Claims
- 1. A method of making a hole for a foundation pile such as a cast-in-situ pile, comprising the steps of:
- boring a hole with a drilling machine;
- setting up in said hole a casing provided with a horizontal pressing device on an outer peripheral portion thereof; and
- pressing surrounding ground of said bored hole with said horizontal pressing device for outward displacement a controlled amount over a contiguous surface of vertically adjacent sections by application of pressure responsive to a feedback of an amount of displacement of said surrounding ground in each of said vertically adjacent sections to deform said surrounding ground a controlled amount, said contiguous surface substantially covering an interior vertical surface of said hole, said application of pressure to each of said vertically adjacent sections being discontinued when an amount of said pressure reaches a predetermined value, said predetermined value being selected to provide a desired compactness of said surrounding ground following displacement thereof.
- 2. A method according to claim 1 wherein the arbitrary shape of the wall of the bored hole is tapered in a direction going deeper into the bored hole.
- 3. A method according to claim 1, wherein the arbitrary shape of the wall of the bored hole has at least one irregular portion on a surface of the wall of the bored hole.
- 4. A method of making a hole for a foundation pile such as a cast-in-situ pile, comprising the steps of:
- boring a hole with a drilling machine;
- setting up in said hole a casing provided with a vertical pressing device having an annular pressure surface circumferentially disposed about said drilling machine on an outer peripheral portion of a lower end of said casing; and
- pressing bottom ground of the bored hole with both said vertical pressing device and a bottom face of the drilling machine when the casing reaches a predetermined depth, said vertical pressing device imparting downward movement to said bottom face, said step of pressing being carried out without removal of said drilling machine from said hole following said step of boring.
- 5. A method for making a hole for a foundation pile, comprising the steps of:
- (a) boring a hole to an initial predetermined depth, at which time said boring is terminated;
- (b) applying horizontal pressure over a vertical portion of predetermined height of an inner circumferential surface of said hole, said vertical portion being substantially equal to said predetermined depth;
- (c) resuming said boring to increase a depth of said hole a distance substantially equal to said initial predetermined depth at which time said boring is again terminated; and
- (d) applying horizontal pressure over a subsequent vertical portion of an inner circumferential surface of said hole vertically adjacent to said vertical portion pressed in a preceding step of applying horizontal pressure, said subsequent vertical portion being about equal in height to said predetermined height of said vertical portion, said horizontal pressure applied in at least one of steps (b) and (d) being discontinued when an amount of said pressure reaches a predetermined value, said predetermined value being selected to provide a desired compactness of said surrounding ground following displacement thereof.
- 6. A method for making a hole for a foundation pile, comprising the steps of:
- (a) boring a hole to an initial predetermined depth, at which time said boring is terminated;
- (b) applying horizontal pressure over a vertical portion of predetermined height of an inner circumferential surface of said hole, said vertical portion being substantially equal to said predetermined depth;
- (c) resuming said boring to increase a depth of said hole a distance substantially equal to said initial predetermined depth at which time said boring is again terminated; and
- (d) applying horizontal pressure over a subsequent vertical portion of an inner circumferential surface of said hole vertically adjacent to said vertical portion pressed in a preceding step of applying horizontal pressure, said subsequent vertical portion being about equal in height to said predetermined height of said vertical portion, said horizontal pressure applied in at least one of steps (b) and (d) is non-uniformly applied, increasing in the vertical direction, whereby said hole is enlarged and vertically tapered over said vertical portion and said subsequent vertical portion to which said horizontal pressure is respectively applied.
- 7. The method according to claim 5, wherein:
- said horizontal pressure applied in steps (b) and (d) is individually applied over a plurality of radially divided sectors, each of said plurality of radially divided sectors being individually monitored for an amount of displacement of ground surrounding an interior surface of said hole adjacent with each of said plurality of radially divided sectors, and an amount of individual pressure being applied in response thereto, to each of said plurality of said radially divided sectors, to displace said ground surrounding said interior surface of said hole adjacent with each of said plurality of radially divided sectors a controlled amount.
- 8. The method according to claim 7, wherein:
- said ground surrounding said interior surface of said hole adjacent with each of said plurality of radially divided sectors is displaced substantially the same amount, whereby said hole is enlarged coaxially.
- 9. A method for making a hole for a foundation pile, comprising the steps of:
- (a) boring a hole to an initial predetermined depth, at which time said boring is terminated;
- (b) applying horizontal pressure over a vertical portion of predetermined height of an inner circumferential surface of said hole;
- (c) resuming said boring to increase a depth of said hole a distance substantially equal to said initial predetermined depth at which time said boring is again terminated;
- (d) applying horizontal pressure over a subsequent vertical portion of an inner circumferential surface of said hole vertically adjacent to a vertical portion pressed in a preceding step of applying horizontal pressure, said subsequent vertical portion being substantially equal in height to said predetermined height, said horizontal pressure applied in at least one of steps (b) and (d) being discontinued when an amount of said pressure reaches a predetermined value, said predetermined value being selected to provide a desired compactness of said surrounding ground following displacement thereof;
- (e) applying vertical pressure over a circumferential annular surface area within said hole, and over a central circular area surrounded by, and adjacent to, said circumferential annular surface area.
Priority Claims (2)
Number |
Date |
Country |
Kind |
63-334698 |
Dec 1988 |
JPX |
|
1-203635 |
Aug 1989 |
JPX |
|
Parent Case Info
This application is a continuation, of application Ser. No. 08/532,381, filed Sep. 22, 1995, now abandoned, which is a continuation of application Ser. No. 08/056,802, filed Dec. 30, 1992, now abandoned, which is a continuation of application Ser. No. 07/591,331, filed Oct. 1, 1990, now abandoned, which is a divisional of application Ser. No. 07/457,206, filed Dec. 26, 1989, now U.S. Pat. No. 5,099,696.
US Referenced Citations (5)
Foreign Referenced Citations (5)
Number |
Date |
Country |
1238773 |
Jul 1960 |
FRX |
676088 |
May 1939 |
DEX |
0007417 |
Jan 1988 |
JPX |
0184612 |
Jul 1988 |
JPX |
1102682 |
Feb 1968 |
GBX |
Divisions (1)
|
Number |
Date |
Country |
Parent |
457206 |
Dec 1989 |
|
Continuations (3)
|
Number |
Date |
Country |
Parent |
532381 |
Sep 1995 |
|
Parent |
056802 |
Dec 1992 |
|
Parent |
591331 |
Oct 1990 |
|