Abstract
A method of installing an off-shore tidal hydroelectric turbine generator is described. The method provides for a number of safety features, ensuring that all components are safe to handle during the installation operation, and also ensuring that the turbine will not start spinning during the installation operation.
Description
FIELD OF THE INVENTION

This invention relates to a method of safely installing a sub sea tidal hydroelectric turbine generator.


BACKGROUND OF THE INVENTION

The increased interest in environmental awareness, and a reluctance to rely on non-renewable sources of energy, has led to greater usage of renewable energy systems, e.g. solar power, wind power, thermal power, and tidal power. The latter involves the installation of turbine generators in an area of tidal flow, and converts the energy of the tides into electrical power.


With reference to FIG. 1, a direct-drive shaftless permanent magnet hydroelectric turbine generator is described in PCT Application No. PCT/EP2007/006258. The generator 10 comprises a ring-shaped stator 12 and a rotor 14, the stator 12 having a plurality of coils (not shown) located about the circumference of the stator 12. The rotor 14 comprises an inner rim 16, which defines an open centre. The rotor 14 further comprises an array of generally radially extending blades 18 captured between the inner rim 16 and an outer rim 20. The rotor 14 further comprises an array of magnets (not shown) disposed about the outer rim 20. The stator 12 concentrically surrounds the rotor 14, with the plurality of coils providing a magnetic flux return path for the magnets.


The generator 10 is positioned in an area of tidal flow, such that the motion of the seawater through the generator 10 acts on the blades 18, resulting in rotation of the rotor 14 within the stator 12. The motion of the magnets relative to the coils of the stator 12 causes the magnetic field generated by the magnets to induce an EMF in each of the coils. These induced EMFs provide the electrical power output from the turbine generator 10.


In the interests of accepted good practice, it is understood that certain safety rules should be followed when undertaking the installation and connection of high voltage electrical equipment, e.g. the equipment should be switched out from all possible points of supply; isolated from all possible points of supply; safeguarded by safety padlocks being applied at switch points; and connected to earth by circuit main earths.


While the above criteria can be easily adhered to when dealing with above sea electrical equipment, the problem associated with isolation of an underwater turbine generator largely comes from the inaccessibility of switchgear, and the need to energise and de-energise the turbine generator from a significant distance away (e.g. from an on-shore power substation).


It is therefore the object of this method patent to provide a method for installing and connecting a hydroelectric turbine generator that provides certainty and safety, and reduces the operations required in potentially hazardous conditions.


SUMMARY OF THE INVENTION

Accordingly, there is provided a method of installing a sub sea tidal hydroelectric turbine generator and connecting the turbine generator to a supply grid using a submarine power cable, wherein the hydroelectric turbine generator comprises an electrical braking system operable to apply an electrical brake to the turbine upon interruption of a control signal, wherein the control signal is transmitted from a controller at a connection point to said supply grid through said submarine power cable, the method comprising the steps of:

    • (i) laying a submarine power cable into position, the submarine power cable extending from a first end, at a connection point to a supply grid, to a second end, at an installation site where it is desired to install a sub sea tidal hydroelectric turbine generator;
    • (ii) connecting the submarine power cable to the connection point;
    • (iii) switching the submarine power cable out from the supply grid using a supply switch;
    • (iv) isolating the submarine power cable from the supply grid using an isolating switch, connecting the power cable to earth;
    • (v) applying a safety padlock to the supply switch and the isolating switch;
    • (vi) interrupting the control signal at said controller by opening a control switch, applying an electrical brake to the turbine generator;
    • (vii) applying a safety padlock to the control switch;
    • (viii) deploying said hydroelectric turbine generator at said installation site;
    • (ix) connecting the submarine power cable to said hydroelectric turbine generator;
    • (x) removing the safety padlock from to the supply switch and the isolating switch;
    • (xi) disconnecting the power cable from earth using the isolating switch;
    • (xii) switching the power cable on to the supply grid using the supply switch;
    • (xiii) removing the safety padlock from the control switch; and
    • (xiv) closing the control switch, such that the electrical brake is removed from the turbine generator, and allowing the generator to commence generation.


As the turbine generator is being lowered into position on site, it is impossible for the turbine to start spinning during installation. This is because the latched contactor cannot change state without a supply signal, which can only be applied through the submarine power cable, the cable remaining unconnected to the turbine generator until after the generator has been deployed. Also, the electrical braking system of the turbine generator requires the receipt of a control signal before the electrical brake can be released from the turbine. As the control signal is transmitted via the submarine power cable, it is impossible for the brake to be released without the power cable being connected to the generator. Thus the installation personnel can be assured that the turbine will not start spinning while the generator is being deployed. Furthermore, as the submarine power cable is switched out and isolated from the main supply grid, installation personnel can safely handle the power cable during the installation operation as it is not live.


Preferably, the method further comprises the step of testing that all sub sea circuits are dead, prior to step (ix).


It is important from a safety aspect that it is certain that all sub sea circuits are dead and are securely cut off from the supply before deployment of the generator, to ensure that there is no danger of electrical shocks and/or movement of the turbine during installation.


Preferably, steps (ii)-(viii) and (xi)-(xvi) are performed at said connection point.


As the majority of the steps can be performed remote to the installation site of the turbine generator, this reduces the number of steps that must be performed at the off-shore site, and correspondingly reduces risks associated with operating in variable weather conditions.


Preferably, the method further comprises the steps of:

    • (a) recording a location designation associated with the second end of the submarine power cable once the power cable has been switched out and isolated; and
    • (b) prior to step (ix), verifying that the turbine deployment is occurring at the location designation associated with the second end of said particular submarine power cable.


The implementation of a dedicated verification step means that the turbine generator will only be deployed at the correct location, and ensures that the installation operatives will not be connecting the turbine generator to a potentially live submarine power cable.


Preferably, said location designation comprises GPS co-ordinates.


Preferably, the method further comprises the steps of:

    • (a) closing a latched contactor on the hydroelectric turbine generator to connect the positive and negative output terminals of the hydroelectric turbine generator to earth prior to deploying said hydroelectric turbine generator at said installation site; and
    • (b) after the deployment of said hydroelectric turbine generator at said installation site, opening the latched contactor to disconnect the output terminals of the hydroelectric turbine generator from earth.


Preferably, step (ix) further comprises deploying said hydroelectric turbine generator at said installation site such that the axis of the turbine is aligned with the direction of the prevailing tidal current at said installation site.


As the turbine generator is aligned with the tidal current, this provides for the optimum performance of the turbine at the installation site.


Preferably, the hydroelectric turbine generator comprises a generator cable for connecting the generator to a submarine power cable, and wherein step (x) further comprises recovering the second end of said submarine power cable and said generator cable to an installation vessel for connection, wherein the submarine power cable and the generator cable act to stabilise the installation vessel in position at said installation site.


The submarine power cable and the generator cable of the installed generator provide a mooring facility for the installation vessel, helping to stabilise the installation site at the off-shore location.


There is also provided a method of installing an array of hydroelectric turbine generators, comprising the steps of installing a single hydroelectric turbine generator as described above, wherein the hydroelectric turbine generator further comprises an expansion cable for connecting to a further hydroelectric turbine generator, such that a plurality of hydroelectric turbine generators can be daisy-chained together, and wherein the method further comprises the steps of:

    • (a) deploying a successive hydroelectric turbine generator at a successive installation site;
    • (b) connecting the expansion cable of the preceding hydroelectric turbine generator to the generator cable of the successive hydroelectric turbine generator; and
    • (c) repeating steps (a) and (b) for each of the hydroelectric turbine generators in the array, wherein steps (a)-(c) are performed prior to steps (xi)-(xvi).


As the hydroelectric turbine generators can be daisy-chained together in series, the installation of an array of turbines is carried out with the entire string of turbines isolated, earthed and locked. The entire array of turbines is then energised together.





DETAILED DESCRIPTION OF THE INVENTION

An embodiment of the invention will now be described, by way of example only, with reference to the accompanying drawings, in which:



FIG. 1 is an isometric view of a prior art hydroelectric turbine generator;



FIG. 2 is an outline of a sample configuration used for the installation and connection of a hydroelectric turbine generator to a supply grid;



FIG. 3 is a view of an installation vessel and a hydroelectric turbine generator prior to deployment at an installation site; and



FIG. 4 is a view of an installation vessel and a hydroelectric turbine generator after deployment at an installation site.





With reference to FIG. 2, an overall view is presented of a sample circuit scheme for the installation of a hydroelectric turbine generator 10. The generator 10 is installed at an installation site in an area of tidal flow, the generator 10 being provided on a seabed mounted support structure 22. The generator 10 further comprises a generator cable 24, operable to connect a generator 10 with a submarine power cable, the generator cable 24 comprising the appropriate power lines for connection to the output terminals of the generator 10.


The generator 10 may further comprise an expansion cable 26, the expansion cable 26 comprising a further set of power lines coupled to the power lines of the generator cable 24, the expansion cable 26 allowing for a series of separate generators 10 to be daisy-chained together, so that the output of a series of generators 10 can be connected to a single submarine power cable.


The generator 10 comprises a set of mechanically latched two pole DC contactors 28, the contactors 28 connected between the generator's 10 positive output and earth, and between the generator's 10 negative output and earth. The contactors 28 are controlled by a DC control wire 30, the input to the DC control wire 30 received from the generator cable 24.


The generator 10 may also comprise an electrical braking system (not shown), the electrical braking system operable to apply a short circuit across at least a portion of the coils in the generator 10, in order to apply an electrical brake to the turbine and to prevent rotation of the turbine. The electrical braking system is actuated by a control signal received from the generator cable 24, such that if there is an interruption to the supply of the control signal the electrical brake is applied.


An on-shore substation is indicated generally at 32. The substation 32 comprises a connection 34 to a voltage source, e.g. a supply grid. The substation also comprises a plurality of controller 36, the controllers 36 operable to generate control signals for the generators 10.


The substation 32 is connected to a submarine power cable 38. The cable is laid from a first point at the substation 32 to a second point where it is desired to install the generator 10. The cable 38 comprises power core lines to transmit power generated by the generator 10, and at least one control wire for the transmission of control signals from the substation 32 to the generator 10. The power cable 38 is connected to the substation 32.


The substation 32 further comprises supply switches 40 connecting the power lines of cable 38 with the voltage source connection 34, and isolation switches 42 connecting the power lines of cable 38 with earth.


The substation 32 further comprises a controller voltage source 44 operable to provide power to the controllers 36, the controller voltage source 44 connected to the controllers 36 via a controller supply switch 46.


In preparation for turbine deployment and connection, the mechanically latched contactor 28 is set in the closed position, connecting the generator's 10 positive and negative output terminals to earth. The latched position of this contactor is tested and verified by the senior authorised electrical person (SAEP) for the installation operation, who will be responsible for the upcoming offshore electrical works.


Prior to deployment, the supply switch 40 should be opened, and the isolation switch 42 should be closed. This operation is witnessed by the SAEP. These two switch arrangements are then secured with a safety padlock, and possession of the key is retained by the SAEP.


Prior to deployment the controller supply switch 46 for the controllers 36 is also opened, and padlocked in place. The key for this lock should be also be retained by the SAEP.


The SAEP shall ensure that all sub sea circuits are dead, by using a calibrated voltage testing device while at the on-shore substation.


Only when the SAEP is satisfied with the turbine generator isolation arrangement (by the closing of the contactor 28 and the cutting of the supply to the controllers 36), the onshore substation isolation (by the opening of the supply switch 40 and the closing of the isolation switch 42), and has possession of all the keys of the safety padlocks can offshore operations commence. The SAEP is required to give approval for departure once they are satisfied with the above.


Prior to departure, the SAEP records location information regarding the end of the submarine power cable 38 that has just been disconnected from the supply and isolated.


With reference to FIG. 3, once the installation site 52 is reached, the SAEP is responsible for verifying that the GPS coordinates of the installation vessel 50 coincide with the co-ordinates of the recorded position of the particular cable end that was isolated above. Once this has been verified, the deployment of the turbine generator 10 at the installation site 52 may commence.


The turbine generator 10 is deployed with the mechanically latched contactor 28 in the closed position. The SAEP and working party can be safe in the knowledge that it is impossible for the turbine generator 10 to start spinning during deployment, due to the fact that the submarine power cable 38 is not connected, and therefore it is impossible for the contactor 28 to change state, or for the electrical brake to release. This serves a similar function as the onshore padlocks.


With reference to FIG. 4, the generator 10 and the support structure 22 are lowered to the seabed 54 with the generator cable 24 and the extension cable 26 being paid out under tension from the deck of the turbine deployment vessel 50 as described in FIG. 3. Once the turbine generator 10 is positioned on the seabed 54, the vessel 50 begins to lay out the two cable tails 24,26. The ends of the cables 24,26 are deployed with a clump weight (not shown). The ends of the cables can be handled with no risk of becoming electrically live, as it is impossible for the latched contactor 28 to change position, or for the electrical braking system to disengage, without a supply. Supply is not available until the cable 38 is completely connected to the generator cable 24 and unlocked back at the on-shore substation 32. The contactors 28 also connect the generator cable 24 (and therefore the extension cable 26) to a local earth point, so the cables 24,26 are well earthed.


The end of the submarine power cable 38 and the end of the generator cable 24 can then be recovered to the deck of the cable installation vessel 50, and joined to connect the generator cable 24 to the on-shore substation 32. The generator cable 24 is safe to handle during this jointing procedure, as it is not possible to make it live until the cable joint has been complete. Further reassurance is provided by the fact that the supply to the submarine power cable 38 is padlocked in the open position (supply switch 40), and the key for this lock is in possession of the SAEP in charge of the cable connection.


Since the turbine generator axes are aligned with the current, during the cable jointing operation the vessel 50 will be aligned with the current, with twin cable catenaries spread from her stem. The generator cable 24 and its attachment to the tidal turbine support structure 22 will be of sufficient strength to allow it to be used to provide significant mooring force. Without exceeding the maximum allowable tension on the cables, the two cable catenaries of the generator cable 30 and the submarine power cable 24 will provide a reference and stabilising effect to assist vessel positioning which is generally a high risk factor when carrying out jointing operations in high-energy tidal sites.


Once the cable joint is completed, the ends of the two cables 38,24 will be lowered to the seabed 54.


The offshore operation is now completed. The turbine generator 10 can now be commissioned and made live from the on-shore substation 32. The SAEP returns to the on-shore substation 32, and all safety padlocks are removed.


The isolation switch 42 is opened, disconnecting the power cable 38 from earth. The supply switch 40 is closed, connecting the power cable 38 to the load. The controller supply switch 46 is turned on. It is now possible to release the sub sea mechanically latched contactor 28 using the appropriate controller 36. Once the sub sea switch 28 state is changed, the electrical brake is released, and generation can commence.


Through use of an earth return circuit on the control coil of the contactor 28 only one control wire is needed per turbine generator 10. It will be noted that there are a limited number of control wires in a submarine power cable 38 and therefore a limited number of turbine generators 10 that can be fitted onto a single submarine power cable 38. By use of an earth return circuit for control, it effectively doubles the number of turbine generators 10 able to be controlled from a single power cable 38. Also, the voltage drop is halved, as the earth return circuit resistance is very small due to the large support structure 22 immersion in sea water. A continuous flow of control current may lead to corrosion over time or navigational interference. The use of a latched contactor 28 means control signals can be pulsed through the earth, and therefore has no impact on corrosion or the environment.


A second turbine can be added to the array at a later date using the same method as detailed above. The entire turbine string will need to be isolated, earthed and locked before a second turbine can be added. The entire string of turbines is then energised together.

Claims
  • 1. A method of installing a sub sea tidal hydroelectric turbine generator and connecting the hydroelectric turbine generator to a supply grid using a submarine power cable, wherein the hydroelectric turbine generator comprises an electrical braking system operable to apply an electrical brake to the hydroelectric turbine generator upon interruption of a control signal, wherein the control signal is transmitted from a controller at a connection point to said supply grid through said submarine power cable, the method comprising the steps of: (i) laying a submarine power cable into position, the submarine power cable extending from a first end, at a connection point to a supply grid, to a second end, at an installation site where it is desired to install the sub sea tidal hydroelectric turbine generator;(ii) connecting the submarine power cable to the connection point;(iii) switching the submarine power cable out from the supply grid using a supply switch;(iv) isolating the submarine power cable from the supply grid using an isolating switch, connecting the submarine power cable to earth;(v) applying a safety padlock to the supply switch and the isolating switch;(vi) interrupting a control signal at said controller by opening a control switch, applying an electrical brake to the turbine generator;(vii) applying a safety padlock to the control switch;(viii) deploying said hydroelectric turbine generator at said installation site;(ix) connecting the submarine power cable to said hydroelectric turbine generator;(x) removing the safety padlock from to the supply switch and the isolating switch;(xi) disconnecting the power cable from earth using the isolating switch;(xii) switching the power cable on to the supply grid using the supply switch;(xiii) removing the safety padlock from the control switch; and(xiv) closing the control switch, such that the electrical brake is removed from the hydroelectric turbine generator, and allowing the hydroelectric turbine generator to commence generation.
  • 2. The method of claim 1, wherein the method further comprises the step of testing that all sub sea circuits are dead, prior to step (ix).
  • 3. The method of claim 1, wherein steps (ii)-(viii) and (xi)-(xiv) are performed at said connection point.
  • 4. The method as claimed in claim 1, wherein the method further comprises the steps of: (a) recording a location designation associated with the second end of the submarine power cable once the submarine power cable has been switched out and isolated; and(b) prior to step (ix), verifying that the hydroelectric turbine generator deployment is occurring at the location designation associated with the second end of said particular submarine power cable.
  • 5. The method as claimed in claim 4, wherein said location designation comprises GPS co-ordinates.
  • 6. The method as claimed in claim 1, wherein the method further comprises the steps of: (a) closing a latched contactor on the hydroelectric turbine generator to connect the positive and negative output terminals of the hydroelectric turbine generator to earth prior to deploying said hydroelectric turbine generator at said installation site; and(b) after the deployment of said hydroelectric turbine generator at said installation site, opening the latched contactor to disconnect the output terminals of the hydroelectric turbine generator from earth.
  • 7. The method as claimed in claim 1, wherein step (ix) further comprises deploying said hydroelectric turbine generator at said installation site such that the axis of the turbine is aligned with the direction of the prevailing tidal current at said installation site.
  • 8. The method as claimed in claim 1, wherein the hydroelectric turbine generator comprises a generator cable for connecting the hydroelectric turbine generator to a submarine power cable, and wherein step (x) further comprises recovering the second end of said submarine power cable and said generator cable to an installation vessel for connection, wherein the submarine power cable and the generator cable act to stabilise the installation vessel in position at said installation site.
  • 9. A method of installing an array of hydroelectric turbine generators, comprising the steps of installing a single hydroelectric turbine generator as claimed in claim 1, wherein the hydroelectric turbine generator further comprises an expansion cable for connecting to a further hydroelectric turbine generator, such that a plurality of hydroelectric turbine generators can be daisy-chained together, and wherein the method further comprises the steps of: (a) deploying a successive hydroelectric turbine generator at a successive installation site;(b) connecting the expansion cable of the preceding hydroelectric turbine generator to the generator cable of the successive hydroelectric turbine generator; and(c) repeating steps (a) and (b) for each of the hydroelectric turbine generators in the array, wherein steps (a)-(c) are performed prior to steps (xi)-(xiv).
Priority Claims (1)
Number Date Country Kind
08022164 Dec 2008 EP regional
PCT Information
Filing Document Filing Date Country Kind 371c Date
PCT/EP2009/009067 12/17/2009 WO 00 8/23/2011
Publishing Document Publishing Date Country Kind
WO2010/069569 6/24/2010 WO A
US Referenced Citations (137)
Number Name Date Kind
228467 Maclay Jun 1880 A
928536 Pino Jul 1909 A
1710103 Nelson Apr 1929 A
2054142 Sharp Sep 1936 A
2470797 Thomas May 1949 A
2501696 Souczek Mar 1950 A
2563279 Rushing Aug 1951 A
2658453 Walters Nov 1953 A
2782321 Fischer Feb 1957 A
2792505 Baudry May 1957 A
2874547 Fiore Feb 1959 A
3078680 Wapsala Feb 1963 A
3209156 Struble, Jr. Sep 1965 A
3292023 Korber Dec 1966 A
3342444 Nelson Sep 1967 A
3355998 Roemisch Dec 1967 A
3384787 Schwartz May 1968 A
3422275 Braikevitch et al. Jan 1969 A
3433024 Diamond et al. Mar 1969 A
3469627 Baker Sep 1969 A
3477236 Burrus Nov 1969 A
3487805 Satterthwaite et al. Jan 1970 A
3708251 Pierro Jan 1973 A
3986787 Mouton, Jr. et al. Oct 1976 A
3987638 Burkhardt et al. Oct 1976 A
4095918 Mouton et al. Jun 1978 A
4163904 Skendrovic Aug 1979 A
4219303 Mouton, Jr. et al. Aug 1980 A
4274009 Parker, Sr. Jun 1981 A
4367413 Nair Jan 1983 A
4421990 Heuss et al. Dec 1983 A
4427897 Migliori Jan 1984 A
4496845 Ensign et al. Jan 1985 A
4523878 Richart et al. Jun 1985 A
4541367 Lindberg Sep 1985 A
4613762 Soderholm Sep 1986 A
4720640 Anderson et al. Jan 1988 A
4744697 Coppens May 1988 A
4744698 Dallimer et al. May 1988 A
4810135 Davenport et al. Mar 1989 A
4867605 Myers et al. Sep 1989 A
4868408 Hesh Sep 1989 A
4868970 Schultz et al. Sep 1989 A
4990810 Newhouse Feb 1991 A
5412167 Mueller et al. May 1995 A
5495221 Post Feb 1996 A
5517383 Webb May 1996 A
5592816 Williams Jan 1997 A
5606791 Fougere et al. Mar 1997 A
5609441 Khachaturian Mar 1997 A
5656880 Clark Aug 1997 A
5662434 Khachaturian Sep 1997 A
5715590 Fougere et al. Feb 1998 A
5800093 Khachaturian Sep 1998 A
5998905 Fougere et al. Dec 1999 A
6039506 Khachaturian Mar 2000 A
6109863 Milliken Aug 2000 A
6113314 Campbell Sep 2000 A
6166472 Pinkerton Dec 2000 A
6168373 Vauthier Jan 2001 B1
6232681 Johnston et al. May 2001 B1
6242840 Denk et al. Jun 2001 B1
6293734 Thomas et al. Sep 2001 B1
6300689 Smalser Oct 2001 B1
6367399 Khachaturian Apr 2002 B1
6406251 Vauthier Jun 2002 B1
6409466 Lamont Jun 2002 B1
6445099 Roseman Sep 2002 B1
6476709 Wuidart et al. Nov 2002 B1
6612781 Jackson Sep 2003 B1
6648589 Williams Nov 2003 B2
RE38336 Williams Dec 2003 E
6729840 Williams May 2004 B2
6770987 Sogard et al. Aug 2004 B1
6777851 Maslov Aug 2004 B2
6806586 Wobben Oct 2004 B2
6840713 Schia et al. Jan 2005 B1
6843191 Makotinsky Jan 2005 B1
6857821 Steenhuis et al. Feb 2005 B2
6894416 Leijon et al. May 2005 B1
6957947 Williams Oct 2005 B2
6998730 Tharp Feb 2006 B2
7190087 Williams Mar 2007 B2
D543495 Williams et al. May 2007 S
7275891 Owen et al. Oct 2007 B2
7352078 Gehring Apr 2008 B2
7378750 Williams May 2008 B2
7425772 Novo Vidal Sep 2008 B2
7471009 Davis et al. Dec 2008 B2
7527006 Khachaturian May 2009 B2
7611307 Owen et al. Nov 2009 B2
7845296 Khachaturian Dec 2010 B1
7874788 Stothers et al. Jan 2011 B2
7976245 Finnigan Jul 2011 B2
20020034437 Williams Mar 2002 A1
20030044272 Addie et al. Mar 2003 A1
20030137149 Northrup et al. Jul 2003 A1
20030155829 McMullen et al. Aug 2003 A1
20030168864 Heronemus et al. Sep 2003 A1
20030193198 Wobben Oct 2003 A1
20030218338 O'Sullivan et al. Nov 2003 A1
20040021386 Swett Feb 2004 A1
20040021437 Maslov et al. Feb 2004 A1
20040201299 Naritomi et al. Oct 2004 A1
20040227500 O'Meara Nov 2004 A1
20040232792 Enfourth Nov 2004 A1
20040262926 Hansen Dec 2004 A1
20050001432 Drentham Susman et al. Jan 2005 A1
20050005592 Fielder Jan 2005 A1
20050031442 Williams Feb 2005 A1
20050073151 Diamontopoulos Apr 2005 A1
20060261597 Gehring Nov 2006 A1
20070018459 Williams Jan 2007 A1
20070063448 Kowalczyk Mar 2007 A1
20070164626 Taniguchi et al. Jul 2007 A1
20070231072 Jennings et al. Oct 2007 A1
20070241566 Kuehnle Oct 2007 A1
20070262668 Brisson et al. Nov 2007 A1
20070291426 Kasunich et al. Dec 2007 A1
20080012538 Stewart et al. Jan 2008 A1
20090162144 Ayre Jun 2009 A1
20090278351 Rivas et al. Nov 2009 A1
20090278357 Williams Nov 2009 A1
20100025998 Williams Feb 2010 A1
20100026002 Spooner Feb 2010 A1
20100068037 Ives Mar 2010 A1
20100133838 Borgen Jun 2010 A1
20100172698 Ives et al. Jul 2010 A1
20100201129 Holstein et al. Aug 2010 A1
20100232885 Ives et al. Sep 2010 A1
20100295388 Ives et al. Nov 2010 A1
20110018274 Ives et al. Jan 2011 A1
20110088253 Ives et al. Apr 2011 A1
20110110770 Spooner et al. May 2011 A1
20110305518 Pearce et al. Dec 2011 A1
20120187680 Spooner et al. Jul 2012 A1
20120235412 Dunne et al. Sep 2012 A1
Foreign Referenced Citations (99)
Number Date Country
2388513 Aug 2000 CA
2352673 Jan 2003 CA
260699 Apr 1947 CH
146935 Aug 1983 CH
3116740 Nov 1982 DE
3638129 May 1988 DE
3718954 Dec 1988 DE
19948198 Apr 2001 DE
10101405 Jul 2002 DE
20308901 Sep 2003 DE
10244038 Apr 2004 DE
102007016380 Oct 2008 DE
1318299 Dec 2003 EP
1564455 Jan 2005 EP
1691377 Feb 2006 EP
1863162 Dec 2007 EP
1876350 Jan 2008 EP
1878912 Jan 2008 EP
1878913 Jan 2008 EP
1879280 Jan 2008 EP
1878911 Sep 2008 EP
1992741 Nov 2008 EP
1885047 Dec 2008 EP
1980670 Jul 2009 EP
2088311 Aug 2009 EP
2110910 Oct 2009 EP
2112370 Oct 2009 EP
1980746 Jun 2010 EP
2199199 Jun 2010 EP
2199598 Jun 2010 EP
2199599 Jun 2010 EP
2199601 Jun 2010 EP
2199602 Jun 2010 EP
2199603 Jun 2010 EP
2200170 Jun 2010 EP
2071709 Sep 2010 EP
2209175 Sep 2010 EP
2241749 Oct 2010 EP
2302204 Mar 2011 EP
2302755 Mar 2011 EP
2302766 Mar 2011 EP
2823177 Oct 2002 FR
2859495 Mar 2005 FR
204505 Oct 1923 GB
924347 Apr 1963 GB
980575 Jan 1965 GB
1131352 Oct 1968 GB
1413835 Nov 1975 GB
2316461 Feb 1998 GB
2344843 Jun 2000 GB
2408294 May 2005 GB
2431628 May 2007 GB
2434413 Jul 2007 GB
2447514 Sep 2008 GB
59203881 Nov 1984 JP
63055370 Mar 1988 JP
01043908 Feb 1989 JP
2000341818 Dec 2000 JP
2005069025 Mar 2005 JP
2005248822 Sep 2005 JP
2006-109560 Apr 2006 JP
2006094645 Apr 2006 JP
2007255614 Oct 2007 JP
2007291882 Nov 2007 JP
9844372 Oct 1998 WO
9852819 Nov 1998 WO
9966623 Dec 1999 WO
0077393 Dec 2000 WO
0134973 May 2001 WO
0134977 May 2001 WO
02099950 Dec 2002 WO
03014561 Feb 2003 WO
03025385 Mar 2003 WO
03046375 Jun 2003 WO
2004015264 Feb 2004 WO
2004027257 Apr 2004 WO
2004107549 Dec 2004 WO
2004113717 Dec 2004 WO
2005045243 May 2005 WO
2005061887 Jul 2005 WO
2005078233 Aug 2005 WO
2005080789 Sep 2005 WO
2005116443 Dec 2005 WO
2006029496 Mar 2006 WO
2007043894 Apr 2007 WO
2007055585 May 2007 WO
2007083105 Jul 2007 WO
2007086814 Aug 2007 WO
2007125349 Nov 2007 WO
WO2007125349 Nov 2007 WO
2008004877 Jan 2008 WO
2008006614 Jan 2008 WO
2008050149 May 2008 WO
2008081187 Jul 2008 WO
2009016409 Feb 2009 WO
WO2010118766 Oct 2010 WO
WO2011039249 Apr 2011 WO
WO2011039255 Apr 2011 WO
WO2011039267 Apr 2011 WO
Non-Patent Literature Citations (8)
Entry
U.S. Appl. No. 47/407,111, filed Apr. 26, 1988, Sato et al.
U.S. Appl. No. 13/133,235, filed Jun. 7, 2011, including the specification, claims and drawings.
U.S. Appl. No. 13/133,504 filed Jun. 8, 2011, including the specification, claims and drawings.
U.S. Appl. No. 13/133,507 filed Jun. 8, 2011, including the specification, claims and drawings.
U.S. Appl. No. 13/133,832 filed Jun. 9, 2011, including the specification, claims and drawings.
U.S. Appl. No. 13/264,667 filed Oct. 14, 2011, including specification, claims and drawings.
International Search Report completed May 26, 2011, mailed Jun. 7, 2011, from corresponding Application No. PCT/EP2009/009067.
PCT Written Opinion of International Searching Authority, May 26, 2011, from corresponding Application No. PCT/EP2009/009067.
Related Publications (1)
Number Date Country
20120027522 A1 Feb 2012 US