Claims
- 1. A method of mining including installing a mine support in a mine, the support being removable by cutting a coal shearer, said method comprising:(i) locating in a mine a form where it is desired to provide support for the mine, the form being composed of a plurality of engaging parts shaped to produce a pillar when filled with a settable material, and the parts being disengageable to permit subsequent removal; (ii) filling the form with a settable cementitious material, which when set is cuttable with a coal shearer, and allowing the material to set; wherein (i) and (ii) are practiced so that there is a gap between the top of the pillar and the roof of the mine; (iii) removing the form to provide a pillar in the mine which is cuttable with a coal shearer; and (iv) inserting a bag of yieldable material in the gap.
- 2. A method as claimed in claim 1 further comprising (v) cutting through the pillar and bag of yieldable material and removing same.
- 3. A method as claimed in claim 2 wherein (i)-(iv) are practiced in a coal mine.
- 4. A method as claimed in claim 1 further comprising (vi) reusing the parts of the form after removal from the pillar to make a second pillar.
- 5. A method as claimed in claim 4 wherein (i)-(iv) and (vi) are practiced in a coal mine.
- 6. A method as claimed in claim 1 wherein (i)-(iv) are practiced in a coal mine.
CROSS-REFERENCE TO RELATED APPLICATION
This application is based upon provisional application Ser. No. 60/074,940 filed Feb. 17, 1998.
US Referenced Citations (6)
Foreign Referenced Citations (1)
Number |
Date |
Country |
901210 |
Feb 1990 |
ZA |
Provisional Applications (1)
|
Number |
Date |
Country |
|
60/074940 |
Feb 1998 |
US |