered by producing to a low pressure to vaporize the solvent in the reservoir to aid its recovery. One measure of solvent recovery is the percentage of solvent recovered divided by the total injected. In addition, rather than abandoning the well, another recovery process may be initiated. To maximize the economic return of a producing oil well, it is desirable to maintain an economic oil production rate and OISR as long as possible and then recover as much of the solvent as possible.
The OISR is one measure of solvent efficiency. Those skilled in the art will recognize that there are a multitude of other measures of solvent efficiency, such as the inverse of the OISR, or measures of solvent efficiency on a temporal basis that is different from the temporal basis discussed in this disclosure. Solvent recovery percentage is just one measure of solvent recovery. Those skilled in the art will recognize that there are many other measures of solvent recovery, such as the percentage loss, volume of unrecovered solvent per volume of recovered oil, or its inverse, the volume of produced oil to volume of lost solvent ratio (OLSR).
The solvent may be a light, but condensable, hydrocarbon or mixture of hydrocarbons comprising ethane, propane, or butane. Additional injectants may include CO2, natural gas, C3+ hydrocarbons, ketones, and alcohols. Non-solvent co-injectants may include steam, hot water, or hydrate inhibitors. Viscosifiers may be useful in adjusting solvent viscosity to reach desired injection pressures at available pump rates and may include diesel, viscous oil, bitumen, or diluent. Viscosifiers may also act as solvents and therefore may provide flow assurance near the wellbore and in the surface facilities in the event of asphaltene precipitation or solvent vaporization during shut-in periods. Carbon dioxide or hydrocarbon mixtures comprising carbon dioxide may also be desirable to use as a solvent.
In one embodiment, the solvent comprises greater than 50% C2-C5 hydrocarbons on a mass basis. In one embodiment, the solvent is primarily propane, optionally with diluent when it is desirable to adjust the properties of the injectant to improve performance. Alternatively, wells may be subjected to compositions other than these main solvents to improve well pattern performance, for example CO2 flooding of a mature operation.
In one embodiment, the solvent is injected into the well at a pressure in the underground reservoir above a liquid/vapor phase change pressure such that at least 25 mass % of the solvent enters the reservoir in the liquid phase. Alternatively, at least 50, 70, or even 90 mass % of the solvent may enter the reservoir in the liquid phase. Injection as a liquid may be preferred for achieving high pressures because pore dilation at high pressures is thought to be a particularly effective mechanism for permitting solvent to enter into reservoirs filled with viscous oils when the reservoir comprises largely unconsolidated sand grains. Injection as a liquid also may allow higher overall injection rates than injection as a gas.
In an alternative embodiment, the solvent volume is injected into the well at rates and pressures such that immediately after halting injection into the injection well at least 25 mass % of the injected solvent is in a liquid state in the underground reservoir. Injection as a vapor may be preferred in order to enable more uniform solvent distribution along a horizontal well. Depending on the pressure of the reservoir, it may be desirable to significantly heat the solvent in order to inject it as a vapor. Heating of injected vapor or liquid solvent may enhance production through mechanisms described by “Boberg, T. C. and Lantz, R. B., “Calculation of the production of a thermally stimulated well”, JPT, 1613-1623, December 1966. Towards the end of the injection cycle, a portion of the injected solvent, perhaps 25% or more, may become a liquid as pressure rises. Because no special effort is made to maintain the injection pressure at the saturation conditions of the solvent, liquefaction would occur through pressurization, not condensation. Downhole pressure gauges and/or reservoir simulation may be used to estimate the phase of the solvent and other co-injectants at downhole conditions and in the reservoir. A reservoir simulation is carried out using a reservoir simulator, a software program for mathematically modeling the phase and flow behavior of fluids in an underground reservoir. Those skilled in the art understand how to use a reservoir simulator to determine if 25% of the injectant would be in the liquid phase immediately after halting injection. Those skilled in the art may rely on measurements recorded using a downhole pressure gauge in order to increase the accuracy of a reservoir simulator. Alternatively, the downhole pressure gauge measurements may be used to directly make the determination without the use of reservoir simulation.
Although preferably a CSDRP is predominantly a non-thermal process in that heat is not used principally to reduce the viscosity of the viscous oil, the use of heat is not excluded. Heating may be beneficial to improve performance, improve process start-up or provide flow assurance during production. For start-up, low-level heating (for example, less than 100° C.) may be appropriate. Low-level heating of the solvent prior to injection may also be performed to prevent hydrate formation in tubulars and in the reservoir. Heating to higher temperatures may benefit recovery.
Prior descriptions of CSDRP embodiments have not specified criteria such as the volume of solvent to inject per cycle and the point at which injection should be converted to production and vice versa. These aspects of the cyclic process are considerations for improving oil recovery while achieving efficient use of solvent. To obtain a high OISR during a cycle, a significant portion of the solvent must contact viscous oil which has not been exposed to solvent in previous cycles and the mobilized mixture of solvent and oil must flow back to the well. The spatial distribution of the injected solvent may be difficult to ascertain without the use of expensive surveillance techniques such as seismic surveys, real time passive seismic monitoring and/or subsurface electrical resistivity imaging; and therefore methods for judging when solvent has mixed with viscous oil sufficiently to obtain an economic OISR and oil production rate are not readily available. Disclosed below are methods for estimating the optimal solvent injection volume and methods for estimating when to switch to production.
Theoretically, from an overall production rate optimization perspective, production should cease (and injection be restarted) shortly after the current oil production rate falls below the average oil production rate expected over the next injection and production cycle. Of course, the average production rate of the next cycle is not known and is dependant on previous production history and therefore must be directly or indirectly estimated. In most cases, it is acceptable to use the average oil rate from the current cycle as a first order estimate of the average oil rate for the next cycle. Disclosed below are methods for estimating when to switch from production to injection such that the performance (e.g. solvent efficiency, oil production) is enhanced to achieve economic benefit. In a commercial operation, it may not be possible to optimize each cycle for each well due to field constraints; as such, CSDRP cycle strategies may be flexible at the discretion of the operator to optimize overall field performance.
Injection of a solvent-containing fluid into a well is the first step of a CSDRP and the rates and volumes of injected fluid are an integral part of any CSDRP. Note that, unlike thermal recovery methods where minimum injection rates are often specified to minimize wellbore heat loss, CSDRP injection rates may have considerable flexibility to either reduce and/or increase injection rate depending on specific reservoir conditions, in particular the level of reservoir depletion. Rate flexibility allows the operator to optimize the distribution of solvent among wells in order to balance field injection/production volumes and surface gathering system constraints. Three non-limiting options for determining the volume of solvent-containing injectant to inject are: a purely volume-based approach, a hybrid volume and pressure approach, and a purely pressure-based approach. Each of these three approaches are described below and referred to as A1, A2, and A3.
One method of managing fluid injection in a CSDRP is for the volume injected during a cycle to equal the net reservoir voidage resulting from previous injection and production cycles plus an additional volume, for example approximately 2-15%, or approximately 3-8% of the pore volume (PV) of the reservoir volume associated with the well pattern. In mathematical terms, the volume may be represented by:
V
INJECTANT
=V
VOIDAGE
+V
ADDITIONAL.
One way to approximate the net in situ volume of fluids produced is to determine the total volume of non-solvent liquid hydrocarbon fractions and aqueous fractions produced minus the net injectant fractions produced. For example, in the case where 100% of the injectant is solvent and the reservoir contains only oil and water, an equation that represents the net in situ volume of fluids produced is,
V
VOIDAGE
=V
OIL
PRODUCED
+V
WATER
PRODUCED−(VSOLVENTINJECTED−VSOLVENTPRODUCED).
Estimates of the PV are the reservoir volume inside a unit cell of a repeating well pattern or the reservoir volume inside a minimum convex perimeter defined around a set of wells. Fluid volume may be calculated at in situ conditions, which take into account reservoir temperatures and pressures. If the application is for a single well, the “pore volume of the reservoir” is defined by an inferred drainage radius region around the well which is approximately equal to the distance that solvent fingers are expected to travel during the injection cycle (for example, about 30-200 m). Such a distance may be estimated by reservoir surveillance activities, reservoir simulation or reference to prior field trials. In this approach, the pore volume may be estimated by direct calculation using the estimated distance, and injection ceased when the associated injection volume (2-15% PV) has been reached.
Sometimes, it is challenging to define the “pore volume accessible to the well” because of geological heterogeneity or uncertainties in the distance the solvent fingers are expected to travel. The relative ease of pressure measurement and generally higher accuracy versus volumetric measurement may lead to a preference for pressure or hybrid pressure-volume methods.
Rather than estimating the net reservoir voidage resulting from previous injection and production cycles, it may be more practical to establish a threshold pressure which must be obtained before injecting a predetermined volume, for example also equal to approximately 2-15%, or approximately 3-8%, of the pore volume.
An alternative to a volume-based scheme is one based on pressure measurements. In this approach, the solvent injection continues until an approximately predetermined time after the injection pressure during a cycle first passes from less than to greater than a designated threshold injection pressure. In some cases, it may be desirable to continue injection past the threshold pressure for only a minimal amount of time. In other cases, it may be desirable to stop injection once the threshold pressure is met.
In one embodiment, in both the volume-pressure hybrid and pressure-only approaches, the designated threshold injection pressure is a pressure close to but below fracture pressure, for example above 90% of fracture pressure, or above 80% of fracture pressure, or above 95% of fracture pressure. In one embodiment, the threshold injection pressure is a pressure within 1 MPa of, and below, the fracture pressure. As used herein, “fracture pressure” is the pressure at which injection fluids will cause the formation to fracture.
In unconsolidated formations, it is also desirable that the threshold injection pressure be above the dilation pressure of the formation. As used herein, “dilation pressure” refers to the onset of in-elastic dilation, the yielding of the geo-materials, or the onset of non-linear elastic deformation. As used herein, “geomechanical formation dilation” means the tendency of a geomechanical formation to dilate as the pore pressure is raised towards the formation minimum in-situ stress, typically by injecting a liquid or a gas.
The formation in situ stress can be determined in a well test in which water is injected into the formation at high rates while bottom-hole pressure response is recorded. Alternatively, the stress may be measured during the first cycle injection of solvent. Analysis of the pressure response would reveal the conditions at which formation failure occurs (the pressure at which the in situ stress is exceeded). As used herein, “Pore fluid compression” means compression of a pore fluid by pressure. In the field, the operator can obtain pore fluid compression by multiplying pressure increase by fluid compressibility, which is a fluid property measurable in laboratory tests by procedures well known to those skilled in the art. Pore dilation refers to dilation of pores in rock or soil. However, as shown in
Either a volume of solvent is injected (204) or injection continues until the designated threshold pressure is achieved (206). The fluid volume (204) is the approximate net in situ volume of fluids produced in a previous cycle or cycles. Where the pressure is raised to the designated threshold pressure (206), either an additional volume of solvent is injected (208) (e.g. about 2-15% or about 3-8% of PV as described above) or injection continues for an additional amount of time (210), after which injection is ceased (212). Where the fluid volume (204) is injected, it is preferred that an additional volume of solvent is injected (208), but injection may also continue for an additional amount of time (210), after which injection is ceased (212). Optionally, there is a soak period (214) of a flexible duration depending on overall depletion plan before production (216) begins. If the oil rate is not too low (218) and if the gas rate is not too high (220), production continues. If the oil rate is too low (218) or if the gas rate is too high (220), production is stopped (222) and an assessment is made as to whether the next cycle will be economic (224). If the next cycle will be economic, another cycle begins with fluid injection (202). If the next cycle will not be economic, additional oil may be recovered by other means (226), described below. Alternatively, the well may be produced at the lowest achievable (blowdown) pressure (228), and an assessment is made as to whether continued production will be economic (230). If it will not be economic, the well may be suspended or abandoned (232). If it will be economic, production at blowdown pressure is continued or reused as per the specific depletion plan (i.e. recompleted to different hydrocarbon interval or converted to an alternative service such as dedicated injection or disposal). Production at blowdown pressure is continued if deemed to be economic (228).
As discussed above, it may also be desirable in some situations for the threshold pressure to be about equal to the fracture pressure or be below the dilation pressure. According to the process depicted in
Regardless of the particular volume injected, the injection rate need not be constant during the injection of the volume. In certain reservoir conditions affecting the fluid injectivity, tailoring the injection rate throughout the cycle volume may enhance solvent conformance.
In embodiments where the injected fluid is 100% by mass solvent, reservoir simulation suggests high solvent injection rates may favor solvent injection in a relatively thin but areally extensive conformance region whereas low injection rates may promote the formation of a vertical (or thicker) conformance region. Therefore, the solvent injection rate may be tailored to the specific reservoir where a CSDRP is being implemented, depending on reservoir thickness, spacing of wells, geomechanical properties, level of reservoir depletion, etc. In addition, the deliberate oscillation of injection rate above and below some predetermined value may enable some degree of solvent conformance control.
For example, a CSDRP operation with a high solvent injection rate in a thick reservoir may result in poor solvent conformance vertically throughout the pay zone. The injected solvent would be largely confined to a thin, areally extensive conformance region. If so confined, the injected solvent may be under-running a significant amount of the oil column and thereby promoting early well-to-well communication, which is deleterious to production. If a thin conformance layer or well-to-well communication is observed, reducing the solvent injection rate during the current or future injection cycles may promote vertical conformance of injected solvent. The vertical conformance pathways established during low injection periods are subsequently further extended during periods of high injection. Rate control thus provides the practitioner with a means of optimizing oil production by designed solvent conformance for the given target reservoir.
This technique of oscillating injection rate may be particularly beneficial for reservoirs with poor vertical permeability, where the natural tendency for predominantly horizontal conformance may be further exacerbated by aggressive solvent injection. Decreasing the solvent injection rate increases the likelihood of oil confined in low permeability rock to become mobilized by injected solvent. In addition to recovering the oil, this may also increase the overall transmissibility of fluids within the low permeability rock. Conversely, continued aggressive injection may force injected solvent to mobilize oil in predominantly high permeability rock which has already been swept.
Another example of accomplishing conformance control is controlling injection rate in relation to the onset of fracturing. High injection rates after fracturing promote the distribution of solvent in a relatively thin, extensive layer. Lower rates favor a more spherical injection.
Regardless of the producing pressure of a well, if the production phase of a cycle is too short, a disproportionate amount of solvent-rich fluid near the wellbore is produced during the cycle, resulting in a low oil production rate and perhaps an uneconomic process. If the production phase continues for too long, the oil rate declines to a low level resulting in delay of the next cycle of oil production due to delay in the next cycle of solvent injection. Two criteria are used to judge the end of the production phase of a cycle: a low oil rate criterion and a high gas rate criterion. Note that unlike thermal recovery methods where production performance has a time dependency due to cooling, CSDRP performance is expected to be relatively unaffected by short production cycle and/or large delays in solvent injection; this offers the operator significant depletion plan flexibility. For example, CSDRP operation cycle length can be adapted to unusual market conditions such as commodity price fluctuations in order to maximize economic performance.
If a low oil rate criterion is used, production is halted when the oil production rate falls to a specified percentage of the average rate obtained during a cycle, for example a value between 60% and 90%. Such a cutoff generally allows production of the majority of mobilized heavy oil from cyclic solvent injection and halts the production when the rate is about equal to or somewhat below the expected average rate over the next cycle, resulting in minimum oil production deferral. This is shown in scheme 3b of
Alternatively, production may be halted if the current oil rate falls to less than a predetermined percentage (e.g. 30%, or 20 to 40%) of the maximum oil rate for the cycle. Those skilled in the art will recognize that there are many equivalent criteria for stopping oil production. For example, fractions or percentages of the calendar day oil rate (CDOR), or fractions or percentages of a running average. CDOR is the total oil produced during an injection/production cycle divided by the number of days since injection began.
Also, if the oil rate is too low (314) based on the oil measurement (307), production may be stopped. In viscous oil recovery processes, gravity is often a significant mechanism for moving oil towards the well. Processes with significant contribution from gravity are often slow and production for a lengthy period of time at a low rate may be necessary, especially in later cycles. Correspondingly, an absolute rate cutoff (314) could be low, especially in later cycles.
Production at low pressure (i.e. pressure less than the bubble-point of the native fluid or injected fluid) may cause excessive gas-phase production and cause difficulties in artificial lift performance and/or production gathering facilities operation. High gas rates may significantly degrade oil recovery performance and efficient use of injected solvent. To mitigate these effects, in addition to the rate-based production stop criterion discussed above, the production may also be halted due to the produced gas rate or an estimated downhole gas rate exceeding a specified value.
In
After production halts due to at least one criterion being met, a determination is made whether or not another cycle would be economic (224, see
All criteria for ceasing production and switching to injection discussed thus far have applied to all cycles and use data measured in the oilfield. Reservoir surveillance activities and numerical simulation programs provide another tool for developing optimal production rate cutoff criteria on a cycle-by-cycle basis. One method of optimization is to simulate a CSDRP and then choose switch points where the production rate meets the criteria discussed above. This simulation may be updated based on actual field performance data. The anticipated production rate for the next cycle can be estimated using reservoir simulation using the existing production data. Alternatively, collection of historical production data through reservoir surveillance can lead to development of empirical performance curves whereby historical performance of mature wells is used to predict performance of similar wells yet to be drilled and/or in early state of depletion. Reservoir surveillance, numerical simulation studies, and evolving geologic understanding may improve field depletion strategies.
In a CSDRP embodiment (particularly a CSP™ process) as described in Canadian Patent No. 2,349,234 (Lim et al.), a well typically produces at a bottomhole pressure low enough to result in solvent vaporization and the formation of a secondary gas cap. However, such low pressures may not be preferred, especially in early cycles. There are several potential advantages to operating above such low pressures. First, solvent vaporization may necessitate increased facilities costs to handle the produced gas as well as necessitate complex solvent management strategies to efficiently satisfy the highly dynamic solvent requirements. Moreover, some solvent blends may introduce additional facilities and operational complexities due to their tendency to enter the reservoir at low pressures and as a multi-phase fluid. Finally, solvent vaporization may result in hydrate formation in some reservoirs, requiring the injected solvent to be heated prior to injection.
A second aspect of the invention is a method of injecting solvent into an underground reservoir in a liquid state and producing at a bottomhole pressure above the bubble point of the injected solvent. Producing at bottomhole pressures above the bubble point of the solvent results primarily in the production of the viscous oil and the solvent in the liquid phase, potentially eliminating, or reducing, the need for additional costs associated with gas handling facilities. Since operating at production pressures above the solvent bubble point does not create as large of a pressure drop as operating below the bubble point, it is may be preferred to operate at a higher cycle frequency to maintain acceptable recovery rates of the viscous oil. The potential advantage of more rapid cycling is that most portions of the reservoir in which the in situ fluids have been displaced remain filled with liquid solvent, reducing the volume of solvent injected during a cycle compared to previous CSDRP strategies at a given volume of viscous oil produced. This technique potentially reduces the complexities of solvent management as well as storage and facilities costs. In addition, operation above the bubble point pressure of the solvent eliminates, or reduces, the challenges associated with multi-phase injection. One challenge for multiphase injection is that it may require more complex or costly pumping equipment than single-phase injection.
A well's production rate may be constrained by facility design and artificial lift capacity. If the well is producing at lower than its maximum production rate, the producing pressure may be progressively lowered until it reaches some minimum threshold pressure or the maximum design production capacity is achieved. The bottomhole pressure of the well may be controlled by means of choking flow to keep the bottomhole pressure above a specified producing pressure, for example, 300-1000 kPa. The minimum producing pressure controls whether or not the produced fluid is produced primarily as a liquid or primarily as a gas. In one embodiment, the minimum pressure is less than the vapor pressure of the produced fluid, causing the production of a principally gaseous fluid. In an alternative embodiment, the minimum pressure is above the vapor pressure of the produced fluid, causing the produced fluid to be produced primarily as a liquid.
The first few cycles of a producing oil well may strongly impact the profitability of a well. Key to good performance during the first few cycles is achieving high injection rates while maintaining good distribution of solvent. One approach to increasing injectivity is to inject solvent at extremely high pressure, even close to or at fracture pressure, in order to achieve high rates.
Whereas Canadian Patent No. 2,349,234 to Lim et al. implies that injecting at the fracture pressure may be beneficial in any cycle, it has now been discovered that being close to or at the fracture pressure in early cycles only, especially the first cycle, may be optimal whereas being close to or at fracture pressure in later cycles may be unachievable due to well to well communication and/or may be detrimental to production by causing injected fluids to poorly distribute in the reservoir. Therefore, the range of the total volume injected at less than the minimum in-situ stress pressure can be outside the range of 15-50%; in fact, it may be desirable to inject substantially more than 50% of the fluid at below the minimum in-situ stress or even below the dilation pressure. Reducing the amount of injection after fracture provides operational flexibility which has advantages in terms of solvent supply, storage management, and process robustness. The expression close to or at fracture pressure means between 95 and 100% of fracture pressure.
Fourth Aspect (D): Operation Strategy during Middle and Late Life
Rather than abandoning a CSDRP well once a cyclic strategy becomes uneconomic, continued economic recovery may be possible by utilizing non-cyclic injection strategies or coordinated multiwell strategies. Two situations envisioned where a CSDRP well may be converted to a different production process are: 1) that producing a well using a CSDRP is no longer profitable and 2) even while continued production using a CSDRP is economic, conversion to a new recovery process in the mid or late life of a CSDRP well may recover more oil in the long term. This situation may occur when, for example, adjacent CSDRP wells begin to interact via fluid and/or pressure communication. Depending on the spacing between adjacent CSDRP wells, well performance will eventually be influenced by adjacent well operation. Any multiwell cyclic solvent-dominated process, not only the specific CSDRP embodiments discussed herein, may suffer from well-to-well communication due to increased difficulty in optimizing conformance due to increasing network of interconnected pathways comprised of high mobility fluids at low reservoir pressure. Well-to-well communication can be detected via reservoir surveillance, for example a sudden loss of pressure at an injection well or an unexplained rise in pressure at a producing well or unusual cycle production volumes indicating fluid migration between wells and/or patterns of wells. After detection, one well can be converted to a permanent injection well and the communicating well can be converted to a permanent production well. The solvent is supplied at a near-constant rate and injected at pressures above (liquid) or below the bubble point pressure of the hydrocarbon solvent. Solvent flooding in the liquid phase suffers from higher total solvent cost because of higher total injection rates, but can potentially achieve higher oil production rates as well. However, because the reservoir is already partially depleted from CSDRP it is more preferable that the follow-up solvent flood use vapor-phase injection in order to obtain better solvent efficiency whilst minimizing solvent cost.
In one variant, in order to build pressure above dilation pressure, the solvent flood producer is periodically shut-in (710). In another variant, the role of injector and producer is periodically reversed (708) in order to improve sweep.
Unlike thermal recovery methods where minimum injection rates are often specified to minimize wellbore heat loss, injection rates in a solvent flood are flexible and may either be reduced or increased without much detriment. A low injection rate may improve flood performance of a highly connected well by minimizing solvent breakthrough volumes at adjacent wells. High injection rates may be used to stimulate injectors with poor communication. High injection rates may also be used to overwhelm established communication pathways by rapidly filling the near well drainage region, enabling solvent to contact bypassed oil prior to excessive leak off to adjacent depleted reservoir. Also, a high injection rate could accelerate reservoir pressure build up after solvent injection system downtime.
Even before communication is achieved, it may be more economic to switch to a solvent flood process because of onerous solvent injection requirements. The specific timing of the conversion to solvent flooding may instead be based upon a specific oil-to-solvent ratio (OISR), average oil rate, or oil recovery percentage.
To optimally recover hydrocarbons after fluid communication is achieved, and to make efficient use of a preferably constant solvent supply, conversion of an oilfield being produced using a CSDRP to a solvent flood, SDRP, or other late-life recovery process is proposed. Conversion to a solvent flood allows unswept viscous oil trapped in pockets between wells to be accessed by solvent and thereby produced.
A two-dimensional reservoir simulation model was built with geological and geomechanical properties representative of shallow in-situ bitumen deposits (11° API). The solvent was modeled as propane. A CSDRP was simulated using a model according to the cycle strategy outlined in
A three-dimensional reservoir simulation model was built with similar properties to the 2D model. A CSDRP was simulated using the model according to the cycle strategy outlined in
In addition to a low oil production rate, it may be important to set an absolute minimum to the producing bottomhole pressure, especially if gas production presents operational difficulties. A low pressure may lead to too much gas production and a high pressure may leave behind producible oil. In some embodiments the bottomhole-producing pressure of the well is between 500 and 1500 kPa. These values are specific to a reservoir in Cold Lake, Alberta, and are based on depth, reservoir temperature, and injectant composition. The particular choice of bottomhole pressure is depth, reservoir temperature, and injectant composition dependant.
Table 1 outlines the operating ranges for CSDRPs of some embodiments. The present invention is not intended to be limited by such operating ranges.
In Table 1, embodiments may be formed by combining two or more parameters and, for brevity and clarity, each of these combinations will not be individually listed.
In the context of this specification, diluent means a liquid compound that can be used to dilute the solvent and can be used to manipulate the viscosity of any resulting solvent-bitumen mixture. By such manipulation of the viscosity of the solvent-bitumen (and diluent) mixture, the invasion, mobility, and distribution of solvent in the reservoir can be controlled so as to increase viscous oil production.
The diluent is typically a viscous hydrocarbon liquid, especially a C4 to C20 hydrocarbon, or mixture thereof, is commonly locally produced and is typically used to thin bitumen to pipeline specifications. Pentane, hexane, and heptane are commonly components of such diluents. Bitumen itself can be used to modify the viscosity of the injected fluid, often in conjunction with ethane solvent.
In certain embodiments, the diluent may have an average initial boiling point close to the boiling point of pentane (36° C.) or hexane (69° C.) though the average boiling point (defined further below) may change with reuse as the mix changes (some of the solvent originating among the recovered viscous oil fractions). Preferably, more than 50% by weight of the diluent has an average boiling point lower than the boiling point of decane (174° C.). More preferably, more than 75% by weight, especially more than 80% by weight, and particularly more than 90% by weight of the diluent, has an average boiling point between the boiling point of pentane and the boiling point of decane. In further preferred embodiments, the diluent has an average boiling point close to the boiling point of hexane (69° C.) or heptane (98° C.), or even water (100° C.).
In additional embodiments, more than 50% by weight of the diluent (particularly more than 75% or 80% by weight and especially more than 90% by weight) has a boiling point between the boiling points of pentane and decane. In other embodiments, more than 50% by weight of the diluent has a boiling point between the boiling points of hexane (69° C.) and nonane (151° C.), particularly between the boiling points of heptane (98° C.) and octane (126° C.).
By average boiling point of the diluent, we mean the boiling point of the diluent remaining after half (by weight) of a starting amount of diluent has been boiled off as defined by ASTM D 2887 (1997), for example. The average boiling point can be determined by gas chromatographic methods or more tediously by distillation. Boiling points are defined as the boiling points at atmospheric pressure.
In the preceding description, for purposes of explanation, numerous details are set forth in order to provide a thorough understanding of the embodiments of the invention. However, it will be apparent to one skilled in the art that these specific details are not required in order to practice the invention.
The above-described embodiments of the invention are intended to be examples only. Alterations, modifications and variations can be effected to the particular embodiments by those of skill in the art without departing from the scope of the invention, which is defined solely by the claims appended hereto.
Number | Date | Country | Kind |
---|---|---|---|
2,688,392 | Dec 2009 | CA | national |
Filing Document | Filing Date | Country | Kind | 371c Date |
---|---|---|---|---|
PCT/US10/51644 | 10/6/2010 | WO | 00 | 9/4/2012 |