Information
-
Patent Grant
-
6460325
-
Patent Number
6,460,325
-
Date Filed
Wednesday, December 20, 200024 years ago
-
Date Issued
Tuesday, October 8, 200223 years ago
-
Inventors
-
Original Assignees
-
Examiners
Agents
- Burns, Doane, Swecker & Mathis, L.L.P.
-
CPC
-
US Classifications
Field of Search
US
- 060 39182
- 060 676
- 060 772
- 029 888
- 029 890031
-
International Classifications
-
Abstract
A system (1) generating saturated steam is replaced by at least one gas turbine set (29, 30, 31, 36), at least one waste-heat boiler (32) and at least one back-pressure steam turbine (37). The back-pressure steam turbine (37) is coupled to the gas turbine set (29, 30, 31, 36), which back-pressure steam turbine is supplied by the steam generated in the waste-heat boiler (32). The exhaust steam of the back-pressure steam turbine (37) is supplied to the saturated-steam medium-pressure steam turbine (4).
Description
Method of converting a system generating saturated steam, having at least one steam turbine group, and power station converted in accordance with the method
BACKGROUND OF THE INVENTION
1. Field of the Invention
The present invention relates to a method of converting a system generating saturated steam, having at least one steam turbine group, into a power station designed for elevated live steam parameters. It also relates to a power station converted in accordance with this method.
2. Related Art
Various permits from the authorities, which have to be awarded at time intervals, are necessary for the building, commissioning and operation of a nuclear power station. For a wide variety of reasons, in particular a change to the political situation, it can occur that no operational permit is awarded for a completely finished nuclear power station or that a permit already awarded is withdrawn. It is also known for governments to operate a withdrawal from nuclear power station technology. The result of this can be investment catastrophes involving an intact water/steam circuit, electrical installations, buildings, cooling water installations, etc.
One possibility for the further utilization of the conventional installation constituent consists in converting the nuclear power station into a combined power station.
In the course of such a conversion from systems generating saturated steam, having steam turbine groups, an effort is made to carry out a conversion into a power station with more elevated steam parameters and involving steam turbine groups designed for more elevated steam parameters in order, by this means, to increase the efficiency of the complete power station, which comprises the system generating saturated steam and the steam turbine groups.
SUMMARY OF THE INVENTION
The invention is therefore based on the object of creating a method of converting a system generating saturated steam, having at least one steam turbine group which has a saturated-steam medium-pressure steam turbine, according to which method a maximum possible part of the original installation technology can continue to be used.
This conversion should, advantageously, be associated with an increase in the power but, at the same time, also with an increase in the efficiency of the overall power station.
The invention finds particular application in the conversion of nuclear power stations whose nuclear installation part has to be put out of action and, subsequently, possibly dismantled.
In accordance with the invention, this is achieved in a first embodiment of the method by the system generating saturated steam being replaced by at least one gas turbine set, at least one waste-heat boiler and at least one back-pressure steam turbine, by the exhaust gas of the at least one gas turbine of the at least one gas turbine set being used for generating steam in the at least one waste-heat boiler, by the steam generated in the at least one waste-heat boiler being supplied via a live-steam line to the at least one back-pressure steam turbine and by the exhaust steam of the at least one back-pressure steam turbine being made available for the supply to the at least one steam turbine group, preferably to a saturated-steam medium-pressure steam turbine of the steam turbine group. The exhaust steam conditions of the at least one back-pressure steam turbine correspond essentially, in accordance with a preferred embodiment, to the previous steam parameters at the inlet to the existing steam turbine group. In this first embodiment, the complete steam turbine group is retained in its previous form.
In a second embodiment of the method, the design of the at least one waste-heat boiler and of the at least one back-pressure steam turbine is modified in such a way that the steam parameters between back-pressure steam turbine and saturated-steam medium-pressure steam turbine are displaced to more elevated temperatures and lower pressures within the ranges permissible for the saturated-steam medium-pressure steam turbine and in such a way that the final expansion point at the outlet from the saturated-steam medium-pressure steam turbine is moved to lower steam wetnesses and, if possible, into the superheated range, in such a way as to dispense with the separator and also, if possible, the reheater between saturated-steam medium-pressure and low-pressure steam turbines.
In a third embodiment of the method, the replacement occurs in each case by means of a waste-heat boiler with reheater, the saturated-steam medium-pressure steam turbine of each steam turbine group being replaced by at least one new medium-pressure steam turbine designed for more elevated steam parameters, the exhaust steam from the at least one back-pressure steam turbine being made available for supplying the reheater of the at least one waste-heat boiler, this steam being reheated and the reheated steam being made available for supplying the at least one new medium-pressure steam turbine. The new medium-pressure steam turbine is advantageously designed in such a way that the parameters of its exhaust steam are at least approximately equal to the steam parameters at the inlet to the low-pressure steam turbine of the original steam turbine group, so as to dispense with the separator, and if possible also the reheater between the new medium-pressure steam turbine and the low-pressure steam turbine.
A power station converted according to a first version of an installation for carrying out the method and containing at least one steam turbine group having a saturated-steam medium-pressure steam turbine, a separator, a reheater operating with saturated steam, and a low-pressure steam turbine, is characterized by at least one gas turbine set, at least one waste-heat boiler and at least one back-pressure steam turbine as replacement for the original system generating saturated steam, and by the at least partially retained at least one steam turbine group of the original power station.
According to a second version of the installation for carrying out the method, the at least one waste-heat boiler and the at least one back-pressure steam turbine are designed in such a way that the steam parameters between back-pressure steam turbine and saturated-steam medium-pressure steam turbine are located within the ranges of high temperature and low pressure which are permissible for the saturated-steam medium-pressure steam turbine, and in such a way that the final expansion point at the outlet from the saturated-steam medium-pressure steam turbine is located within the ranges of steam wetness which is lower than that of the original power station. It is then possible to dispense with the separator of the original power station. A further embodiment provides for parameter ranges specified in such a way that the final expansion point at the outlet of the saturated-steam medium-pressure steam turbine is located within a range of superheated steam so that, in addition, it is also possible to dispense with the superheater.
A third configuration of the installation for carrying out the method is characterized by at least one gas turbine set, at least one waste-heat boiler with reheater, at least one back-pressure steam turbine and at least one medium-pressure steam turbine as replacement for the original system generating saturated steam and the saturated-steam medium-pressure steam turbine, the steam parameters at the outlet from the reheater being specified in such a way that, in the converted power station, the at least one steam turbine group is retained with a new medium-pressure steam turbine adapted to the parameters at the outlet from the reheater, and without separator and without reheater.
The advantages of the invention may essentially be seen in the fact that a nuclear power station, in particular, can be converted to a combined power station with minimum investment while continuing to retain, as far as possible, the conventional installation technology, and a power station can be obtained whose power and whose efficiency are higher than those of the original nuclear power station.
BRIEF DESCRIPTION OF THE DRAWING FIGURES
Embodiment examples of the invention are shown in the figures of the drawing. Only the elements essential to the understanding of the invention are shown.
FIG. 1
shows, diagrammatically, the water/steam circuit of a nuclear power station,
FIG. 2
shows, diagrammatically, a first variant of the converted power station, while retaining the steam turbine group with separator and retaining reheat by flowing steam (single-shaft installation),
FIG. 3
shows, diagrammatically, a first variant of the converted power station, while retaining the steam turbine group with separator and retaining reheat by flowing steam (multishaft installation),
FIG. 4
shows, diagrammatically, a second variant of the converted power station, while retaining the steam turbine group, but with adaptation of the parameters and possible omission of the separator,
FIG. 5
shows, diagrammatically, a third variant of the converted power station, with replacement of the saturated-steam medium-pressure steam turbine in order to achieve reheat in the waste-heat boiler with omission of the separator and of the reheater using flowing steam,
FIG. 6
shows an embodiment with three gas turbine sets with the associated waste-heat boilers, with the respective back-pressure steam turbines as single-shaft installation, with the medium-pressure steam main and a steam turbine group,
FIG. 7
shows an embodiment with three gas turbine sets with the associated waste-heat boilers, with the respective back-pressure steam turbines as single-shaft installation, with the medium-pressure steam main and a plurality of steam turbine groups,
FIG. 8
shows an embodiment with multishaft installations including back-pressure steam turbines, a medium-pressure steam main and a steam turbine group,
FIG. 9
shows an embodiment with multishaft installations including back-pressure steam turbines, a medium-pressure steam main and a plurality of steam turbine groups,
FIG. 10
shows an embodiment with three gas turbine sets with waste-heat boilers and a single back-pressure steam turbine, a high-pressure steam main and a steam turbine group,
FIG. 11
shows an embodiment with three gas turbine sets with waste-heat boilers and a single back-pressure steam turbine, a high-pressure steam main and a plurality of steam turbine groups,
FIG. 12
shows an embodiment with three gas turbine sets with waste-heat boilers and two back-pressure steam turbines, a high-pressure steam main, a medium-pressure steam main and a steam turbine group,
FIG. 13
shows an embodiment with three gas turbine sets with waste-heat boilers and two back-pressure steam turbines, a high-pressure steam main, a medium-pressure steam main and a plurality of steam turbine groups,
FIG. 14
shows an embodiment with three gas turbine sets with the associated waste-heat boilers with reheat, the respective back-pressure steam turbines as single-shaft installation, a hot reheater steam main and a steam turbine group with a new medium-pressure steam turbine,
FIG. 15
shows an embodiment with three gas turbine sets with the associated waste-heat boilers with reheat, the respective back-pressure steam turbines as single-shaft installation, a hot reheater steam main and a plurality of steam turbine groups with new medium-pressure steam turbines,
FIG. 16
shows an embodiment with multishaft installations including back-pressure steam turbines, a hot reheater steam main and a steam turbine group with a new medium-pressure steam turbine,
FIG. 17
shows an embodiment with multishaft installations including back-pressure steam turbines, a hot reheater steam main and a plurality of steam turbine groups with new medium-pressure steam turbines,
FIG. 18
shows an embodiment with three gas turbine sets with waste-heat boilers, a high-pressure steam main, a single back-pressure steam turbine, a medium-pressure steam main, a hot reheater steam main and a steam turbine group with a new medium-pressure steam turbine,
FIG. 19
shows an embodiment with three gas turbine sets with waste-heat boilers, a high-pressure steam main, a single back-pressure steam turbine, a medium-pressure steam main, a hot reheater steam main and a plurality of steam turbine groups with new medium-pressure steam turbines,
FIG. 20
shows an embodiment with three gas turbine sets with waste-heat boilers, a high-pressure steam main, two back-pressure steam turbines, a medium-pressure steam main, a hot reheater steam main and a steam turbine group with a new medium-pressure steam turbine and
FIG. 21
shows an embodiment with three gas turbine sets with waste-heat boilers, a high-pressure steam main, two back-pressure steam turbines, a medium-pressure steam main, a hot reheater steam main and a plurality of steam turbine groups with new medium-pressure steam turbines.
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
FIG. 1
shows, diagrammatically, the water/steam circuit of a nuclear power station as an example of a system generating saturated steam, having at least one steam turbine group.
Saturated steam, which is supplied through the steam line
3
to the saturated-steam medium-pressure steam turbine
4
of the steam turbine group
2
, is generated in a nuclear steam generation system
1
. The further part of the saturated steam generated is supplied to the reheater
7
. In the embodiment shown, the steam turbine group
2
has one saturated-steam medium-pressure steam turbine
4
. The exhaust steam from this saturated-steam medium-pressure steam turbine
4
flows via a transfer line
5
, a separator (moisture precipitator)
6
and a reheater
7
to the low-pressure steam turbine
8
. Steam from the nuclear steam generation system
1
is supplied via the branch steam line
9
to the reheater
7
. In contrast to reheat in a boiler, reference is here made to reheat with flowing steam. The saturated-steam medium-pressure steam turbine
4
and the low-pressure steam turbine
8
drive the generator
10
via a shaft.
For energy reasons, the condensate from the separator
6
and the reheater
7
is fed to the preheater associated with the corresponding steam pressure or to the next lower pressure stage. In the present case, this means that the steam condensate appearing in the reheater
7
is supplied via the condensate line
51
to the last high-pressure preheater
25
(HP preheater) located before the nuclear steam generation system
1
and the condensate from the separator
6
is supplied via the condensate line
50
to the low-pressure preheater
17
(LP preheater) located before the feed-water tank degasser
21
.
The exhaust steam from the low-pressure steam turbine
8
flows via the exhaust steam line
38
to the condenser
11
with the hotwell
12
.
From the hotwell
12
, the condensate is pumped by means of the condensate pump
13
through the condensate line
14
to the low-pressure preheaters
15
,
16
,
17
. The low-pressure preheaters
15
,
16
,
17
are supplied, by means of the bleed steam lines
18
,
19
,
20
, with steam from the low-pressure steam turbine
8
.
The number and arrangement of the low-pressure preheaters may be considered as an example to explain the installation. As is known, the preheating in a steam power station can be carried out in many different variants.
The low-pressure preheater
17
is followed, in the direction of the feed water, by the feed-water tank/degasser
21
. From the latter, the feed water is pumped by the high-pressure feed-water pump
22
to the high-pressure preheaters
23
,
24
,
25
. The corresponding bleed steam lines extending from the saturated-steam medium-pressure steam turbine
4
to the feed-water tank/degasser
21
and to the high-pressure preheaters
23
,
24
,
25
are designated by the designations
26
,
27
,
28
,
44
.
The high-pressure preheaters can also be configured in many different variants with respect to number and arrangement.
From the last high-pressure preheater
25
, the feed water finally flows via the feed-water line
55
to the nuclear steam generation system
1
.
In
FIG. 1
, the bleed steam condensate from the preheaters is drained in cascade into the feed-water tank/degasser
21
or into the hotwell
12
. Many different circuit variants are, of course, possible in this region.
Whereas the condensate from the high-pressure preheaters is, as is shown, generally drained in cascade into the feed-water tank/degasser
21
, various combinations of cascade connections and feed pump connections are possible within low-pressure preheating columns.
The arrangement of the preheating column, i.e. the type of condensate drain and the presence of heat removal systems and aftercoolers, is irrelevant with respect to the present invention.
Particularly in the case of the steam temperatures which can be realized with light-water reactors, in the range from 260 to 315° C., the optimum steam power process demands saturated steam conditions at the steam turbine inlet, or only slight steam superheat up to a maximum of 30 K. In consequence, the pressures at the steam turbine inlet are in the range between 45 and 70 bar. For reasons of technical feasibility, but also for economic reasons, reheat by the nuclear system is excluded in most light-water reactor technologies. The only possibility for processing the steam in a low-pressure part is, therefore, steam drying in a separator
6
, followed by reheat
7
using flowing steam.
With respect to parameters at the steam turbine inlet or with respect to the designation of a steam turbine, the concept of saturated steam used below is understood to mean steam conditions at the steam turbine inlet in the range of low wetness of approximately 5 to 8% up to superheating at a maximum of 30 K.
A system
1
generating saturated steam is understood to mean
a saturated-steam boiler or
a nuclear steam generation system.
The functional principle, the structure, the parameters and the like are then of no significance. A nuclear steam generation system can involve a boiling water reactor or even a pressure water reactor with the plurality of primary circuits.
The designation employed below for the steam turbine group
2
also includes, in addition to the existing saturated-steam medium-pressure steam turbine
4
and the new medium-pressure steam turbine
49
, the low-pressure steam turbine
8
together with the separator
6
, the reheater
7
and the connecting lines
3
,
5
,
9
, but it is not absolutely necessary for the separator
6
and the reheater
7
to be present.
If, now, the nuclear steam generation system of the power station has to be put out of action for one of the reasons mentioned at the beginning, this part is replaced, in a first variant, by at least one gas turbine set
29
,
30
,
31
,
36
, at least one waste-heat boiler
32
and at least one back-pressure steam turbine
37
, as is represented in a simplified manner in FIG.
2
.
The gas turbine set
29
,
30
,
31
,
36
includes a compressor
29
, a combustion chamber
30
, a gas turbine
31
and a generator
36
. The exhaust gas from the gas turbine
31
is used in the waste-heat boiler
32
for the purpose of steam generation. The steam coming from the waste-heat boiler
32
is supplied via the live-steam line
43
to the back-pressure steam turbine
37
. The exhaust steam from the back-pressure steam turbine
37
is supplied via the exhaust steam line
39
to the existing steam turbine group
2
with separator
6
and reheater
7
.
The generator
36
of the gas turbine set
29
,
30
,
31
,
36
is connected by a coupling to the back-pressure steam turbine
37
, so that a single-shaft installation
35
is formed.
The steam parameters of the waste-heat boiler
32
and the embodiment of the back-pressure steam turbine
37
are now selected in such a way that the exhaust steam parameters of the back-pressure steam turbine
37
correspond to the conditions of the existing saturated-steam medium-pressure steam turbine
4
and of the reheater
7
.
In this first variant, therefore, the nuclear steam generation system
1
is replaced by at least one gas turbine set
29
,
30
,
31
,
36
, consisting of compressor
29
, combustion chamber
30
, gas turbine
31
and generator
36
, at least one waste-heat boiler
32
and at least one back-pressure steam turbine
37
.
The line
41
designates the interface to the water/steam circuit, to which the various condensate lines and steam lines lead and from which the feed-water line
42
returns to the waste-heat boiler
32
.
In the case of a steam power station, the possibility exists of increasing the efficiency of the steam process by raising the feed-water temperature by regenerative preheating. For this reason, nuclear power stations, such as that shown in
FIG. 1
, have a multi-stage regenerative preheating system available.
In a combined power station, i.e. when utilizing the waste heat of a gas turbine for steam generation in a waste-heat boiler, the efficiency of the overall process is a maximum when the power of the steam turbine is a maximum. This implies the greatest possible cooling of the exhaust gas in the waste-heat boiler, which in turn prevents regenerative preheating. The preheating of the feed-water condensate should, advantageously, take place in the waste-heat boiler.
For reasons associated with avoiding dew-point corrosion at the cold end of the waste-heat boiler, the feed-water temperature should not fall below a minimum as a function, for example, of the sulfur content of the gas turbine fuel. In addition, it can be necessary to degas the feed-water pumped into the waste-heat boilers. Both can involve limited preheating of the feed-water in the lower temperature range. In the specific case, use will initially be made of the condensate from the separator
6
and the reheater
7
and only in a later step will bleed be realized in the lower pressure range.
In all variants for converting the nuclear power station, the live steam parameters are raised due to the upstream connection of a back-pressure steam turbine. In consequence, the high-pressure preheaters, at least, and possibly also the high-pressure feed-water pump can no longer be employed in their present arrangement in the new system. In contrast, the condensate pump
13
, the low-pressure preheaters
15
-
17
and the feed-water tank/degasser
21
may possibly be retained.
The regenerative preheating column described in accordance with
FIG. 1
, consisting of the low-pressure preheaters
15
,
16
,
17
, the feed-water tank/degasser
21
, the high-pressure feed-water pump
22
and the high-pressure preheaters
23
,
24
,
25
, the bleed steam lines
18
,
19
,
20
,
26
,
27
,
28
,
44
, the condensate drains and the like can therefore be omitted, partially or completely.
Depending on the steam parameters to be achieved, the at least one retrofitted waste-heat boiler
32
could be supplied with feed water by, for example, the existing high-pressure feed-water pump
22
from the feed-water tank/degasser
21
or by a separate feed-water pump from the hotwell
12
of the condenser
11
or from the feed-water tank/degasser
21
.
The extent to which the realization of the preheating of the feed water of the waste-heat boiler in the lower temperature range takes place in the waste-heat boiler or by preheaters heated by bleed steam depends on the specific installations, the condensate temperature, the gas turbine fuel, the overall thermodynamic concept, the chemical process and the like which are employed.
The adaptations in this region of the water/steam circuit necessary due to the conversion of a system generating saturated steam and, having a steam turbine group, are, however, without significance for the invention and will not therefore be considered in the rest of the description.
In FIG.
2
and all the subsequent figures, the feed-water lines
42
extending from the water/steam circuit to the waste-heat boilers
32
are presented first. In addition, the condensate lines
50
,
51
and steam lines
38
,
18
,
19
,
20
,
26
,
27
,
28
,
44
extending from the steam turbine group
2
, possibly to the water/steam circuit, are represented individually but also in combination. As has already been explained, the part of the water/steam circuit not represented is without significance to the invention.
In this first variant, the retrofitted back-pressure steam turbine
37
, together with the gas turbine installation
29
,
30
,
31
and the generator
36
, is arranged on one shaft. This concept is therefore designated as a single-shaft installation
35
. The advantage of this single-shaft installation
35
consists initially in the saving of a separate generator for the back-pressure steam turbine
37
and in the operational advantages of a clear association between gas turbine set
29
,
30
,
31
,
36
, waste-heat boiler
32
and back-pressure steam turbine
37
.
In addition to the possibility described of realizing a single-shaft installation
35
, the at least one back-pressure steam turbine can, of course, also be embodied as a separate steam turbine set with its own generator. This concept is designated as a multishaft installation.
This can, in particular, be advantageous when a large number of gas turbine installations are necessary for converting the nuclear power station. It is then possible to combine the individual back-pressure steam turbine sets to form one back-pressure steam turbine set.
While a gas turbine installation is understood to mean an installation consisting of compressor, combustion chamber and gas turbine, the gas turbine set designation also includes the generator. The same definition applies to the steam turbine set, which comprises a possible plurality of steam turbine constituents and the associated generator.
In
FIG. 3
, the nuclear steam generation system
1
corresponding to the first variant in accordance with
FIG. 2
is in turn replaced by at least one gas turbine set
29
,
30
,
31
,
36
, consisting of compressor
29
, combustion chamber
30
, gas turbine
31
and generator
36
, at least one waste-heat boiler
32
and at least one back-pressure steam turbine set
37
,
48
. In this embodiment, however, the gas turbine set
29
,
30
,
31
,
36
and back-pressure steam turbine set
37
,
48
form a multishaft installation.
This multishaft installation embodiment also applies to the further subsequent variants. In this case, the number of gas turbine sets present is independent of the number of back-pressure steam turbine sets present.
In a manner analogous to
FIG. 2
, the interface to the water/steam circuit is designated by the line
41
.
A further second variant, based on the first variant, for the conversion of a nuclear power station is represented in FIG.
4
.
In this second variant, the arrangement of waste-heat boiler
32
and back-pressure steam turbine
37
is modified in such a way that the steam parameters between back-pressure steam turbine
37
and saturated-steam medium-pressure steam turbine
4
are displaced to more elevated temperatures and lower pressures in the ranges permissible for the saturated-steam medium-pressure steam turbine
4
, in such a way that the final expansion point at the outlet from the saturated-steam medium-pressure steam turbine
4
is changed to lower steam wetnesses, if possible into the superheated range. The separator
6
can then be omitted and the reheater
7
operating with steam between saturated-steam medium-pressure steam turbine
4
and low-pressure steam turbine
8
can possibly have its load reduced or likewise, under favorable conditions, can be omitted.
The interface to the water/steam circuit is designated by the line
41
.
In the third variant, shown in
FIG. 5
, the reheating system
7
with flowing steam is now also replaced for the relatively low steam parameters, in a further step, by a reheating system
33
in the waste-heat boiler
32
. The result of this, however, is that the existing saturated-steam medium-pressure steam turbine
4
designed for saturated-steam conditions is replaced by a new medium-pressure steam turbine
49
.
In this third variant, the waste-heat boiler
32
has an additional reheater
33
available in addition to the existing steam generation system for the provision of steam.
The exhaust steam from the back-pressure steam turbine
37
is supplied, via the exhaust-steam line
39
, to the reheater
33
of the waste-heat boiler
32
.
The steam for the (new) medium-pressure steam turbine
49
is exhaust steam, reheated in the waste-heat boiler
32
, from the back-pressure steam turbine
37
, which exhaust steam is supplied through the hot reheater steam line
40
of the (new) medium-pressure steam turbine
49
. The (new) medium-pressure steam turbine
49
is designed in such a way that the parameters of its exhaust steam correspond to the parameters at the inlet to the low-pressure steam turbine
8
.
The line
41
designates the interface to the water/steam circuit.
It was stated at the beginning that the nuclear steam generation system is replaced by at least one gas turbine set with waste-heat boiler and at least one back-pressure steam turbine.
FIGS. 2-5
only show one gas turbine set, one waste-heat boiler and one back-pressure steam turbine in each case. The possibility that a plurality of units may be present is indicated by the framing of gas turbine set, waste-heat boiler and back-pressure steam turbine.
FIGS. 6-21
show various technical circuit possibilities (embodiments) of a converted power station which contains a plurality of gas turbine sets. Three gas turbine sets are shown as an example in each case.
FIG. 6
shows an embodiment of the variant in accordance with
FIGS. 2 and 4
. The three, for example, gas turbine sets
29
,
30
,
31
,
36
;
29
′,
30
′,
31
′,
36
′;
29
″,
30
″,
31
″,
36
″ with their associated waste-heat boilers
32
,
32
′,
32
″ are present. The gas turbine sets
29
,
30
,
31
,
36
;
29
′,
30
′,
31
′,
36
′;
29
″,
30
″,
31
″,
36
″, together with the back-pressure steam turbines
37
,
37
′,
37
″, are embodied as single-shaft installations
35
,
35
′,
35
″. The steam generated in the waste-heat boilers
32
,
32
′,
32
″ is supplied via the live-steam lines
43
,
43
′,
43
″ to three back-pressure steam turbines
37
,
37
′,
37
″. At their exhaust steam end, the back-pressure steam turbines
37
,
37
′,
37
″ are in connection via the exhaust steam lines
39
,
39
′,
39
″ with a medium-pressure steam main
45
. This medium-pressure steam main
45
extends to the steam turbine group
2
.
FIG. 7
shows an embodiment in accordance with FIG.
6
. The three, for example, gas turbine sets
29
,
30
,
31
,
36
;
29
′,
30
′,
31
′,
36
′;
29
″,
30
″,
31
″,
36
″, with their associated waste-heat boilers
32
,
32
′,
32
″, are again present. The gas turbine sets
29
,
30
,
31
,
36
;
29
′,
30
′,
31
′,
36
′;
29
″,
30
″,
31
″,
36
″, together with the back-pressure steam turbines
37
,
37
′,
37
″, are embodied as single-shaft installations
35
,
35
′,
35
″. The steam generated in the waste-heat boilers
32
,
32
′,
32
″ is supplied via the live-steam lines
43
,
43
′,
43
″ to three back-pressure steam turbines
37
,
37
′,
37
″. The back-pressure steam turbines
37
,
37
′,
37
″ are in connection, at their exhaust steam end, with a medium-pressure steam main
45
via the exhaust steam lines
39
,
39
′,
39
″. However, this medium-pressure steam main
45
extends to a plurality of steam turbine groups
2
,
2
′, . . .
The specific number of these steam turbine groups
2
,
2
′, . . . depends on the number of steam turbine groups which were present in the original power station. Correspondingly, a medium-pressure steam main
45
extended to still further steam turbine groups is indicated by the arrow
46
.
The embodiment of
FIG. 8
, which is based on the variant of
FIG. 3
, shows multishaft installations. The three, for example, gas turbine sets
29
,
30
,
31
,
36
;
29
′,
30
′,
31
′,
36
′;
29
″,
30
″,
31
″,
36
″ with their associated waste-heat boilers
32
,
32
′,
32
″ are present. The back-pressure steam turbines
37
,
37
′,
37
″ are separated from the gas turbine sets
29
,
30
,
31
,
36
;
29
′,
30
′,
31
′,
36
′;
29
″,
30
″,
31
″,
36
″ and are each coupled to their own generator
48
,
48
′,
48
″. The steam generated in the waste-heat boilers
32
,
32
′,
32
″ is supplied via the live-steam lines
43
,
43
′,
43
″ to three back-pressure steam turbines
37
,
37
′,
37
″. The back-pressure pressure steam turbines
37
,
37
′,
37
″ are in connection, at their exhaust steam end, with a medium-pressure steam main
45
via the exhaust steam lines
39
,
39
′,
39
″. This medium-pressure steam main
45
extends to the steam turbine group
2
.
FIG. 9
shows an embodiment similar to that illustrated in FIG.
8
. The three, for example, gas turbine sets
29
,
30
,
31
,
36
;
29
′,
30
′,
31
′,
36
′;
29
″
30
″,
31
″,
36
″ with their associated waste-heat boilers.
32
,
32
′,
32
″ are again present. The back-pressure steam turbines
37
,
37
′,
37
″ are separated from the gas turbine sets
29
,
30
,
31
,
36
;
29
′,
30
′,
31
′,
36
′;
29
″,
30
″,
31
″,
36
″ and each of them is coupled to its own generator
48
,
48
′,
48
″. The steam generated in the waste-heat boilers
32
,
32
′,
32
″ is supplied via the live-steam lines
43
,
43
′,
43
″ to three back-pressure steam turbines
37
,
37
′
37
″. The back-pressure steam turbines
37
,
37
′,
37
″ are in connection, at their exhaust steam end, with a medium-pressure steam main
45
via the exhaust steam lines
39
,
39
′,
39
″. However, this medium-pressure steam main
45
extends to a plurality of steam turbine groups
2
,
2
′, . . .
An extended medium-pressure steam main
45
and the presence of more than two steam turbine groups is indicated by the arrow
46
.
FIG. 10
again shows an embodiment similar to that illustrated in FIG.
3
. The multishaft installations with the three, for example, gas turbine sets
29
,
30
,
31
,
36
;
29
′,
30
′,
30
′,
36
′;
29
″,
30
″,
31
″,
36
″ and the corresponding waste-heat boilers
32
,
32
′,
32
″ are again present. However, only a single back-pressure steam turbine set
37
,
48
with the back-pressure steam turbine
37
and the generator
48
is present in this embodiment. The steam generated in the waste-heat boilers
32
,
32
′,
32
″ is supplied to a high-pressure steam main
47
via the live-steam lines
43
,
43
′,
43
″. This main extends to the single back-pressure steam turbine
37
. The back-pressure steam turbine
37
is in connection, at its exhaust steam end, with the steam turbine group
2
via the exhaust steam line
39
.
FIG. 11
shows an embodiment in accordance with FIG.
10
. The multishaft installations, with the three, for example, gas turbine sets
29
,
30
,
31
,
36
;
29
′,
30
′,
31
′,
36
′;
29
″,
30
″,
31
″,
36
″ and the corresponding waste-heat boilers
32
,
32
′,
32
″ are again present. In this embodiment, only one single back-pressure steam turbine set
37
,
48
with the back-pressure steam turbine
37
and the generator
48
is again present. The steam generated in the waste-heat boilers
32
,
32
′,
32
″ is supplied via the live-steam lines
43
,
43
′,
43
″ to a high-pressure steam main
47
. This main extends to the single back-pressure steam turbine
37
. The back-pressure steam turbine
37
is in connection, however, at its exhaust steam end, with the plurality of steam turbine groups
2
,
2
′, . . . via the exhaust steam line
39
.
An extended exhaust steam line
39
and the presence of more than two steam turbine groups is indicated by the arrow
60
.
FIG. 12
again shows an embodiment similar to that illustrated in FIG.
3
. The multishaft installations with the three, for example, gas turbine sets
29
,
30
,
31
,
36
;
29
′,
30
′,
31
′,
36
′;
29
″,
30
″,
31
″,
36
″ and the corresponding waste-heat boilers
32
,
32
′,
32
″ are again present. In this embodiment, however, two back-pressure steam turbine sets
37
,
48
;
37
′,
48
′ with the back-pressure steam turbines
37
,
37
′and the generators
48
,
48
′ are present. The steam generated in the waste-heat boilers
32
,
321
,
32
″ is supplied via the livesteam lines
43
,
43
′,
43
″ to a high-pressure steam main
47
. This main extends to the two back-pressure steam turbines
37
,
37
′. The back-pressure steam turbines
37
,
37
′ are in connection, at their exhaust steam end, with the steam turbine group
2
via the exhaust steam lines
39
,
39
′ and the medium-pressure steam main
45
.
FIG. 13
shows an embodiment in accordance with FIG.
12
. The multishaft installations with the three, for example, gas turbine sets
29
,
30
,
31
,
36
;
29
′,
30
′,
31
′,
36
′;
29
″,
30
″,
31
″,
36
″ and the corresponding waste-heat boilers
32
,
32
′,
32
″ are again present. In this embodiment also, two back-pressure steam turbine sets
37
,
48
;
37
′,
48
′ with the back-pressure steam turbines
37
,
37
′ and the generators
48
,
48
′ are present. The steam generated in the waste-heat boilers
32
,
32
′,
32
″ is supplied via the live-steam lines
43
,
43
′,
43
″ to a high-pressure steam main
47
. This main extends to the two back-pressure steam turbines
37
,
37
′. The back-pressure steam turbines
37
,
37
′, however, are in connection at their exhaust steam end with the plurality of steam turbine groups
2
,
2
′, . . . via the exhaust steam lines
39
,
39
′ and the medium-pressure steam main
45
.
An extended medium-pressure steam main
45
and the presence of more than two steam turbine groups is indicated by the arrow
46
.
FIG. 14
shows an embodiment similar to that illustrated in FIG.
5
. The three, for example, gas turbine sets
29
,
30
,
31
,
36
;
29
′,
30
′,
31
′,
36
′;
29
″,
30
″,
31
″,
36
″ with their associated waste-heat boilers
32
,
32
′,
32
″ are present. The waste-heat boilers
32
,
32
′,
32
″ have reheaters
33
,
33
′,
33
″. The gas turbine sets
29
,
30
,
31
,
36
;
29
′,
30
′,
31
′,
36
′;
29
″,
30
″,
31
″,
36
″, together with the back-pressure steam turbines
37
,
37
′,
37
″. are embodied as single-shaft installations
35
,
35
′,
35
″. The steam generated in the waste-heat boilers
32
,
32
′,
32
″ is supplied via the live-steam lines
43
,
43
′,
43
″ to three back-pressure steam turbines
37
,
37
′,
37
″. The back-pressure steam turbines
37
,
37
′,
37
″ are in connection, at their exhaust steam end, with the reheaters
33
,
33
′,
33
″ of the waste-heat boilers
32
,
32
′,
32
″, via the exhaust steam lines
39
,
39
′,
39
″. The reheated steam is supplied by the waste-heat boilers
32
,
32
′,
32
″ to a hot reheater steam main
34
via the hot reheater lines
40
,
40
′,
40
″. This hot reheater steam main
34
extends to the newly installed medium-pressure steam turbine
49
of the steam turbine group
2
.
FIG. 15
shows an embodiment similar to that illustrated in FIG.
14
. The three, for example, gas turbine sets
29
,
30
,
31
,
36
;
29
′,
30
′,
31
′,
36
′;
29
″,
30
″,
31
″,
36
″ with their associated waste-heat boilers
32
,
32
′),
32
″ are again present. The waste-heat boilers
32
,
32
′,
32
″ have reheaters
33
,
33
′,
33
″. The gas turbine sets
29
,
30
,
31
,
36
;
291
,
30
′,
31
′,
36
′;
29
″,
30
″,
31
″,
36
″, together with the back-pressure steam turbines
37
,
37
′,
37
″, are embodied as single-shaft installations
35
,
35
′,
35
″. The steam generated in the waste-heat boilers
32
,
32
′,
32
″ is supplied via the live-steam lines
43
,
43
′,
43
″ to three back-pressure steam turbines
37
,
37
′,
37
″. The back-pressure steam turbines
37
,
37
′,
37
″ are in connection, at their exhaust steam end, with the reheaters
33
,
33
′,
33
″ of the waste-heat boilers
32
,
32
′,
32
″, via the exhaust steam lines
39
,
39
′,
39
″. The reheated steam is supplied by the waste-heat boilers
32
,
32
′,
32
″ via the hot reheater lines
40
,
40
′,
40
″ to a hot reheater steam main
34
. The hot reheater steam main
34
, however, extends to the plurality of new medium-pressure steam turbines
49
,
49
′ of the steam turbine groups
2
,
2
′.
An extended hot reheater steam main
34
and the presence of more than two steam turbine groups are indicated by the arrow
61
.
The embodiment of
FIG. 16
, which is likewise based on the variant in
FIG. 5
, shows multishaft installations. The three, for example, gas turbine sets
29
,
30
,
31
,
36
;
29
′,
30
′,
31
′,
36
′;
29
″,
30
″,
31
″,
36
″ with their associated waste-heat boilers
32
,
32
′,
32
″ are present. The waste-heat boilers
32
,
32
′,
32
″ have reheaters
33
,
33
′,
33
″. The back-pressure steam turbines
37
,
37
′,
37
″ are separated from the gas turbine sets
29
,
30
,
31
,
36
;
29
′,
30
′,
31
′,
36
′;
29
″,
30
″,
31
″,
36
″ and each of them is coupled to its own generator
48
,
48
′,
48
″. In a manner analogous to the embodiment of
FIG. 14
, the steam generated in the waste-heat boilers
32
,
32
′,
32
″ is supplied via the live-steam lines
43
,
43
′,
43
″ to three back-pressure steam turbines
37
,
37
′,
37
″. The back-pressure steam turbines
37
,
37
′,
37
″ are in connection, at their exhaust steam end, with the reheaters
33
,
33
′,
33
″ of the waste-heat boilers
32
,
32
′,
32
″, via the exhaust steam lines
39
,
39
′,
39
″. The reheated steam is supplied by the waste-heat boilers
32
,
32
′,
32
″ via the hot reheater lines
40
,
40
′,
40
″ to a hot reheater steam main
34
. This hot reheater steam main
34
extends to the newly installed medium-pressure steam turbine
49
of the steam turbine group
2
.
FIG. 17
shows an embodiment similar to that illustrated in FIG.
16
. The multishaft installations with the three, for example, gas turbine sets
29
,
30
,
31
,
36
;
29
′,
30
′
31
′,
36
′;
29
″,
30
″,
31
″,
36
″ with their associated waste-heat boilers
32
,
32
′,
32
″ are again present. The waste-heat boilers
32
,
32
′,
32
″ have reheaters
33
,
33
′,
33
″. The back-pressure steam turbines
37
,
37
′,
37
″ are separated from the gas turbine sets
29
,
30
,
31
,
36
;
29
′,
30
′,
31
′,
36
′;
29
″,
30
″,
31
″,
36
″ and each of them is coupled to its own generator
48
,
48
′,
48
″. In a manner analogous to the embodiment of
FIG. 14
, the steam generated in the waste-heat boilers
32
,
32
′,
32
″ is supplied via the live-steam lines
43
,
43
′,
43
″ to three back-pressure steam turbines
37
,
37
′,
37
″. The back-pressure steam turbines
37
,
37
′,
37
″ are in connection, at their exhaust steam end, with the reheaters
33
,
33
′,
33
,″ of the waste-heat boilers
32
,
32
′,
32
″, via the exhaust steam lines
39
,
39
′,
39
″. The, reheated steam is supplied by the waste-heat boilers
32
,
32
′,
32
″ via the hot reheater lines
40
,
40
′,
40
″ to a hot reheater steam main
34
. This hot reheater steam main
34
, however, extends to the plurality of newly installed medium-pressure steam turbines
49
,
49
′ of the steam turbine groups
2
,
2
′.
An extended hot reheater steam main
34
and the presence of more than two steam turbine groups is indicated by the arrow
61
.
FIG. 18
again shows an embodiment of the variant in accordance with FIG.
5
. The multishaft installations with the three, for example, gas turbine sets
29
,
30
,
31
,
36
;
29
′,
30
′,
31
′,
36
′;
29
″,
30
″,
31
″,
36
″ and the corresponding waste-heat boilers
32
,
32
′,
32
″ are again present. The waste-heat boilers
32
,
32
′,
32
″ have reheaters
33
,
331
,
33
″. In this embodiment, however, only one single back-pressure steam turbine set
37
,
48
with the back-pressure steam turbine
37
and the generator
48
is present. The steam generated in the waste-heat boilers
32
,
32
′,
32
″ is supplied via the live-steam lines
43
,
43
′,
43
″ to a high-pressure steam main
47
. This main extends to a single back-pressure steam turbine
37
with generator
48
. At its exhaust steam end, the back-pressure steam turbine
37
is in connection via the medium-pressure steam main
45
and the cold reheater lines
56
,
56
′,
56
″ with the reheaters
33
,
33
′,
33
″ of the waste-heat boilers
32
,
32
′,
32
″. The reheated steam is supplied by the waste-heat boilers
32
,
32
′,
32
″ via the hot reheater lines
40
,
40
′,
40
″ to a hot reheater steam main
34
. This hot reheater steam main
34
extends to the newly installed medium-pressure steam turbine
49
of the steam turbine group
2
.
FIG. 19
shows an embodiment similar to that illustrated in FIG.
18
. The multishaft installations with the three, for example, gas turbine sets
29
,
30
,
31
,
36
;
29
′,
30
′,
31
′
36
′;
29
″,
30
″,
31
″,
36
″ and the corresponding waste-heat boilers
32
,
32
′,
32
″ are again present. The waste-heat boilers
32
,
32
′,
32
″ have reheaters
33
,
33
′,
33
′. In this embodiment, only one single back-pressure steam turbine set
37
,
48
with the back-pressure steam turbine
37
and the generator
48
is again present. The steam generated in the waste-heat boilers
32
,
32
′,
32
″ is supplied via the live-steam lines
43
,
43
′,
43
″ to a high-pressure steam main
47
. This main extends to a single back-pressure steam turbine
37
with generator
48
. At its exhaust steam end, the back-pressure steam turbine
37
is in connection via the medium-pressure steam main
45
and the cold reheater lines
56
,
56
′,
56
″ with the reheaters
33
,
33
′,
33
″ of the waste-heat boilers
32
,
32
′,
32
″. The reheated steam is supplied by the waste-heat boilers
32
,
32
′,
32
″ via the hot reheater lines
40
,
40
′,
40
″ to a hot reheater steam main
34
. This hot reheater steam main
34
extends to the plurality of newly installed medium-pressure steam turbines
49
,
49
′ of the steam turbine groups
2
,
2
′.
An extended hot reheater steam main
34
and the presence of more than two steam turbine groups is indicated by the arrow
61
.
FIG. 20
again shows an embodiment similar to that illustrated in FIG.
5
. The multishaft installations with the three, for example, gas turbine sets
29
,
30
,
31
,
36
;
29
′,
30
′,
31
′,
36
′;
29
″,
30
″,
31
″,
36
″ and the corresponding waste-heat boilers
32
,
32
″ are again present. The waste-heat boilers
32
,
32
′,
32
″ have reheaters
33
,
33
′,
33
″. In this embodiment, however, two back-pressure steam turbine sets
37
,
48
;
37
′,
48
′ with the back-pressure steam turbines
37
,
37
′ and the generators
48
,
48
′ are present. The steam generated in the waste-heat boilers
32
,
32
′,
32
″ is supplied via the live-steam lines
43
,
43
′,
43
″ to a high-pressure steam main
47
. This main extends to the two back-pressure steam turbines
37
,
37
′with the generators
48
,
48
′. At their exhaust steam end, the back-pressure steam turbines
37
,
37
′ are in connection via the exhaust steam lines
39
,
39
′, the medium-pressure steam main
45
and the cold reheater lines
56
,
56
′,
56
″ with the reheaters
33
,
33
′,
33
″ of the waste-heat boilers
32
,
32
′,
32
″. The reheated steam is supplied by the waste-heat boilers
32
,
32
′,
32
″ via the hot reheater lines
40
,
40
′,
40
″ to a hot reheater steam main
34
. This hot reheater steam main
34
extends to the newly installed medium-pressure steam turbine
49
of the steam turbine group
2
.
FIG. 21
shows an embodiment similar to that illustrated in FIG.
20
. The multishaft installations with the three, for example, gas turbine sets
29
,
30
,
31
,
36
;
29
′,
30
′,
31
′,
36
′;
29
″,
30
″,
31
″,
36
″ and the corresponding waste-heat boilers
32
,
32
′,
32
″ are again present. The waste-heat boilers
32
,
32
′,
32
″ have reheaters
33
,
33
′,
33
″. In this embodiment also, the two back-pressure steam- turbine sets
37
,
48
;
37
′,
48
′ with the back-pressure steam turbines
37
,
37
′ and the generators
48
,
48
′ are present. The steam generated in the waste-heat boilers
32
,
32
′,
32
″ is supplied via the live-steam lines
43
,
43
′,
43
″ to a high-pressure steam main
47
. This main extends to the two back-pressure steam turbines
37
,
37
′ with the generators
48
,
48
′. At their exhaust steam end, the back-pressure steam turbines
37
,
37
′ are in connection via the exhaust steam lines
39
,
39
′, the medium-pressure steam main
45
and the cold reheater lines
56
,
56
′,
56
″ with the reheaters
33
,
33
′,
33
″ of the waste-heat boilers
32
,
32
′,
32
″. The reheated steam is supplied by the waste-heat boilers
32
,
32
′,
32
″ via the hot reheater lines
40
,
40
′,
40
″ to a hot reheater steam main
34
. This hot reheater steam main
34
extends to the plurality of newly installed medium-pressure steam turbines
49
,
49
′ of the steam turbine groups
2
,
2
′.
An extended hot reheater steam main
34
and the presence of more than two steam turbine groups is indicated by the arrow
61
.
As an alternative, two or more back-pressure steam turbines with generators can also be present. As an example, one converted power station could have four gas turbine sets with four waste-heat boilers, each two waste-heat boilers being connected, at their exhaust steam end, with one main so that four gas turbine sets are combined with two back-pressure steam turbines with one generator each. This arrangement could, for example, be selected if the converted power station has two steam turbine groups.
Yet more variants are possible. Which variant is selected in the end depends, inter alia, on the steam turbine groups originally present, on economic considerations, and the structure of the existing power station.
The invention is not, of course, limited to the embodiment examples described. For example, individual steam lines can also be provided, between the respective power station components, instead of
the high-pressure steam main
47
,
the medium-pressure steam main
45
or
the hot reheater steam main
34
.
Claims
- 1. A method of converting a system generating saturated steam, the system having at least one steam turbine group which has a saturated-steam medium-pressure steam turbine, the method comprising the steps of:replacing a portion of the system generating saturated steam with at least one gas turbine set, at least one waste-heat boiler, and at least one back-pressure steam turbine; generating steam in the at least one waste-heat boiler using the exhaust gas of at least one gas turbine of the at least one gas turbine set; supplying the steam generated in the at least one waste-heat boiler via a live-steam line to the at least one back-pressure steam turbine; and supplying the exhaust steam of the at least one back-pressure steam turbine to the at least one steam turbine group.
- 2. The method as claimed in claim 1, further comprising:supplying the exhaust steam of the at least one back-pressure steam turbine via an exhaust steam line to the at least one saturated-steam medium-pressure steam turbine.
- 3. The method as claimed in claim 1, wherein the at least one steam turbine group has a separator and a reheater between the saturated-steam medium-pressure steam turbine and a low-pressure steam turbine following an exhaust steam end of the saturated-steam medium-pressure steam turbine, wherein the at least one waste-heat boiler and the at least one back-pressure steam turbine are configured and arranged so that the steam parameters between the back-pressure steam turbine and the saturated-steam medium-pressure steam turbine include elevated temperatures and lower pressures within the ranges permissible for the saturated-steam medium-pressure steam turbine, and so that the final expansion point at the outlet from the saturated-steam medium-pressure steam turbine has lower steam wetnesses, and comprising the step of removing the separator.
- 4. The method according to claim 3, wherein the final expansion point at the outlet from the saturated-steam medium-pressure steam turbine is in a superheated steam range, and comprising the step of removing the reheater.
- 5. A converted power station formed by a method comprising the steps of:providing a system generating saturated steam, the system having at least one steam turbine group which has a saturated-steam medium-pressure steam turbine; replacing a portion of the system generating saturated steam with at least one gas turbine set, at least one waste-heat boiler, and at least one back-pressure steam turbine; generating steam in the at least one waste-heat boiler using the exhaust gas of at least one gas turbine of the at least one gas turbine set; supplying the steam generated in the at least one waste-heat boiler via a live-steam line to the at least one back-pressure steam turbine; and supplying the exhaust steam of the at least one back-pressure steam turbine to the at least one steam turbine group.
- 6. A converted power station in accordance with claim 5, the method further comprising:supplying the exhaust steam of the at least one back-pressure steam turbine via an exhaust steam line to the at least one saturated-steam medium-pressure steam turbine.
- 7. A converted power station in accordance with claim 5, wherein the at least one steam turbine group has a separator and a reheater between the saturated-steam medium-pressure steam turbine and a low-pressure steam turbine following an exhaust steam end of the saturated-steam medium-pressure steam turbine, wherein the at least one waste-heat boiler and the at least one back-pressure steam turbine are configured and arranged so that the steam parameters between the back-pressure steam turbine and the saturated-steam medium-pressure steam turbine include elevated temperatures and lower pressures within the ranges permissible for the saturated-steam medium-pressure steam turbine, and so that the final expansion point at the outlet from the saturated-steam medium-pressure steam turbine has lower steam witnesses, and the method comprising the step of removing the separator.
- 8. A converted power station in accordance with claim 7, wherein the final expansion point at the outlet from the saturated-steam medium-pressure steam turbine has a superheated steam wetness, and the method comprising the step of removing the reheater.
Priority Claims (1)
| Number |
Date |
Country |
Kind |
| 199 62 403 |
Dec 1999 |
DE |
|
US Referenced Citations (4)