Claims
- 1. A method of logging a subsurface formation comprising a plurality of layers each having a horizontal conductivity and a vertical conductivity, the method comprising:
(a) conveying an electromagnetic logging tool into a borehole in the subsurface formation, said logging tool including a plurality of transmitters and a plurality of receivers at least one of said transmitters and at least one of said receivers inclined to an axis of the tool, said borehole having an axis inclined at a nonzero angle to a normal to said layers; (b) using said electromagnetic logging tool for obtaining a plurality of measurements with a plurality of pairs of said transmitters and receivers; (c) using a first subset of said plurality of measurements for determining a horizontal conductivity associated with each of said layers; and (d) using determined horizontal conductivities and a second subset of said plurality of measurements for determining a vertical conductivity associated with each of said layers.
- 2. The method of claim 1 wherein said plurality of transmitters comprise x-, y- and z-transmitters and the plurality of receivers comprise x-, y- and z-receivers.
- 3. The method of claim 1 wherein determining the horizontal conductivity associated with each of said layers further comprises applying frequency focusing to said first subset of measurements and obtaining therefrom a first frequency focused set of measurements.
- 4. The method of claim 2 wherein determining the horizontal conductivity associated with each of said layers further comprises applying frequency focusing to said first subset of measurements and obtaining therefrom a second frequency focused set of measurements.
- 5. The method of claim 3 wherein determining the horizontal conductivity associated with each of said layers further comprises determining a set of weights such that a weighted sum of the first frequency focused set of measurements is substantially independent of the vertical conductivity associated with each of the plurality of layers.
- 6. The method of claim 4 wherein determining the horizontal conductivity associated with each of said layers further comprises determining a set of weights such that a weighted sum of the first frequency focused set of measurements is substantially independent of the vertical conductivity associated with each of the plurality of layers.
- 7. The method of claim 2 wherein said first subset of measurements consist of principal component measurements.
- 8. The method of claim 5 wherein determining the vertical conductivity associated with each of said layers further comprises inverting the second frequency focused set of measurements using a model including said horizontal and the vertical conductivity associated with each of said plurality of layers.
- 9. The method of claim 6 wherein determining the vertical conductivity associated with each of said layers further comprises inverting the second frequency focused set of measurements using a model including said horizontal and vertical conductivity associated with each of said plurality of layers.
- 10. The method of claim 1 wherein determining the horizontal conductivity and the vertical conductivity associated with each of the plurality of layers further comprises obtaining a tool rotation angle, formation azimuth, and an angle of inclination of said borehole to the normal to the plurality of layers.
- 12. The method of claim 2 wherein determining the horizontal conductivity and the vertical conductivity associated with each of the plurality of layers further comprises obtaining a tool rotation angle, formation azimuth, and an angle of inclination of said borehole to the normal to the plurality of layers.
- 13. The method of claim 1 further comprising repeating steps (a)-(d) and iteratively updating an estimate of said non zero angle until a difference between said measurements and a model output obtained using said horizontal and vertical conductivities is less than a predetermined threshold.
- 14. The method of claim 1 wherein determining said horizontal conductivity associated with each of said layers further comprises performing an inversion.
- 15. The method of claim 2 wherein said subsurface formation further comprises a uniform formation, and the plurality of measurements further comprises at least one measurement selected from (i) a hxz measurement, (ii) a hxy measurement, (iii) a hzx measurement, (iv) a hzy measurement, (v) a hyx measurement, and, (vi) a hyz measurement.
CROSS-REFERENCES TO RELATED APPLICATIONS
[0001] This application is a continuation-in-part of U.S. patent application Ser. No. 09/825,104 filed on Apr. 3, 2001. It also claims priority from U.S. Provisional Patent Application Ser. No. 60/312,655 filed on Sep. 4, 2001. The contents of both documents are fully incorporated herein by reference.
Provisional Applications (1)
|
Number |
Date |
Country |
|
60312655 |
Aug 2001 |
US |
Continuation in Parts (1)
|
Number |
Date |
Country |
Parent |
09825104 |
Apr 2001 |
US |
Child |
10072173 |
Feb 2002 |
US |