Information
-
Patent Grant
-
6709192
-
Patent Number
6,709,192
-
Date Filed
Tuesday, September 5, 200024 years ago
-
Date Issued
Tuesday, March 23, 200421 years ago
-
Inventors
-
Original Assignees
-
Examiners
- Swann; J. J.
- Mitchell; Katherine
Agents
-
CPC
-
US Classifications
Field of Search
US
- 404 34
- 404 40
- 404 47
- 404 51
- 404 52
- 404 56
- 052 600
- 052 596
- 052 607
-
International Classifications
-
Abstract
A pre-fabricated pavement slab having a binder distribution system and an interconnection system formed for attachment of the bottom surface of the slab, wherein both the binder distribution system and the interconnection system are accessible from the top surface of the slab, such that the binder material may be injected into the binder distribution and interconnection systems from the top surface of the slab.
Description
BACKGROUND OF THE INVENTION
1. Technical Field
The present invention relates generally to roadway construction and repair, and more particularly, to the formation, installation and system for attaching a pre-fabricated pavement slab, and the slab so formed.
2. Related Art
Heretofore, attempts have been made to construct and install pre-fabricated or precast pavement slabs. However, most attempts have been relatively unsuccessful due to a combination of factors. For example, it is difficult to prepare and maintain a perfectly smooth sub-grade which is necessary to uniformly support the slab. Likewise, it is difficult to connect adjacent slabs in a manner that uniformly transfers shear loading from one slab to the next. Accordingly, there exists a need in the industry for a precast pavement slab and a method of installing the slab that solves these and other problems.
SUMMARY OF THE INVENTION
A first general aspect of the present invention provides a pre-fabricated pavement slab comprising: at least one connector extending from a first end of the slab; at least one mating interconnection formed within a second end thereof to receive the connector, wherein the interconnection is accessible from a top surface of the slab; and a plurality of channels formed within a bottom surface of the slab, wherein at least one channel is accessible from the top surface of the slab.
A second general aspect of the present invention provides a system for installation of a pre-fabricated pavement slab comprising: a binder distribution system formed for attachment of a bottom surface of the slab and accessible from a top surface of the slab; and an interconnection system along edges of the slab and accessible from the top surface of the slab.
A third general aspect of the present invention provides a method of installing a pre-fabricated pavement slab, comprising: placing the slab on a graded subbase; and uniformly distributing a binder material along a bottom surface of the slab via at least one access in a top surface of the slab.
A fourth general aspect of the present invention provides a method of forming a prefabricated pavement slab comprising: providing a form for forming binder distribution system within a bottom surface of the slab; pouring a pavement material into the form; and incorporating a plurality of interconnections within a first end of the slab.
A fifth general aspect of the present invention provides a device comprising: a first slab and a second slab, wherein the first and second slabs further comprise a binder distribution system formed within a bottom surface of the first and second slabs; and a shear transfer device between the first and second slabs.
The foregoing and other features of the invention will be apparent from the following more particular description of the embodiments of the invention.
BRIEF DESCRIPTION OF THE DRAWINGS
The embodiments of this invention will be described in detail, with reference to the following figures, wherein like designations denote like elements, and wherein:
FIG. 1
depicts a plan view of a pre-fabricated pavement slab in accordance with the present invention;
FIG. 2
depicts a cross-sectional view of the pre-fabricated pavement slab in accordance with the present invention;
FIG. 3
depicts a cross-sectional view of a transverse dowel bar in accordance with the present invention;
FIG. 4A
depicts a cross-sectional view taken along line
4
—
4
of
FIG. 1
, of a connector slot in accordance with embodiments of the present invention;
FIG. 4B
depicts
FIG. 4A
using an alternative connector slot in accordance with embodiments of the present invention;
FIG. 4C
depicts
FIG. 4A
using an alternative connector slot in accordance with embodiments of the present invention;
FIG. 5
depicts a cross-sectional view taken along line
5
—
5
of
FIG. 1
, of a channel in accordance with embodiments of the present invention;
FIG. 6
depicts a cross-sectional view taken along line
6
—
6
of
FIG. 1
, of the channel in accordance with embodiments of the present invention;
FIG. 7
depicts a cross-sectional view taken along line E—E of
FIG. 1
, of a connector slot in accordance with embodiments of the present invention;
FIG. 8A
depicts a cross-sectional view taken along line
8
—
8
of
FIG. 1
, of a connector slot in accordance with embodiments of the present invention;
FIG. 8B
depicts
FIG. 8A
using an alternative connector slot in accordance with embodiments of the present invention;
FIG. 8C
depicts
FIG. 8A
using an alternative connector slot in accordance with embodiments of the present invention;
FIG. 9
depicts a top mat in accordance with the present invention;
FIG. 10
depicts a bottom mat in accordance with the present invention;
FIG. 11
depicts a gasket in accordance with the present invention;
FIG. 12
depicts
FIG. 11
using additional sections of a gasket in accordance with embodiments of the present invention;
FIG. 13A
depicts a cross-sectional view of a connector and an existing slab in accordance with embodiments of the present invention;
FIG. 13B
depicts a cross-sectional view of a two piece connector and an existing slab in accordance with embodiments of the present invention;
FIG. 13C
depicts a plan view of a slot cut in an existing slab in accordance with the present invention;
FIG. 13D
depicts a cross-sectional view of a slot cut in an existing slab in accordance with the present invention;
FIG. 14
depicts a grading device used in accordance with the present invention; and
FIG. 15
depicts a form used to construct the slab in accordance with the present invention.
DESCRIPTION OF THE PREFERRED EMBODIMENTS
Although certain embodiments of the present invention will be shown and described in detail, it should be understood that various changes and modifications may be made without departing from the scope of the appended claims. The scope of the present invention will in no way be limited to the number of constituting components, the materials thereof, the shapes thereof, the relative arrangement thereof, etc. Although the drawings are intended to illustrate the present invention, the drawings are not necessarily drawn to scale.
Referring to the drawings,
FIG. 1
shows a plan view of a pre-fabricated pavement slab
10
. The slab
10
may be constructed by pouring a pavement material, such as concrete, or other similarly used material, into a form
60
, having a plurality of raised channel forming surfaces
62
, raised slot forming surfaces
64
, connector openings
66
and port forming surfaces
68
(refer to FIG.
15
). The raised channel forming surfaces may be independent from the raised slot forming surfaces as shown in FIG.
15
. The slab
10
may be used in high traffic areas, such as highways, on/off ramps, airport runways, toll booth areas, etc. The pavement slab
10
is approximately 10-12 feet (3.049-3.658 m) wide W, as required by the New York State Department of Transportation, and approximately 18 feet (5.486 m) in length L. The slabs
10
may range in thickness T from approximately 9-12 inches. These dimensions, L, W, T, however, may vary as desired, needed or required and are only stated here as an example.
The top surface
9
of the slab
10
is a roughened astroturf drag finish, while the sides
11
a
and
11
b
, the ends
11
c
and
11
d
, and bottom surface
13
of the slab
10
have a substantially smooth finish (refer to
FIG. 2
, which shows a cross-sectional view of a corner of the slab
10
). The side
11
a
or the side
11
b
may be a first edge and the end
11
c
or the end
11
d
may be a second edge. The bottom surface
13
, the sides
11
a
and
11
b
, and the ends
11
c
and
11
d
of the slab
10
come together to form a chamfer
15
around the perimeter of the slab
10
. The chamfer
15
prevents soil build-up between two mating slabs which may occur if the slab
10
is tipped slightly during installation.
The slab
10
further includes a plurality of connectors
12
that may comprise transverse slippable connecting rods or dowels. The plurality of connectors may be embedded within a first end of the slab
10
. In one embodiment, the connectors
12
are post tensioned interconnections, as known and used in the industry, wherein multiple slabs may be connected in compression. The connectors
12
are spaced approximately 1 ft. apart along the width W of the slab
10
, and comprise steel rods, or other similar material conventionally known and used. Each connector
12
is of standard dimensions, approximately 14 inches in length and 1.25 inches in diameter. The slippable connectors
12
are mounted truly parallel to the longitudinal axis L of the slab
10
to allow adjacent slabs
10
to expand and contract without inducing unwanted damaging stresses in the slabs
10
. The connectors
12
are preferentially mounted such that approximately half of the connector
12
is embedded within the pavement slab
10
and half of the connector
12
extends from the end of the slab
10
.
FIG. 3
shows a cross-sectional view (along line
3
—
3
of
FIG. 1
) of the slab
10
and a connector
12
extending therefrom. As illustrated, the connectors
12
are embedded within a first end lid of the slab
10
at approximately the midpoint of the thickness T of the slab
10
. The connectors
12
aid in transferring an applied shear load, i.e., from traffic, evenly from one slab
10
to the adjacent slab, without causing damage to the slab
10
.
The slab
10
further includes a plurality of inverted interconnection slots
14
formed within the bottom surface
13
of the slab
10
at a second end
11
c
thereof. Each interconnection slot
14
is sized to accommodate the connectors
12
extending from the end of an adjacent slab
10
, thereby forming an interconnection between adjacent slabs once the slot
14
is filled around the connectors
12
with a binder material.
FIG. 4A
shows a cross-sectional view (along line
4
—
4
of
FIG. 1
) of an interconnection slot
14
, wherein the slot
14
is wider at the top of the slot
14
than at the bottom of the slot
14
. This wedged shape prevents the slab
10
from moving downward with respect to the adjacent slab with the application of a load once the binder material has reached sufficient strength.
In the alternative, the interconnection slots
14
may take the form of a “mouse hole” having a pair of cut-outs or holes
17
formed on both sides thereof, as illustrated in FIG.
4
B. In this case, when the slots
14
are filled with a binder material, the holes
17
form shear pins on the sides of the mouse hole that would have to be sheared in order for the slab
10
to move downward with respect to the adjacent slab. In the alternative, the slots
14
may have vertically oriented sides, as illustrated in FIG.
4
C. In this case the sides of the slot
14
are sandblasted to provide a roughened surface, thereby frictionally limiting the ability of the slab
10
to move downward with respect to the adjacent slab.
As illustrated in
FIGS. 4A-4C
, each interconnection slot
14
further includes an opening, access or port
16
. In particular, a binder material such as structural grout or concrete, a polymer foam material, or other similar material, may be injected within each port
16
thereby filling the interconnection slot
14
receiving the inserted connector
12
(not illustrated) to secure adjacent slabs end to end.
It has been previously noted that the connectors
12
are preferentially mounted as described above with approximately half of the connector
12
embedded in an adjacent slab while the other half is engaged and embedded in the interconnections slots
14
of slab
10
. Alternatively, the same connector
12
may be preplaced on the subgrade, not shown, such that interconnections slots
14
in both slabs engage the connectors
12
, such interconnection slots
14
being subsequently filled with binder material in the same manner described in the foregoing.
The slab
10
further includes a plurality, in this example three, channels
18
running longitudinally along the length L of the slab
10
. The channels
18
formed within the bottom surface
13
of the slab
10
facilitate the even dispersement of a bedding material, such as bedding grout or concrete, a polymer foam material, or other similar material, to the underside of the slab
10
. As shown in
FIG. 5
, which depicts a cross-sectional view of the slab
10
(along line
5
—
5
of FIG.
1
), each channel
18
includes a port
20
at each end of the channel
18
(one end shown in FIG.
5
). Each port
20
extends from the top surface
9
of the slab
10
to the channel
18
, thereby providing access to the channel
18
from the top surface
9
of the slab
10
. This facilitates the injection of bedding material beneath the bottom surface
13
of the slab
10
via ports
20
which are accessible from the top surface
9
after the slab
10
has been installed.
As illustrated in
FIG. 6
, which shows a cross-sectional view of the channels
18
along a line
6
—
6
of
FIG. 1
, the channels
18
are in the shape of half round voids. The rounded shape aids in the uniform distribution of bedding material along the bottom surface
13
of the slab
10
to fill any gaps between the slab
10
and the subbase (not shown). In the alternative, the channels
18
may take other shapes, such as rectangles, etc. Furthermore, instead of using channels
18
to facilitate the even dispersement of the bedding material beneath the slab
10
, a pipe system may be used. For instance, the pipe system (not shown) may comprise a plurality of pipes, approximately one inch in diameter, having holes or continuous slots formed therein.
The slab
10
further includes a plurality of interconnection slots
24
, shown in this example within a first side
11
a
of the slab
10
(FIG.
1
). The slots are illustrated more clearly in FIGS.
7
and
8
A-
8
C. In particular,
FIG. 7
shows a cross-sectional view of an interconnection slot
24
taken along a line
7
—
7
of FIG.
1
. As illustrated, each interconnection slot
24
comprises a pair of openings, accesses or ports
26
at each end of the slot
24
which extend from the top surface
9
of the slab
10
to the interconnection slot
24
thereunder.
The slab
10
further includes a plurality connectors
69
that may comprise, longitudinal connectors, non-slippable connecting rods, or dowels embedded within a second side
11
b
of slab
10
along the length L of the slab
10
. As with the connectors
12
, the connectors
69
may be post tensioned interconnections. The connectors
69
may be one-piece, where approximately half of the connector
69
is embedded within the pavement slab
10
and half of the connector
69
extends from the second side
11
b
of the slab
10
. Alternatively, the connector
69
may be of a two-piece design comprising a first connector
54
and a second connector
56
as shown in FIG.
13
B. The two-piece design would be used if it is desirable to keep shipping width of slab
10
to a minimum.
FIG. 8A
depicts a cross-sectional view of the interconnection slot
24
and port
26
along line
8
—
8
of FIG.
1
. Similar to the interconnection slots
14
along the ends
11
c
and
11
d
of the slab
10
(shown in FIGS.
4
A-
4
C), the interconnection slots
24
along the sides
11
a
and
11
b
of the slab
10
may alternatively take the form of a mouse hole
24
having cut-outs or holes
25
(FIG.
8
B), or a slot
24
having vertically oriented sandblasted sides (FIG.
8
C). The interconnection slots
24
receive connectors
69
that may comprise non-slippable connecting rods or dowels located within and extending from an adjacent new slab
10
or from an existing slab
50
, such has been described embedded in the [other] second side
11
b
of slab
10
.
After the slab has been installed and the connectors are in their final location, a binder material, such as structural cement-based grout, a polymer foam, etc., is then injected into the interconnection slots
24
, having the rods inserted therein, from the top surface
9
of the slab
10
via the ports
26
. This aids in rigidly interconnecting adjacent slabs of the roadway and facilitates a relatively even load transfer between lanes.
The slab
10
further includes a top mat
32
and a bottom mat
34
(
FIGS. 9 and 10
, respectively). Both mats
32
,
34
comprise reinforcing bars, or in the alternative reinforced steel mesh. The top mat
32
, comprising longitudinal bars
31
and at least two transverse or cross bars
29
, is formed within the slab
10
substantially near the top surface
9
of the slab
10
. The top mat
32
prevents the slab
10
from “curling” or bending at the edges as a result of cyclic loading produced by temperature differentials. Likewise, the bottom mat
34
comprises longitudinal bars
33
and transverse or cross bars
35
formed within the slab
10
substantially near the bottom surface
13
of the slab
10
. The bottom mat
34
provides the slab
10
with additional reinforcement and stability during handling.
A seal or gasket
36
, comprising a compressible closed cell foam material, such as neoprene foam rubber or other similar material, is attached to the bottom surface
13
of the slab
10
around the perimeter of the slab
10
, as illustrated in FIG.
11
. The gasket
36
is approximately 12 mm thick and 25 mm wide, and is soft enough to fully compress under the weight of the slab
10
. The gasket
36
forms a chamber or cavity
38
thereby sealing the boundary of the slab
10
. This allows for the application of pressure to the bedding material during installation to ensure that all voids between the bottom surface
13
of the slab
10
and the subbase are filled.
Optionally, additional sections of the gasket
36
, having the same or similar width and thickness, may be applied to the bottom surface
13
of the slab
10
to form a plurality of individual chambers or cavities
38
, as illustrated in FIG.
12
. The additional sections of the gasket
36
forming the cavities
38
reduce the amount of upward pressure exerted on the slab
10
during the injection of the bedding material as compared to that experienced by the slab
10
using one large sealed cavity (as illustrated in FIG.
11
). Forming at least 3 to 4 cavities
38
effectively reduces the lift force produced from below the slab
10
as the bedding material is being forced thereunder.
To install the slab
10
, connectors
12
may first need to be installed along the transverse end of an existing slab
50
and connectors
69
may need to be installed along the longitudinal side of the existing slabs
50
, to match interconnection slots
14
and
24
, respectively. If so, a hole may be drilled within the existing slab
50
, using carbide tipped drill bits, or other similar tools. Thereafter, the connector
12
or the connector
69
is inserted within each hole, along with a binder material, such as a cement-based or epoxy grout, polymer foam, etc., such that approximately one half of the connector
12
or the connector
69
extends therefrom, as illustrated in
FIGS. 3 and 13A
, respectively. Slab
10
and existing slab
50
may be the same structurally and both slab
10
and existing slab
50
may have interconnect slots and/or connectors.
Alternatively to installing connectors
12
and connectors
69
in the existing slab to mate with the interconnection slots
14
and
24
in the slab
10
, the same connectors
12
and connectors
69
may be embedded in the slab
10
such that they extend from the slab
10
as described above. In this case, a vertical slot
70
is cut in the existing slabs
50
using a diamond blade concrete saw, or other similar tool, in locations corresponding to the extended connectors
12
and connectors
69
in slab
10
(refer to FIGS.
13
C and
13
D). The sawing operation would be done ahead of the slab
10
installation operation. The slots
70
would be opened up and burrs removed using a light-weight pneumatic chipping hammer, or other similar tool. This option would be chosen to avoid the above described drilling process that should be done during the night-time grading operation.
In preparation for slab installation, the replacement area (the area in which the slab
10
will be placed) is cleaned of all excess material to provide a subbase or sub-grade approximately 25 mm below the theoretical bottom surface
13
of the slab
10
. The subbase is graded with conventional grading equipment such as a grader, skid steer loader, etc., and fully compacted with a vibratory roller or other similar device. The compacted subgrade is subsequently overlaid with approximately 30 mm of finely graded material such a stone dust that can be easily graded with the precision grading equipment described below.
The stone dust is then graded with a conventional screeding device or a laser-controlled screeding device, such as the Somero Laser Screed™ (Somero Enterprises of Jafrey, N.H.), as illustrated in FIG.
14
. The Somero Laser Screed™ is controlled by a rotating laser beam that is continuously emitted by a laser transmitter
42
, located at a remote location and at least 6-8 feet above ground level. The transmitter is adjusted to emit a beam of unique cross-slope and grade corresponding to the plane required for the slab
10
. The cross-slope allows for water run-off and the grade represents the longitudinal slope required for vertical alignment of the roadway.
For straight highways, where the cross-slope and the grade are constant, the rotating laser beam set as described above will serve to set multiple slabs. For both horizontally and vertically curved highways the rotating laser beam will have to be set to a distinct plane for each slab. This continuous adjustment may be done manually or automatically with software designed for that specific purpose: Alternatively, the screed may by controlled by other electronic means unique to the Somero Laser Screed™.
Specific to the Somero Laser Screed™, laser receivers
44
, mounted on posts
46
above the screed
48
, receive and follow the theoretical plane emitted from the transmitter
42
as the grading screed
48
is pulled over the replacement area. After the first grading pass, the stone dust layer is fully compacted with a vibratory roller or other similar device and a second grading pass is made in which the subbase is brought to within {fraction (1/16)}
th
of an inch (or “Super-graded”) of the required theoretical plane. After super-grading has been completed, the stone dust layer is dampened with water, as needed for the subsequent grouting process, in final preparation for installation of the slab
10
.
The slab
10
is placed within the replacement area such that the slab
10
contacts the subbase uniformly so as not to disrupt the subbase or damage the slab
10
. During placement, the slab
10
is lowered vertically to the exact location required to match the existing adjacent slabs
50
. Care is taken to insure the interconnection slots
14
and
24
, within the sides and end (if an adjacent slab
50
is present at the end of the slab
10
) of the slab
10
are lowered over the connectors
12
and connectors
69
extending from the ends and sides of the adjacent slabs
50
respectively. In the case where connectors
12
and connectors
69
extend from the slab
10
, the slab
10
is also lowered vertically and carefully to insure the connectors
12
and connectors
69
are set within the slots
70
of the adjacent existing slabs
50
. At this time, the slab
10
should be within 6+/−mm of the theoretical plane emitted from the rotating laser transmitter
42
. In the event the surface
9
of the slab
10
is out of the required tolerance it is planed with a conventional diamond grinder until it is brought within tolerance.
The interconnection slots
14
,
24
or
70
, as the case may be are filled from the top surface
9
of the slab
10
with a binder material such as structural grout, or in the alternative, a polymer foam material, thereby fastening the slab
10
to the connectors
12
,
54
,
56
,
69
or the slot
70
of the adjacent injected under pressure into a first port
16
,
26
of the interconnection slots
14
,
24
, respectively, until the binder material begins to exit the port
16
,
26
at the other end of the interconnection slot
14
,
24
. It is desirable for the binder material within the slots
14
,
24
to reach sufficient strength to transfer load from one slab to the other before opening the slab
10
to traffic.
The chamber(s)
38
formed by the gasket
36
on the bottom surface
13
of the slab
10
is/are then injected from the top surface
9
of the slab
10
with bedding material, such as grout including cement, water and fly ash, or in the alternative with a polymer foam material. In particular, starting from the lowest or downhill region, bedding material is injected into the port
20
at one end of the channel
18
until the bedding material begins to exit the port
20
at the other end of the channel
18
. The bedding material is injected into the channels
18
to ensure that all voids existing between the bottom surface
13
of the slab
10
and the subbase, regardless of size, are filled. The slab
10
should be monitored during injection of the bedding material to ensure the slab
10
is not vertically displaced due to the upward pressure created thereunder. It is desirable for the bedding material under the slab
10
to reach a minimum strength of approximately 10.3 MPa before opening the slab
10
to traffic.
It should be noted that due to the precision of the Super Graded subbase, the channels
18
may not need to be filled prior to exposure of the slab
10
to traffic. Rather, the channels
18
may be filled within 24-48 hours following installation of the slab
10
without damaging the slab
10
or the subbase. This is particularly useful due to time constraints.
While this invention has been described in conjunction with the specific embodiments outlined above, it is evident that many alternatives, modifications and variations will be apparent to those skilled in the art. Accordingly, the embodiments of the invention as set forth above are intended to be illustrative, not limiting. Various changes may be made without departing from the spirit and scope of the invention as defined in the following claims.
Claims
- 1. A pre-fabricated pavement slab comprising:at least one connector extending from an interconnection in a first end of the slab; at least one mating interconnection formed within a second end thereof to receive at least one connector from an adjacent pre-fabricated pavement slab, wherein an interface of the at least one mating interconnection and the at least one connector is open to a bottom surface of the slab, and wherein the at least one mating interconnection does not extend through the slab and, wherein the at least one mating interconnection is accessible from a top surface of the slab; and a plurality of channels formed within the bottom surface of the slab and, wherein at least one channel is accessible from the top surface of the slab.
- 2. The pre-fabricated pavement slab of claim 1, further comprising at least one interconnection formed at a first and second side.
- 3. The pre-fabricated pavement slab of claim 2, wherein each interconnection within the first and second sides of the slab receives a connector extending from a side of an adjacent slab.
- 4. The pre-fabricated pavement slab of claim 3, wherein the connectors extending from the side of the adjacent slab comprise a unitary reinforcement rod.
- 5. The pre-fabricated pavement slab of claim 3, wherein the connectors extending from the side of the adjacent slab comprise a reinforcement bar have a connectable male and female end.
- 6. The pre-fabricated pavement slab of claim 2, wherein the interconnection formed within the first and second ends and the first and second sides of the slab comprise inverted slots.
- 7. The pre-fabricated pavement slab of claim 6, wherein the inverted slots have a top width greater than a base width.8.The pre-fabricated pavement slab of claim 6, wherein the inverted slots have substantially vertically oriented sides, and wherein the vertically oriented sides have a roughened surface.
- 9. The pre-fabricated pavement slab of claim 6, wherein each inverted slot further comprises at least one vertically oriented opening extending from the top surface of the slab to the slot.
- 10. The pre-fabricated pavement slab of claim 1, wherein the connectors extending from the first end of the slab comprise a unitary reinforcement rod.
- 11. The pre-fabricated pavement slab of claim 1, wherein the channels within the bottom of the slab comprise inverted half round openings.
- 12. The pre-fabricated pavement slab of claim 1, wherein the channels within the bottom of the slab extend longitudinally along the length of the slab.
- 13. The pre-fabricated pavement slab of claim 1, wherein at least one opening of a binder distribution system extends vertically from the top surface of the slab to the channel.
- 14. The pre-fabricated pavement slab of claim 1, wherein a binder distribution system, accessible from the top surface of the slab, uniformly distributes a binder material to the bottom surface of the slab.
- 15. The pre-fabricated pavement slab of claim 14, wherein the binder material comprises grout.
- 16. The pre-fabricated pavement slab of claim 14, wherein the binder material comprises a polymer foam.
- 17. The pre-fabricated pavement slab of claim 1, wherein the channels further include at least one port within each channel providing access to the channel from the top surface of the slab.
- 18. The pre-fabricated pavement slab of claim 17, wherein the ports are vertically oriented.
- 19. The pre-fabricated pavement slab of claim 1, further comprising a gasket surrounding the perimeter of the slab on the bottom surface thereof.
- 20. The pre-fabricated pavement slab of claim 19, wherein the gasket forms a plurality of chambers on the bottom surface of the slab.
- 21. The pre-fabricated pavement slab of claim 19, wherein the gasket comprises a closed-cell foam material.
- 22. The pre-fabricated pavement slab of claim 1, further comprising a first reinforcement mat formed within the slab substantially near the top surface of the slab.
- 23. The pre-fabricated pavement slab of claim 22, further comprising a second reinforcement mat formed within the slab substantially near the bottom surface of the slab.
- 24. The pre-fabricated pavement slab of claim 23, wherein the reinforcement mats substantially near the top and bottom surfaces of the slab comprise reinforcement rods.
- 25. The pre-fabricated pavement slab of claim 23, wherein the reinforcement mats substantially near the top and bottom surfaces of the slab comprise reinforced steel mesh.
- 26. The pre-fabricated pavement slab of claim 1, wherein the at least one connector is post tensioned.
- 27. A pre-fabricated pavement slab comprising:a first connector extending from a first interconnection in a first end of the slab; a second interconnection formed within a second end thereof to receive a second connector, wherein the second interconnection is accessible from a top surface of the slab; a plurality of channels formed within a bottom surface of the slab, wherein at least one channel is accessible from the top surface of the slab; a third interconnection formed at a first side of the slab; a fourth interconnection formed at a second side of the slab; and wherein the first, second, third, and fourth interconnections comprise inverted slots; wherein the inverted slots have a rounded top section and at least one shear pin along a side of the slot.
- 28. A device comprising:a first slab and a second slab, wherein the first and second slabs comprise a binder distribution system formed within a bottom surface of the first and second slabs, wherein the binder distribution system facilitates injection of a hardenable, curable bedding material to substantially fill all voids existing between the bottom surface of the first and second slabs and a graded subbase, further wherein said binder distribution system comprises at least one channel wherein said at least one channel does not extend to both ends of said slabs; and a shear transfer device between the first and second slabs.
- 29. The device of claim 28, wherein the shear transfer device is post tensioned.
- 30. A device comprising:a plurality of pavement slabs, each having a first interconnection along a first edge of each slab for attachment of the first edge of each slab and a second interconnection along a second edge of each slab for attachment of the second edge of each slab, wherein the first edge of each slab is not parallel to the second edge of each slab, and wherein at least one interconnection does not extend an entire length of the slab, further wherein the first interconnection and second interconnection are open to a bottom surface of the slab and accessible from a top surface of the slab.
- 31. The device of claim 30 wherein the interconnection is a slot comprising, a port extending from the first interconnection slot to a top surface of the slab.
- 32. The device of claim 30 wherein the interconnection is a slot comprising, a port extending from the second interconnection slot to a top surface of the slab.
- 33. A device comprising:a plurality of pavement slabs, each having a first interconnection along a first edge of each slab for attachment of the first edge of each slab and a second interconnection along a second edge of each slab for attachment of the second edge of each slab, wherein the first edge of each slab is not parallel to the second edge of each slab, and wherein at least one interconnection has only one opening on one edge of the slab and wherein at least one of the first interconnection and the second interconnection is a slot comprising, a rounded top section on the slot and at least one surface to form a shear pin along a side of the slot.
- 34. A device comprising:a plurality of pavement slabs, each having a first interconnection along a first edge of each slab for attachment of the first edge of each slab and a second interconnection along a second edge of each slab for attachment of the second edge of each slab, wherein the first edge of each slab is not parallel to the second edge of each slab, and wherein at least one interconnection has only one opening on one edge of the slab, and wherein at least one of the first interconnection and second interconnection is a slot comprising, the slot with a top width greater than a base width.
- 35. A pre-fabricated pavement slab comprising:an interconnection slot formed for attachment of the slab such that the interconnection slot comprises a geometry that will prohibit a binder material that is placed in the interconnection slot from moving in a vertical direction thereby preventing the slab from moving in a vertical direction with respect to an adjacent slab, wherein the interconnection slot does not extend a full length of the slab, further wherein the width of an interconnection slot opening at a bottom surface of the slab is narrower than the width of the interconnection slot at its widest point.
- 36. The pre-fabricated pavement slab of claim 35 further comprising, a port extending from the interconnection slot to a top surface of the slab.
- 37. A pre-fabricated pavement slab comprising an interconnection slot formed for attachment of the slab such that the interconnection slot comprises a geometry that will prohibit a binder material that is placed in the interconnection slot from moving in a vertical direction thereby preventing the slab from moving in a vertical direction with respect to an adjacent slab wherein the interconnection slot does not extend a full length of the slab, the interconnection slot further comprising, a rounded top section on the interconnection slot and at least one surface to form a shear pin along a side of the interconnection slot.
US Referenced Citations (28)