This invention relates to a method of grading an existing railroad bed in which cables and/or tubes are embedded outside of the rails. It relates also to a laser-measuring device for reading the profile of a railroad bed.
Old railroad beds will often have too much material on each side of the track so that the track will be more or less in a trench, which will obstruct the drainage. The material itself has also often a bad draining capacity. The allowed axle load is often 22 tonnes for old railroad beds whereas an axle load of for example 30 tonnes can be allowed on a perfect railroad bed. Old railroad beds may also allow a higher axle load if their parts outside of the track are regraded (including removal of excess material). If new macadam must be replaced for a part of the old material, it is often possible to remove the material, screen it and replace a coarse part of it.
There are often cables embedded at the side of the track and they are sometimes in tubes or hoses. They should nowadays normally be at a depth of one meter but they are often closer to the surface in old roadbeds. Usually, ordinary bucket excavators are used to remove the excess material and, in order not to damage the cables, a man with a manual worktool, for example a pick axe, must aid in the excavation. This operation is costly and time consuming and still, the risk of damaging the cables is not eliminated.
It is an object of the invention to provide a method of grading an existing railroad bed in which cables and/or tubes are embedded outside of the rails, which method is safer and faster and more economic than usually used methods. It is also an object o the invention to provide a laser measuring device for reading the profile of a railroad bed.
The method according to the invention is characterised in that, at intervals along the bed, one removes material by suction so that pits or transverse trenches are formed at each side of the track and, with a laser camera, one both reads the profile adjacent the pits and the positions of the embedded cables/tubes and saves this information, and then, by using the saved information, one controls a device for mechanically excavating material from the roadbed sides without damaging the embedded cables/tubes and grades the railroad bed.
The laser measuring device according to the invention comprises a rail car with a transverse guide beam and a carriage with a laser camera arranged to be movable along the guide beam, and the laser camera is directed downwards to read the distance to the ground and a computer is coupled to register the position of the carriage on the rail and the distance from the camera to the ground.
The invention is defined by the claims.
The device, a measuring rail car, shown in
The laser camera of the carriage 15 is directed downwards and it reads the distance to the ground or to the object that the laser beam meets, and this distance is registered and stored in the computer together with the position of the carriage on the guide beam; that is, the position of the camera on the guide beam. The laser camera is of any conventional kind available on the market.
The
The scraper conveyors 33, 34 are identical and only the scraper conveyor 34 will be described in more detail. It has a chute 50 with two wheels 51, 52 on which there is an endless band or endless chains 53. The chains 53 have scrapers or buckets 54, only one of which is indicated. The wheel 51 drives the chains 53 so that the scrapers 54 scrape the material up along the bottom of the chute 50 and down into the chute 37.
The scraper conveyor 34 is shown having a head 55 with spurs 60, 61 arranged to loosen the ground and to indicate when they meet stones too big for the scraper conveyor. The head 55 is mounted to an axle 56, and an hydraulic cylinder 57 provides swinging movement to the axle 56.
The scraper conveyors can for example have a width of between 0.5 and 1 meter and usually, the entire train has to do more than one run to cover the entire sides of the roadbed. One operator controls the left scraper conveyor and another operator controls the right one. A machine of this kind may excavate 200 cubic meters of material an hour.
The method according to the invention is carried out in three or four main steps.
Step 1:
In appropriate intervals, usually in intervals of between 15 and 30 meters, one makes pits or transverse trenches in the railroad bed at the sides of the track by means of a vacuum excavator. The trenches or pits are made so deep that possible tubes or cables are freed. With this method of sucking away the material, there is no risk of damaging the tubes or cables.
Step 2:
The rail car 11 shown in
With the information stored in the computer, the profile of the roadbed and the positions of the various tubes and cables are analysed, and it is decided for each portion of the roadbed how much of the material that must be removed and if it can be done without risk of damaging the cables or tubes. It is also decided whether or not material has to be removed, screened and replaced in order to improve the draining capability of the roadbed. If the cables or tubes can remain in their positions and no cables or tubes need be added, step 3 can be omitted.
Step 3:
If the cables or tubes must be lowered, as much as possible of the material above them are removed preferably by being ploughed aside, and the cables and tubes are freed along their entire length by the same suction excavator as used in step 1. Then, they are lowered by a conventional cable-laying plough together with any additional cables or tubes.
Step 4:
Mechanical excavation is carried out as a result of the analysis carried out in step 2. Preferably, but not necessarily, a railbound excavating machine as described with reference to
Comments:
The two first steps are comparatively not very costly and as a result of the analysis in step 2, the further steps can be decided as to their necessity and acuteness. The steps 1 and 2 can be carried out one year and the following more expensive steps can be carried out the following year or even some years later. The method provides a possibility to make a priority between various railway lines in a way that is not very costly. The analysis in step 2 makes it possible to provide very accurate documents as basis for tenders for the steps 3 and 4.
Number | Date | Country | Kind |
---|---|---|---|
0001130 | Mar 2000 | SE | national |
Filing Document | Filing Date | Country | Kind | 371c Date |
---|---|---|---|---|
PCTSE01/00669 | 3/28/2001 | WO | 00 | 9/25/2002 |
Publishing Document | Publishing Date | Country | Kind |
---|---|---|---|
WO0175231 | 10/11/2001 | WO | A |
Number | Name | Date | Kind |
---|---|---|---|
5301548 | Theurer | Apr 1994 | A |
6014815 | Jager | Jan 2000 | A |
6736216 | Savard et al. | May 2004 | B2 |
Number | Date | Country |
---|---|---|
2268529 | Jan 1994 | GB |
2328576 | Feb 1999 | GB |
Number | Date | Country | |
---|---|---|---|
20030090683 A1 | May 2003 | US |