This invention relates to heavy equipment for surface mining and loading operations such as electric mining, or ‘rope’, shovels, drag lines, and the like, and more particularly to systems and methods for calculating the cumulative effect of digging and unloading operations on the expected life of the components of such equipment.
In large scale surface mining operations, equipment of immense proportions is used to load and transport material. Loading is often performed by electric mining shovels with a dipper bucket. A typical dipper bucket has a rated load capacity of one hundred tons per scoop. Each load of excavated material is typically deposited into a large capacity truck (for example, having a capacity of 360 tons) and transported to a remote processing location.
Overloading the dipper can lead to premature fatigue and failure causing excessive maintenance costs and decreased shovel efficiency. For example, a shovel operator may bury the dipper into the highwall during digging operations, thereby slowing down production, overloading the dipper, and potentially causing overload damage to machine components. It remains a continuing challenge to prevent such incidents from occurring without adversely affecting machine productivity.
Load measurement systems have been developed and are used to calculate and display the net weight of excavated material in the dipper before it is transferred to the truck. These load measurement systems function by first sensing the electrical load of the power shovel drive motors, then computing the motor torque based on that electrical load, and finally computing an estimate of the net weight based on the motor torque, the known power shovel geometry, and the known tare weights.
This provides a reasonable estimation of the weight of each dipper load and provides real time feedback to the operator. However, without a method for tracking and analyzing the effect of cumulative loading operations such as by estimating the useful life of key components of the shovel, the operator can only guess whether his or her utilization of the shovel is close to that estimated by the manufacturer.
Therefore it would be beneficial to provide a methodology that determines and communicates to the shovel operator, and other appropriate personnel, how successful he or she has been, after the fact, in consistently achieving the rated dipper payload with each excavated load without incurring harmful overloads.
One aspect of the present invention provides a method of estimating the operating life of an electric mining shovel by a shovel life score based on the cumulative loading of a dipper. In accordance with the method, each dipper payload weight is determined via an onboard load measurement system. Dipper payloads, both above and below a benchmark value are translated into a relative shovel component life. The magnitude of each dipper load is assessed against the shovel benchmark load rating. A running life score is calculated and indicates the shovel life increase or decrease due to the effect of cumulative dipper loads during operation. This score informs the operator and mine management of their ability to maximize machine capability without incurring damaging overloads. The score may be determined over the course of a single operating shift, a rolling twenty-four hour shift, and the last thirty days.
The foregoing and other objectives and advantages of the invention will appear from the following description. In the description, reference is made to the accompanying drawings which for a part hereof, and in which there is shown by way of illustration a preferred embodiment of the invention. Such embodiment does not necessarily represent the full scope of the invention, however, and reference is made therefore to the claims herein for interpreting the scope of the invention.
Referring to
During normal operation, the dipper 26 is crowded outward into a soil bank, hoisted upward to dig and fill the dipper 26, swung to one side, and emptied into a haul truck. These motions and actions are controlled by an electrical control system that operates the various mining shovel components in response to inputs from the operator as well as from control elements, such as limit switches, pressure switches, sensors, and the like. The operator provides the inputs from within a cab 38 with manually operable devices including a joystick, a lever, foot pedals, rocker switches, a computer keyboard, touch pads, and the like.
The control system monitors dipper 26 payloads through the use of an onboard load weight system. An exemplary load weight system, AccuLoad™, determines the weight of each dipper 26 load before it is dumped into a waiting haul truck. In this system, the electrical load of the shovel hoist motor is sensed while the dipper 26 is held above the truck. A hoist motor torque is computed based on the hoist motor electrical load. The net weight of the dipper 26 load is estimated based on the motor torque, the known mining shovel geometry and the known tare weights with appropriate corrections made. Alternatively, other methods of determining the weight of each dipper load may be employed.
The control system is accessible via a remote monitoring system, such as AccessDirect™. Raw dipper load data is transmitted to the remote monitoring system and logged by a reporting software application, such as MIDAS™. The cumulative dipper payload data is then processed and analyzed in view of histograms of previous actual dipper loads and component breakdown frequencies to estimate the running life score of the electric mining shovel 10. The cumulative weight data may be displayed in a meaningful manner in the form of reports, tabulations, or spreadsheets. AccuLoad, AccessDirect, and MIDAS are trademarks of Bucyrus, Inc.
The running life score informs the operator and mine management of their success in maximizing shovel capability without incurring damaging overloads. For example, a 100% score value indicates that the shovel 10 is being operated in a manner consistent with the rating set by the manufacturer. A score above 100% means that the life of the components (and thus the shovel 10) should be better than the norm. This scores may also mean that the shovel 10 may not be working to its full potential. Productivity maximization may be indicated by scores under 100%, at the sacrifice of lower than desired component life. Digging performance envelope containment on shovels can be set at any level. In one embodiment, an 85% life containment limit in any rolling 30 day period is recommended. The running life score score indicates the average increase or decrease due to cumulative dipper loads amassed during a given time period such as a single operating shift, a twenty-four hour period, and the previous thirty day operating period.
Referring now to
Although not represented in
For example, it may be incorrectly determined that an actual dipper payload of 125 tons, when compared to the benchmark, or rated, payload of one hundred tons, results in a calculated overload factor of:
125/100=1.25
However, in the exemplary mining shovel 10, the dipper 26, padlock 35, and handle end 28 together weigh 112.6 tons. The actual overload factor is therefore:
(112.6+125)/(112.6+100)=1.12
As described above, the magnitude of dipper loading, either above or below a benchmark level, influences component life. From an accumulation of dipper 26 payload weights, a resultant component life score can be mathematically determined.
Other load/life correlations assume that the dipper percent fill plus dead weight is directly proportional to the torque effort required to fill the dipper and that those torque efforts affect all motions and structures equally. However, this is an oversimplification. More probable percent-fill/life correlations suggested are as follows:
Therefore, component loading, compared to the benchmark, reflects relative life as a function of the loading ratio raised to an appropriate exponential power. The exponential powers vary from:
However, the use of this methodology as an effective tool is compromised if the complexity is too great. The four different life exponents each applied in various manners on different components can become too confusing for effective use. Therefore, a “representative” exponential life factor of 6.7 was selected to be the weighted tool to be applied to all components (and thus representative of the shovel 10 as a whole), for the most practical life indicator. Alternatively, other representative exponential factors may be chosen.
In
Conversely,
The aforementioned shovel life methodology is intended as a guide to determining useful component life based on dipper loads, overloads, and underloads. Other factors, such as operator abuse, swinging with the dipper in the bank, dipper impacts, fragmentation, highwall cave-ins, and digging on a slope may affect the life of the shovel components, are contemplated but not included in this methodology
The cumulative life scores of specific components of the mining shovel 10 can also be used to determine maintenance requirements as a result of an operator's performance. For example, as discussed above, the life of bearings are affected differently than the life of gearing for the same load. The relative life scores of specific components can be determined as a function of the dipper payloads to determine if a specific component's life is being consumed at a faster rate than anticipated as a result of higher than expected loads being lifted by the mining shovel. A report generated by the mining shovel operating system can be generated to display the need to perform unscheduled maintenance on the specific component aging faster than anticipated to avoid premature failure of the specific component.
Thus, the aforementioned method is of benefit to the health and well being of the shovel 10 as well as associated haul trucks. Utilization of this invention can yield positive results in the form of extended reliability, improved availability, increased productivity, and reduced operating costs. Both machinery end users and suppliers may jointly benefit from this capability.
While there has been shown and described what are at present considered the preferred embodiments of the invention, it will be obvious to those skilled in the art that various changes and modifications can be made therein without departing from the scope of the invention defined by the appended claims.
This application claims the benefit of U.S. Provisional Patent Application Ser. No. 60/949,583, filed on Jul. 13, 2007, and entitled METHOD OF MANAGING SHOVEL LOAD, the entirety of which is hereby incorporated by reference.
Number | Date | Country | |
---|---|---|---|
60949583 | Jul 2007 | US |