1. Field of the Invention
This invention relates to a method of deploying a fixed wireless access communications network such that a specified level of link performance is maintained. The invention also relates to a computer system for implementing the method, a computer program for controlling the computer system and a communications network deployed using the method.
2. Description of the Prior Art
Fixed wireless access communications networks use a fixed antenna at each subscriber premises where the antenna is typically directional. Each subscriber antenna communicates with a base station (to which it is directed, in the case that direct antennas are used). Each base ton is in turn connected to a physical communications network such as a public switched telephone network via a transmission link. A typical base station supports many subscribers, for example 500 to 2000 subscribers in the IONICA (trade mark) system. The resulting fixed wireless access system is capable of delivering a wide range of access services such as POTS (public operator telephone service), ISDN and broadband data.
When a fixed wireless access communications system is initially deployed, a base station of a particular capacity is installed to cover a particular populated area. The capabilities of the base station are designed to be commensurate with the anticipated coverage and capacity requirement. Subscribers' antennas are mounted on a building, for instance, on a chimney, and upon installation are normally directed towards the nearest (or best signal strength) base station or repeater antenna (any future reference to a base station shall be taken to include a repeater).
In order to meet the capacity demand, within an available frequency band allocation, fixed wireless access systems divide a geographic area to be covered into cells. Within each cell is a base station with which the subscribers stations communicate; the distance between the cells refusing the same frequency being determined such that co-channel interference is maintained at a tolerable level. When the antenna on the subscriber premises is installed, an optimal direction for the antenna is identified using monitoring equipment. The antenna is then mounted so that it is positioned towards the optimal direction.
As already mentioned, fixed wireless access systems divide a geographic area to be covered into cells. For initial planning and design purposes these cells may be represented as hexagons, each cell being served by a base station (in the centre of the hexagon) with which a play of subscriber stations within the cell (hexagon) communicate. When detailed cell planning is performed the ideal hexagonal arrangement can start to break down due to site constraints or for radio propagation reasons. The number of subscriber stations which can be supported within each cell is limited by the available number of carrier frequencies and the number of channels per frequency.
Base stations are expensive, and require extensive effort in obtaining planning permission for their erection. In some areas, suitable base station sites may not be available. One problem in fixed wireless access system design is to have as few base stations as possible, whilst supporting as many subscriber stations as possible. This helps to reduce the cost per subscriber in a fixed wireless access system. An on-going problem is to increase the traffic carrying capacity of base stations whilst at the same time keeping interference levels within acceptable bounds. This is referred to as trying to optimise or increase the carrier to interference level ratio. By increasing the traffic capacity the number of lost or blocked calls is reduced and call quality can be improved. (A lost call is a call attempt that falls.)
Cells are typically grouped in clusters as shown in
Known approaches for seeking to increase system capacity include fixed frequency planning (FFP) which involves carefully planning re-use patterns and creating sector designs in order to reduce the likelihood of interference. For example,
As well as this fixed frequency planning is limited in that it is difficult to maximise capacity whilst at the same time maintaining specified link performance levels for all subscribers. Whilst the fixed frequency plan aims to reduce interference, specified link performance levels are not maintained for all individual subscribers. As subscribers are added to the fixed frequency planned network, effects on the link performance provided to other subscribers result. Fixed frequency planned communications networks thus typically give rise to some subscriber locations for which link performances are relatively low compared with other subscriber locations in the same communications network. In order to ensure no problem links in a fixed frequency planning network, then a very large frequency re-use factor would be required. However, this is not practical because the high re-use factor would lead to a low capacity.
Thus it is difficult to provide a method of frequency planning for a fixed wireless access communications system such that specified link performance levels are maintained and capacity is maximised whilst at the same time the problems associated with fixed frequency planning are reduced. The term “fixed frequency plan” is used to refer to a scheme which specifies a regular pattern of base station locations and a pattern of frequency use for communications links between those base stations and subscriber stations. When a communications network is deployed according to a fixed frequency plan, the base station locations and pattern of frequencies used for the communications links needs to adhere to the fixed frequency plan closely, in order for the benefits of the fixed frequency plan to be achieved.
It is accordingly an object of the present invention to provide a method of deploying a fixed wireless access communications network such that a specified level of link performance is maintained which overcomes or at least mitigates one or more of the problems noted above.
Current deployment methods for fixed wireless access communications networks typically give rise to a trade off between link performance and capacity. It is difficult to maintain specified levels of link performance whilst maximising capacity. When a request to change a fixed wireless access network is received, for example, by adding a subscriber, moving a subscriber or adding a sector to a base station, the link performance at each communications link is determined. For example, by measuring the link performance at each link or by predicting or estimating these link performance levels. If the proposed change to the network does not compromise link performance, that is, the predicted or actual link performance levels are greater than a specified level, then the proposed change is effected. Otherwise the new subscriber is placed on hold, pending change to the network such as addition of a new base station or sector. Estimates of the link budgets for each communications link are calculated for “worst case” scenario situations. For example, this may be done using known deployment tools. This method is used in conjunction with fixed frequency planning or without fixed frequency planning. If no fixed frequency plan is deployment of the network is simplified.
According to an aspect of the present invention there is provided a method of deploying a fixed wireless access communications network such that a specified level of link performance is maintained, said network comprising a plurality of base stations end a plurality of subscriber stations, each subscriber station being arranged to communicate with one of the base stations via a communications link, said method comprising the steps of:—
A corresponding computer system is also provided, for deploying a fixed wireless access communications network such that a specified level of link performance is maintained, said network comprising a plurality of base stations and a plurality of subscriber stations, each subscriber station being arranged to communicate with one of the base stations via a communications link, said computer system comprising:—
A corresponding computer program is provided stored on a computer readable medium and arranged to control a computer system such that a fixed wireless access communications network may be deployed whilst a specified level of link performance is maintained, said network comprising a plurality of base stations and a plurality of subscriber stations, each subscriber station being arranged to communicate with one of the base stations via a communications link, said computer program being arranged to control said computer system such that:—
A corresponding fixed wireless access communications network is provided comprising:—
Various advantages are thus achieved. Firstly, link performance levels are maintained. Also, it is not necessary to use complex terrain and building databases in order to calculate estimates of the link performance at each link. Instead a simple model such as a 2-D line of sight model can be used to estimate a “worst case” scenario. By using an accurate terrain database to calculate estimates of the rink performance at each link, the capacity of the network is further increased. However, it is not essential to use such terrain databases.
The method of deploying a fixed wireless access communications network such that a sped level of link performance is achieved may be used either with a fixed frequency plan or without a fixed frequency plan. If no fixed frequency plan is used, further advantages are achieved. The complex task of mapping a frequency plan onto a grid of actual base stations is avoided. Also, base station sites can be optimised for site cost, coverage and subscriber density. As well as this, any working fixed wireless access communications network can be taken and developed by adding new subscribers using the method described above without the need to adhere to a fixed frequency plan. No reorganisation of frequencies in the existing network is required.
Further benefits and advantages of the invention will become apparent from a consideration of the following detailed description given with reference to the accompanying drawing which specify and show premed embodiments of the invention.
a shows uplink channel allocations for a communications network grown using the method of
b shows downlink channel allocations for the communications network of
c is a single channel plot of the communications network of
Embodiments of the present invention are described below by way of example only. These examples represent the best ways of putting the invention into practice that are currently known to the Applicant although they are not the only ways in which this could be achieved.
Considering a fixed wireless access communications network such as that illustrated in
The term “link performance” is used to refer to any measure of the functionality of a communications link. For example, this measure may be provided in terms of a carrier to interference level ratio, the number of errors observed on a link over a specified period of time or any other suitable metric.
A request is made to change the communications network. For example, this may be a request to add a proposed subscriber station to the communications network or to change the location of an existing subscriber station. Other examples of requests for change include addition of a sector to a base station. In the case that a request is made to add a new subscriber, a base station is selected with which the proposed subscriber station is to communicate. This selection may be made on the basis of the information about the location of the proposed subscriber station. For example, the nearest base station with which a clear “line of sight” may be established may be selected. Alternatively, if that nearest base station is full then another suitable base station is selected.
In order to maintain a level of rink performance across the network, the level of link performance at each communications link 54 is determined (box 403 of
In the case that measurements of the rink performance are performed at each link, these measurements are unlikely to represent the worst case situation at that link. For example, during heavy rainfall, link performance may be significantly detrimented especially for applications involving high data transmission rates. Because of this the link performance measurements need to be adjusted to take worst case situations such as heavy rainfall conditions into account. The measurements may be carried out automatically by equipment installed at each subscriber location and the measurement data communicated via the communications network to an operator or management system. The measurement may be carried out effectively continuously to monitor the link performance.
In a preferred embodiment, instead of taking actual measurements of the link performance, estimates of this are calculated by using a deterministic model of the communications network to predict link budgets. Any suitable deployment toot may be used to calculate estimates of the link performances. For example, the EDX Signal Pro (trade mark) and Planet (MSI) (trade mark) deployment tools may be used. An example of a method for predicting or estimating link budgets for each communications link 54 using a model of the communications network is described in more detail in the section headed “calculation of link performance levels”0 below.
As mentioned above, one example of a requested change to the network is a request to add a subscriber station.
A model of the communications network is then used to calculate an estimate of the link performance provided by each communications link 54 in the network. Any suitable indicator of link performance may be estimated. For example, the value C/(I+A+N) is calculated where C indicates the carrier level, I indicates the interference level, A indicates the adjacent channel interference level and N indicates the noise level. More information about calculating this value is described in the section headed “calculation of link performance levels” below.
If all the links 54 have an estimated link performance indicator that is greater than a specified value then the proposed new subscriber is added to the communications network (see boxes 66 and 66 of
Using this method new subscribers are only added to the communications network if they do not compromise the link performance in the communications network. If new subscribers cannot be added for this reason, they are placed on hold pending a change to the communications network such as deployment of a new base station or sector. Similarly, any other requested change is only effected if ft does not compromise link performance.
The method of deploying a fixed wireless communications network described above may be implemented by a computer system. Any suitable type of computer system may be used and this may be integrated into the communications network itself. A graphical user interface may be provided in order that the network operator is able to control the computer system and view results of the system. Preferably the computer system is located at a node in the communications network and is arranged to receive inputs of information about the communications network.
Even when using the method described above link performance can exceptionally be degraded. For example, in the event of equipment problems, multipath interference or small intense rain cells.
A hold ratio may also be calculated as described below, in order to provide a measure of network growth. Each attempt to add a new subscriber is termed a “placement attempt”. The hold ratio (HR) is given by the number of proposed subscribers who are paced on hold divided by the total number of placement attempts. This ratio is then used to indicate when (and where) a network should be improved. For example, by adding new base stations or new sectors. The hold ratio is thus particularly advantageous for use by network planners. It provides a single value indicating network performance which is to interpret and enables potential problem areas to be identified quickly.
A growth profile may be plotted and displayed to an operator via a graphical user interface or other interface means.
The hold ratio can be used to indicate when a network should be improved, as mentioned above. For example, a network operator is able to specify a hold ratio value above which improvements to the network should be considered. The hold ratio also gives an indication of the capacity of the network. In the example given in
Another problem with fixed frequency planning, is that the maximum capacity of the resulting network is limited. Using the hold ratio discussed above it is possible to assess the capacity of a network by calculating Noff. If a 16 base station network with N=4 target reuse and using 64 QAM (QAM stands for quadrature amplitude modulation which is a measure of the amount of information that may be sent over a link in the network) is considered, then the effective reuse factor Noff is 7 which is poor. In one embodiment of the present invention, this problem is addressed by not using a fixed frequency plan whilst still implementing the method described above for ensuring specified link performance levels. If no fixed frequency plan is used without any means of maintaining link performance, then the resulting network could be severely compromised. This is because, subscribers could be added to the network regardless of the effect they would have on the link performance experienced by existing subscribers. In a fixed frequency planned network, the fixed frequency plan itself is designed to take into account the effect of potential subscribers on other subscriber's link performance.
It has unexpectedly been discovered that by not using a fixed frequency plan whilst implementing the method of adding subscribers described above, link performance can be maintained whilst capacity is increased. This is illustrated in
These figures demonstrate that the optimal condition is the unconstrained condition for which the fastest growth of the network and the highest capacity is achieved. By improving base station antenna patterns even greater improvements in capacity and network growth for the unconstrained condition are achieved. For example, by using base station antenna patterns which roll off rapidly and have low side and back lobes an effective reuse factor of less than 2 can be achieved.
By using no fixed frequency plan the disadvantages of fixed frequency planning are avoided. The complex task of mapping a frequency plan onto a base grid is avoided allowing base station locations to be optimised for site cost, coverage and subscriber density.
a and 9b show an example of a fixed wireless access communications network which has been formed according to the method described herein and using no fixed frequency plan. 151 subscriber stations or CPEs are shown and eight different frequency channels are used in the uplink situation and four in the downlink situation.
Calculation of Link Performance Levels
As described above, any suitable deployment tool may be used to calculate link performance levels at each link in the communications network. In one example a deterministic modelling tool (DMT) is used for this task and is able to provide indications of link performances in both wet and dry conditions. The DMT calculates a performance indicator for each link based on an emote of the carrier level, divided by the sum of each of the interference level, the adjacent channel interference level and the noise level. Information about the location of each base station and subscriber station is used together with information about the communication links between each subscriber station and its associated base station. For example, the information about the communications links may comprise information about any fixed frequency plan used. Propagation models such as free space path loss are used in conjunction with models of the effects of rain and rain cells as required. Information about antenna patterns, power control modes and shared downlink carriers is also provided to the DMT if required. Using all the information available to it the DMT is arranged to provide estimates of link performances, where these estimates or predictions are pessimistic. That is the “worst case” scenario is considered. For example, equipment losses, gains and transmit powers are estimated according to a “worst case” scenario. Also, worst case antenna patterns are assumed. By doing this, it is possible to maintain link performance levels.
The DMT may access a clutter database in order to take multipath interference into account. Also, the DMT may take into account polarisation reuse. Neither of these are essential however.
A computer program is also provided that is arranged to control the computer system of
Positions of subscriber stations and base stations may be determined where required using positioning systems such as GPS and or maps as is known in the art.
A range of applications are within the scope of the invention. These include situations in which it is required to deploy a fixed wireless access communications network whilst providing specified levels of link performance. For example where an existing fixed wireless access network is taken over and it is required to increase the capacity of that network or where a new fixed wireless access network is being created.
Number | Name | Date | Kind |
---|---|---|---|
4654867 | Labedz et al. | Mar 1987 | A |
5493679 | Virgil et al. | Feb 1996 | A |
5848358 | Forssen et al. | Dec 1998 | A |
6184829 | Stilp | Feb 2001 | B1 |
6317599 | Rappaport et al. | Nov 2001 | B1 |
6499006 | Rappaport et al. | Dec 2002 | B1 |
6625454 | Rappaport et al. | Sep 2003 | B1 |
6631267 | Clarkson et al. | Oct 2003 | B1 |